Location Sketch
Location Sketch
DOORS :-
D : 110X 210 2
D1 : 90X 210 6
D2 : 90X 210 3
PLOT OF MEPPULLI MANI WINDOWS :-
PLOT OF
MEPPULLI PERUMBAVOOR FW3 : 150X 180 1
MANI -
KOTHAMANGALAM FW2 : 100X 180 1
2316 ROAD
FW1 : 50X 180 1
W3 : 150X 180 6
236 184 150 225 PLOT OF
ELAMKUTTIYIL
TEMPLE
W2 : 100X 180 2
790 360 MOHANAN &
SUKUMARAN
PLOT PLOT OF
CIVIL
STATION KW3 : 150X 100 1
528 VADAKKEVEETIL
SHEELA
VENTILATOR :-
V : 150X 180 3
742 PRO.HOUSE POOPANI
GURUKRIPA
PRIVATE
ROAD
G.F F.F
SHEELA
CANAL
ROAD
771 360
CANAL
NEIGHBOURING
HOUSE
PLOT
OF
BUILT UP AREA 112.62 52.32 164.94
2634 2718 PLOT OF
GEORGE
KULANGARATHIL FLOOR AREA 112.62 52.32 164.94
MADASSERY LALU
ROAD
MOHANAN AND SUKUMARAN 1422 PLOT OF
COVERED AREA 112.62
1599
CANAL
MEPPULLI F S I ( FLOOR AREA / PLOT AREA ) 0.25
AUDITORIUM MANI
CANAL
EXI.WELL 222Ø
ROAD
BUILDING LINE COVERAGE
( COVERED AREA / PLOT AREA )
17.56%
360 PLOT AREA 404.6 M^2
160 ATE LOCATION PLAN
150 G ALL DIMENSIONS ARE IN CM
342 300 HOUSE
1098 SCALE 1:800 PREPARED BY
270 NO : 19
CANAL ROAD
APPLICANT
1377
ELE.POST GROUP 7
PVT.ROAD P/PK PLOT OF MADASSEY
CANAL
4/2013 LALU
GURUKRIPA ROAD
ENGINEER/LICENCEE
CANAL ROAD
CERTIFIED THAT THE PLAN &SITE PLAN ARE PREPARED AFTER VARIFICATION OF OWNERSHIP
CULVERT DOCUMENT AND SITE AND THE MEASUREMENTS SHOWN ARE FOUND TO BE CORRECT.
CANAL
SITE PLAN PLOT OF MEPPULLI MANI
CERTIFIED THAT THE DRAWINGS ARE IN CONFIRMITY WITH THE PROVISIONS OF THE MASTER
PLAN / DETAILED TOWN PLANNING SCHEME/ INTERIM DEVELOPMENT ORDER AS
SCALE 1: 400 APPLICABLE UNDER THE KERALA TOWN AND COUNTRY PLANNING ACT 2016.
CERTIFIED THAT THERE IS NO EXISTING WELL WITH IN 7.5M RADIUAL FROM SEPTIC TANK,
SOAK PIT AMD LEAK PIT.
GRAVEL
INLET PIPE 10 CM THICK 1:2:4
SECRETARY
SAND
30
FILTER
THE PLOT BOUNDARIES,MEASUREMENTS AND OTHER DETAILS SHOWN IN THESITE PLAN HAVE
10 G L 10 200
70
WATER
THE DRAWINGS ARE IN CONFORMITY WITH THE PROVISION OF THE MASTERPLAN /DETAILED
RCC WALL TOWN PLANNING SCHEME /INTERIM DEVELOPMENT ORDER AS APPLICABLE UNDER THE
180 THE DRAWINGS AREA IN CONFORMITY WITH THE PROVISIONS OF THE KERALA
RAIN WATER COLLECTION TANK BUILDING RULES ,2019 AND OTHER APPLICABLE STATUTES.
SECTIONAL ELEVATION
SECTION
10 PUMPING
TO
OVERHEAD
COLOUR SHEME
TANK
130
FILTER RAIN WATER COLLECTION TANK
OVERFLOW TANK
350