Stone Breaking 5

Stone Breaking 5

Uploaded by

rahul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

STONE BREAKING AND STONE CRUSHING OPERATIONS

Notification issued vide G.O.Ms.No.05, LET&F (Lab.II) Dept., dt:02-02-2008


Published in Gazette No.71, dated 14-02-2008
Wages Linked at 525 CPI points
CPI points notified as on 01.04.2024 = 1849 points
VDA to be paid from 01.04.2024 to 30.09.2024 = 1849 - 525 = 1324 points
Per point rate of VDA notified in the notification = Rs.6.05 & Rs.0.23 per day
Minimum Wages and VDA payable from 01.04.2024 to 30.09.2024

VDA for
Sl.N Basic Total
Name of the Category 1324
o. Wage Wage
points

1 2 3 4 5
1 Schedule-I
1 Accountant/ Cashier 5612 8010 13622
2 Typist/ Computer Operator 4386 8010 12396
3 Tally Clerk/ Store Keeper 4048 8010 12058
4 Peon/ Sweeper 3197 8010 11207
Minemate / Operator of Machine/ Driver of Motor,
5 191 305 496
Car, Jeep (per day)
Stone Polisher by Machine/ Helper under operators
6 of Machine or Crusher, fitter Mechanic, Folder or a 167 305 472
Blacksmith (per day)
7 Mazdoor working at crushing Machine (per day) 129 305 434
2 Schedule - II
1 Clerk/ Time Keeper 4386 8010 12396
2 Maistry 4111 8010 12121
3 Mukaddam (Head Mazdoor)/ Watchman 3197 8010 11207
Jack Hammer Driller/ Electrician/ Operator of
4 Crusher/ Lorry Driver/ Fitter/ Mechanic /Welder/ 191.00 305 496
Blacksmith/ Blaster or Short Loader (Per day)

5 Driller by Head/ Oilman/ Cleaner/ Hammerman/ 167.00 305 472


Stone Breaker (Per day)
PIECE RATE
(a) Rubber Granite per 100 sft. 585.00 1475 2060
(b) Rubber hardy variety other than (a) per 100 Cft. 497.00 1253 1750
© Rubber Soft variety Napa variety per 100 Cft 444.00 1120 1564
6 Metal Breaker (Exclusive for breaking metal from 144.00 363 507
rubber spplied) (per day)
PIECE RATE
(a) 3 Metal
(i) Granite per 100 Cft 505.00 1274 1779
(ii) Hard per 100 Cft 370.00 933 1303
(iii) Soft Per 100 Cft 298.00 752 1050

VDA for
Sl.N Basic Total
Name of the Category 1324
o. Wage Wage
points

1 2 3 4 5
(b) 1 1/2 Metal
(i) Granite per 100 Cft 653.00 1647 2300
(ii) Hard per 100 Cft 523.00 1319 1842
(iii) Soft Per 100 Cft 435.00 1097 1532
(c ) 1/4 Metal
(i) Granite per 100 Cft 1301.00 3281 4582
(ii) Hard per 100 Cft 1079.00 2721 3800
(iii) Soft Per 100 Cft 864.00 2179 3043
Flooring Slabs cutting (including sizing) Mazdoor 144.00 363 507
7 (per day)
PIECE RATE
Cuddapah, Macherla and Bethamcherla etc., Black 222.00 560 782
(a) variety themselves (per 100 Cft)
Item (a) Variety inclouding by the Mazdoors 401.00 1011 1412
(b) themselves (per 100 Cft)
8 Wagon Loading Mazdoor (per day) 144.00 363 507
PIECE RATE
(a) Flooring Slab per ton 30.00 76 106
(b) Stone rubble per ton 28.00 71 99
(c ) Metal per ton 40.00 101 141
9 Lorry Loading and Unloading (per day) 144.00 363 507
PIECE RATE

40.00 101 141


(a) Floor Slab (Loading and Unloading both inclusive)
(b) Stone rubble (Loading only ) per ton 28.00 71 99
(c ) Metal (Loading only) per ton 40.00 101 141
10 Dind breaking Mazdoor (per day) 123.00 310 433
(a) Piece rate per 100 Cft 2676.00 6749 9425
Earth work (including Porok therugu) Mazdoor (per 123.00 310 433
11 day)
(a) Piece rate per 100 Cft 1555.00 3922 5477
Laminate Stone (including napa variety etc.) Hand 123.00 310 433
12 Polishing Mazdoor (per day)
(a) Piece rate per 100 Cft 725.00 1828 2553
Other Mazdoor not include in any other item (per 123.00 310 433
13 day)
Name of the Employment: STONE BREAKING AND STONE CRUSHING
OPERATIONS

Cost of
Basic living
Wage allowan
proposed ce to be
Sl.N
Name of the Category in the draft paid per
o.
notificatio each
n ad 1768 point of
CPI points increase
( in Rs.)

