0% found this document useful (0 votes)
535 views4 pages

Odisha Works: Government Department

Odisha PAR

Uploaded by

sga.sandeep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
535 views4 pages

Odisha Works: Government Department

Odisha PAR

Uploaded by

sga.sandeep
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

GOVERNMENT OF ODISHA

WORKS DEPARTMENT
x**
OFFICE MEMORANDUM
No. 07559600152022 \qS\
/W Dated ]c'
Sub:- Adoption of an uniform Plinth Area Rate (PAR) while preparing rough
cost

estimates.

Consequent upon Notification of the Schedule of Rates-2022 by Works


dated
Department in office Memorandum No.woRKS-FA-MISC8-0015-6785/W
Rate
20.04.2023, Government have been pleased to adopt an uniform Plinth Area
(PAR)whilepreparingroughcostestimatesofbuildings(bothResidentialandNon.
Residential) as per the enclosed statement. The Plinth Area Rate of building
is

derivedbasingupontheCurrentScheduleofRate-2022,enhancedlabourrate
effective from 01.10.2023, royalty, additional charge, DMF & EMF'

l.ThePlinthAreaRateperSquareMeter(excludingGST)istobeadoptedfor
derivingtheCivilCostofabuildingforpreparationofroughcostestimates.
2.PrevailingGsTonworkproperistobeaddedextratoarrivethetotalproject
' cost..
3. Prbvisional cost of E.I, P.H and Centages as per Government norms are to
be added to arrive at the project cost.
4. The rates are applicable up to floor height of 3.6 mtr and it can be suitably
increased beyond 3.6 mtr of floor height.
5. The enclosed Plint Area Rate ls inclusive of the labour rate as notified by
Govgrnment in Labour & ESI Department'
6. 'The Government Notifications on further modification in this regard needs
to be followed in future.
7. The Plinth Area Rate are effective from the date of issue of this ffice
MemorandumanditwillbeavailableinthewebsiteofWorksDepartment.
This has been concurred in by Finance Department in File No' FIN-WF1-
MISC-0035-2022.

By Ord Governor

(Vir vik ra
Principal overnment
-2-

Memo No S-\- ., Dated-}e-\,-A


Copy forwarded to the Private Secretary to Hon'ble Minister, :;teel & Mines,
Works, Odisha for kind information of Hon'ble Minister, Steel & ^4ines, Works,
Odisha

3/ lztlto>4
FA-cum-Special Secretary to rGovtrnment

Memo No \3 S3 ., Dated St .\, \-\


Copy forwarded to the Sr. Private Secretary to Principal Secretary to
Government, Finance Department for kind information of Principa Secretary to
Government, Finance Department.
-l)larlu. i
FA-cum-Special Secretary to GovelnmAnt

Memo No \1s\ Dated 3"'\ ''l-\


Copy forwarded to All Departments of Government for information and
necessary action,
32
1at lzz z4
FA-cum-Special Secretary to Govemment

I4emo No \a sS ., Dd tPd :o'\,:-9


Copy forwarded to thePrincipal Accountant General (\&E), Odisha,
Bhubaneswar/Principal Accountant General (E&RSA), Odisha, Puri E,'anch, Puri for
information.
'i)latlr-r4
FA-cum-Special Secretary to GoUernrhent

N4emo No
\qst ., Dated ]o \,'r-\
Copy forwarded to All EICs/CEs under the Administrative Ccrrtrol of Works
DepartmenVR.D. Depa rtment/Water Resources Depart ment/PR&DW
Department/H&UD Department for information.

€o4r,rlatlzaz|
FA-cum-Special Secretary to Gdveriment

Memo No
\rS , Dated
B o \.r-\
Copy forwarded to All CCEs/SEs/EEs under the Administrative Control of
Works Depaftment for their information.

)l o,l-r>1
FA-cum-Special Secretary to Governrhent
-3-

M emo No \q s€ ., Dated tso' I' r-\


Copy forwarded to EIC-cum-MD, OB&CC Ltd. for information.

4
FA-cum-S

Memo No-!a51-/W., 3 , r-\


Copy forwarded to the Control Room, Lok Seba Bhawan with a
request to upload it in the website of Works Department.
qq cal t, \ ut+
FA-cum-Special Secretary to Goverrl ment

e F>
0g*
STATEME NT OF PLIN TH AREA RATE
(Plinth Area Rate (in Rs.) per Square l4eter)

Building with RCC frame structure Building with load bearing wall
Sl. No. Floor Status
footing-
Non-Residential Residential Non-Residential Residential

17819.00 16613.00 16162.00 15182.00


1 Single storey
Single storey with double 19433.00 18045.00 17819.00 16162.00
2
storeyed foundation (GF)
Single storey with three 20885.00 19443.00
3
storeyed foundation (GF).
16700.00 15559.00 15182.00 14644.00
4 First Floor
19346.00 18045.00 17808.00 16162.00
5 Second Floor
21821.00 203 s8.00 19346.00 17819.00
6 Third Floor
22661 .00 21133.00
7. Fourth Floor
23898.00 22273.O0
B, Fifth Floor
2s813.00 24081.00
9. Sixth Floor
27890.00 26028.00
10, seventh FIoor

Extra cost to be added towards provision of following items of work in the estimate as shown
hereunder.

Items LJ nit Rate (in Rs.)


Sl. No
Marble stone flooring Per Sqm. 1119.00
1

I'larble stone dado Per Sqm. 1420.00


2

Chequered tile flooring Per Sqm 301.00


3

Kota stone flooring Per Sqm. 861.00


4
Kota stone dado Per Sqm. 1140.00
5.

Granite stone flooring Per Sqm. 2636.00


6
ceramic tile flooring Per Sqm 613.00
7

Glazed tile dado Per Sqm 785.00


B

Vitrified tile flooring Per Sqm 106 5.00


9
Vitrified tile dado Per Sqm 1237 .00
10
Portico Per Sqm. 10706.00
11

Compound wall having brick wall with width 0.25mt but height Per Rmt 16362.00
t2 1.5mt

Compound wall having brick wall with width 0.125mt but height Per Rmt. 9688.00
13 1.5mt
* Sqm. - Square Meter, Rmt. - Running luleter

(Vir Vikr s)
Principal overnment

You might also like