1 2 3 4
1 Schedule-I
1 Accountant/ Cashier 13132 7.43
2 Typist/ Computer Operator 11906 6.73
3 Tally Clerk/ Store Keeper 11568 6.54
4 Peon/ Sweeper 10717 6.06
Minemate / Operator of Machine/ Driver of Motor, Car,
5 477 0.27
Jeep (per day)
Stone Polisher by Machine/ Helper under operators of
6 Machine or Crusher, fitter Mechanic, Folder or a 453 0.26
Blacksmith (per day)
7 Mazdoor working at crushing Machine (per day) 415 0.23
2 Schedule - II
1 Clerk/ Time Keeper 11906 6.73
2 Maistry 11631 6.58
3 Mukaddam (Head Mazdoor)/ Watchman 10717 6.06

Jack Hammer Driller/ Electrician/ Operator of Crusher/


4 Lorry Driver/ Fitter/ Mechanic /Welder/ Blacksmith/ 477 0.27
Blaster or Short Loader (Per day)
Driller by Head/ Oilman/ Cleaner/ Hammerman/ Stone
5 453 0.26
Breaker (Per day)
PIECE RATE
(a) Rubber Granite per 100 sft. 585 1381
(b) Rubber hardy variety other than (a) per 100 Cft. 497 1173
© Rubber Soft variety Napa variety per 100 Cft 444 1048
Metal Breaker (Exclusive for breaking metal from
6 430 0.24
rubber spplied) (per day)
PIECE RATE
(a) 3 Metal
(i) Granite per 100 Cft 505 1192
(ii) Hard per 100 Cft 370 873
(iii) Soft Per 100 Cft 298 703
(b) 1 1/2 Metal
(i) Granite per 100 Cft 653 1541
(ii) Hard per 100 Cft 523 1234
(iii) Soft Per 100 Cft 435 1027
(c ) 1/4 Metal
(i) Granite per 100 Cft 1301 3070
(ii) Hard per 100 Cft 1079 2546
(iii) Soft Per 100 Cft 864 2039
Flooring Slabs cutting (including sizing) Mazdoor (per
430 0.24
7 day)
PIECE RATE
Cuddapah, Macherla and Bethamcherla etc., Black
222 524
(a) variety themselves (per 100 Cft)
Item (a) Variety inclouding by the Mazdoors
401 946
(b) themselves (per 100 Cft)
8 Wagon Loading Mazdoor (per day) 430 0.24
PIECE RATE
(a) Flooring Slab per ton 30 71
(b) Stone rubble per ton 28 66
(c ) Metal per ton 40 94
9 Lorry Loading and Unloading (per day) 430 0.24
PIECE RATE
(a) Floor Slab (Loading and Unloading both inclusive) 40 94
(b) Stone rubble (Loading only ) per ton 28 66
(c ) Metal (Loading only) per ton 40 94
10 Dind breaking Mazdoor (per day) 409 0.23
(a) Piece rate per 100 Cft 2676 6315
Earth work (including Porok therugu) Mazdoor (per
409 0.23
11 day)
(a) Piece rate per 100 Cft 1555 3670
Laminate Stone (including napa variety etc.) Hand
123 290
12 Polishing Mazdoor (per day)
(a) Piece rate per 100 Cft 725 1711
409 0.23
13 Other Mazdoor not include in any other item (per day)

1 in piece rate wage calculate as=(Present VDA -Linked VDA)/ Linked VDA
2 i.e 1768-525=1243
3 1243/525=236
4 piece rate wage is multiplied with 2.36
STONE BREAKING AND STONE CRUSHING OPERATIONS
Notification issued vide G.O.Ms.No.05, LET&F (Lab.II) Dept., dt:02-02-2008
Published in Gazette No.71, dated 14-02-2008
Wages Linked at 525 CPI points
CPI points notified as on 01.10.2023 = 1768 points
VDA to be paid from 01.10.2023 to 31.03.2024 = 1768 - 525 = 1243 points
Per point rate of VDA notified in the notification = Rs.6.05 & Rs.0.23 per day
Minimum Wages and VDA payable from 01.10.2023 to 31.03.2024

VDA for
Sl.N Basic Total
Name of the Category 1243
o. Wage Wage
points

1 2 3 4 5
1 Schedule-I
1 Accountant/ Cashier 5612.00 7520 13132.00
2 Typist/ Computer Operator 4386.00 7520 11906.00
3 Tally Clerk/ Store Keeper 4048.00 7520 11568.00
4 Peon/ Sweeper 3197.00 7520 10717.00
Minemate / Operator of Machine/ Driver of Motor,
5 191.00 286 477.00
Car, Jeep (per day)
Stone Polisher by Machine/ Helper under operators
6 of Machine or Crusher, fitter Mechanic, Folder or a 167.00 286 453.00
Blacksmith (per day)
7 Mazdoor working at crushing Machine (per day) 129.00 286 415.00
2 Schedule - II
1 Clerk/ Time Keeper 4386.00 7520 11906.00
2 Maistry 4111.00 7520 11631.00
3 Mukaddam (Head Mazdoor)/ Watchman 3197.00 7520 10717.00
Jack Hammer Driller/ Electrician/ Operator of
4 Crusher/ Lorry Driver/ Fitter/ Mechanic /Welder/ 191.00 286 477.00
Blacksmith/ Blaster or Short Loader (Per day)

5 Driller by Head/ Oilman/ Cleaner/ Hammerman/ 167.00 286 453.00


Stone Breaker (Per day)
PIECE RATE
(a) Rubber Granite per 100 sft. 585.00 1381 ---
(b) Rubber hardy variety other than (a) per 100 Cft. 497.00 1173 ---
© Rubber Soft variety Napa variety per 100 Cft 444.00 1048 ---
6 Metal Breaker (Exclusive for breaking metal from 144.00 286 430.00
rubber spplied) (per day)
PIECE RATE
(a) 3 Metal
(i) Granite per 100 Cft 505.00 1192 ---
(ii) Hard per 100 Cft 370.00 873 ---
(iii) Soft Per 100 Cft 298.00 703 ---

VDA for
Sl.N Basic Total
Name of the Category 1208
o. Wage Wage
points

1 2 3 4 5
(b) 1 1/2 Metal
(i) Granite per 100 Cft 653.00 --- ---
(ii) Hard per 100 Cft 523.00 --- ---
(iii) Soft Per 100 Cft 435.00 --- ---
(c ) 1/4 Metal
(i) Granite per 100 Cft 1301.00 --- ---
(ii) Hard per 100 Cft 1079.00 --- ---
(iii) Soft Per 100 Cft 864.00 --- ---
Flooring Slabs cutting (including sizing) Mazdoor 144.00 286 430.00
7 (per day)
PIECE RATE
Cuddapah, Macherla and Bethamcherla etc., Black 222.00 --- ---
(a) variety themselves (per 100 Cft)
Item (a) Variety inclouding by the Mazdoors 401.00 --- ---
(b) themselves (per 100 Cft)
8 Wagon Loading Mazdoor (per day) 144.00 286 430.00
PIECE RATE
(a) Flooring Slab per ton 30.00 --- ---
(b) Stone rubble per ton 28.00 --- ---
(c ) Metal per ton 40.00 --- ---
9 Lorry Loading and Unloading (per day) 144.00 286 430.00
PIECE RATE

40.00 --- ---


(a) Floor Slab (Loading and Unloading both inclusive)
(b) Stone rubble (Loading only ) per ton 28.00 --- ---
(c ) Metal (Loading only) per ton 40.00 --- ---
10 Dind breaking Mazdoor (per day) 123.00 286 409.00
(a) Piece rate per 100 Cft 2676.00 ---
Earth work (including Porok therugu) Mazdoor (per 123.00 286 409.00
11 day)
(a) Piece rate per 100 Cft 1555.00 ---
Laminate Stone (including napa variety etc.) Hand 123.00 286 409.00
12 Polishing Mazdoor (per day)
(a) Piece rate per 100 Cft 725.00 ---
Other Mazdoor not include in any other item (per 123.00 286 409.00
13 day)