Biomass Pellets Bid for NTPC Plants
Biomass Pellets Bid for NTPC Plants
BIDDING DOCUMENTS
FOR
(This document is meant for the exclusive purpose of bidding against this Bidding Document No. / Specification and shall
not be transferred, reproduced or otherwise used for purposes other than that for which it is specifically issued.)
                                      BIDDING DOCUMENTS
                                                 FOR
   PROCUREMENT OF BIOMASS PELLETS ON FOR POWER STATION BASIS FOR NTPC
                 MOUDA, GADARWARA & KHARGONE POWER PLANTS (LOT-2)
CONTENTS
                                           NTPC Limited
                                  (A Government of India Enterprise)
                                 (CORPORATE CONTRACTS, NOIDA)
                                     INVITATION FOR BIDS (IFB)
                                               FOR
         Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,
                   Gadarwara and Khargone Power Plants (Lot 2)
                                   (Domestic Competitive Bidding)
1.0     NTPC Limited invites on-line bids on Single Stage Two Envelope basis (i.e. Envelope-
        I: Techno-Commercial and Envelope-II: Price) from eligible Bidders for aforesaid
        package, as per the scope of work briefly mentioned hereinafter, for NTPC Mouda,
        Gadarwara and Khargone Power Plants.
         The scope of work under this package shall include supply, loading, transport and
         delivery of agro residue based biomass pellet at NTPC site.
         Unloading shall be in the scope of NTPC at the particular Plant location as mentioned at
         para 1.0 above, provided pellets are loose filled in the carriage vehicle. Carriage vehicle
         should be fully covered and waterproof during transportation to prevent the material from
         rain, sunlight and to prevent dusting.
         If supplier supplies the material packed in bags, consignment shall not be accepted or
         supplier shall unload the material at his own cost. In that case, for any extra halt of
         carriage vehicle, demurrage shall not be payable by NTPC.
         The pellets supplied shall adhered to the technical specification given in tender
         document.
3.0 NTPC intends to finance the aforesaid Package through Domestic Funds.
4.0     Detailed specification, scope of work and terms & conditions are given in the Bidding
        Documents, which are available for examination and sale at the address given below
        and as per the following schedule:
Procurement of Biomass Pellets on FOR Power Station basis for   INVITATION FOR BIDS (IFB)         PAGE
NTPC Mouda, Gadarwara and Khargone Power Plants (Lot 2)
BID DOC. NO CS-0011-112H-9                                                                        1 OF 4
Clause No.                           INVITATION FOR BIDS (IFB)
 5.0    MSE Benefits: Benefits under PPP 2012 for MSEs are applicable only for (a) Goods
       produced and (b) Services provided by MSEs. MSE benefits shall not be
       applicable to Trader/Dealer of Goods. For availing MSE benefits, bidder shall confirm
       that Biomass Pellets, offered / quoted are manufactured by them. For applicability of
       MSE benefits bidder shall refer to the Bidding Documents.
 6.0   All bids must be accompanied by “Bid Security Declaration” in the form as stipulated
       in the Bidding Documents. The Bidder shall furnish, as part of its Bid, “Bid Security
       Declaration” through GTE in online Tendering Portal, GePNIC in lieu of Earnest Money
       Deposit (EMD)/ Bid Security. Bids cannot be submitted without acceptance of aforesaid
       attribute in GTE.
7.0    A complete set of Bidding Documents may be downloaded by any interested Bidder free
       of cost through our GePNIC website (https://eprocurentpc.nic.in). For logging on to the
       GePNIC Site, the bidder would require user id and password which can be obtained by
       registration at GePNIC portal (https://eprocurentpc.nic.in)
 1.0      The APPLICANT should be of minimum 21 years of age (in case of individual
          APPLICANT).
 2.0      The Bidder shall be of Indian nationality AND / OR a Company/ Sole Proprietorships /
          Partnerships / Limited Liability Partnerships / Consortium / Cooperative Societies
          registered in India AND / OR Non-Resident Indians/ Person of Indian Origin AND / OR
          a Multinational Company having its registered office in India / Overseas Corporate
          Bodies having its registered office in India.
  Procurement of Biomass Pellets on FOR Power Station basis for    INVITATION FOR BIDS (IFB)       PAGE
  NTPC Mouda, Gadarwara and Khargone Power Plants                                                  2 OF 4
  BID DOC. NO CS-0011-112H-9
Clause No.                            INVITATION FOR BIDS (IFB)
 3.0   Bidding for the subject package is open to #bidders from within the Employer's country
       only, subject to fulfillment of conditions “Restrictions on procurement from a Bidder
       of a country which shares a land border with India”.
       # In case of Consortium, all the Partners of the consortium shall be from within the
       Employer’s country.
       Bidder shall provide the documents in support of the type of firm/ company they own.
       In case of Individual applicant, Proof of Nationality and age like voter cards, passport,
       Aadhaar etc. may be submitted.
9.0     'Class-I local suppliers’ only are eligible to participate in this tender, as defined in
       the bidding documents/ Public Procurement (Preference to Make in India), Order
       2017 and its subsequent amendments/ revisions issued by DPIIT. The bidders may
       apprise themselves of the relevant provisions of bidding documents in this regard
       before submission of their bids.
10.0    Transfer of Bidding Documents purchased by one intending Bidder to another is not
        permissible.
11.0   Issuance of Bidding Documents to any bidder shall not construe that bidder is considered
       qualified.
12.0   NTPC reserves the right to reject any or all bids or cancel/withdraw the Invitation for Bids
       (IFB) for the subject package without assigning any reason whatsoever and in such case
       no bidder/intending bidder shall have any claim arising out of such action.
        Websites                 :        https://eprocurentpc.nic.in or
                                          www.ntpctender.com or
                                          www.ntpc.co.in
  Procurement of Biomass Pellets on FOR Power Station basis for   INVITATION FOR BIDS (IFB)   PAGE
  NTPC Mouda, Gadarwara and Khargone Power Plants
  BID DOC. NO CS-0011-112H-9                                                                  3 OF 4
Clause No.                           INVITATION FOR BIDS (IFB)
14.0    Registered Office
       NTPC Limited
       NTPC Bhawan, SCOPE Complex,
       7, Institutional Area, Lodi Road,
       New Delhi – 110003
  Procurement of Biomass Pellets on FOR Power Station basis   INVITATION FOR BIDS (IFB)   PAGE
  for NTPC Mouda, Gadarwara and Khargone Power Plants
  BID DOC. NO CS-0011-112H-9                                                              4 OF 4
         VOLUME – II
A. INTRODUCTION
  1.0             NTPC invites online bids on Single Stage Two Envelope bidding basis
                  (Envelope-I: Techno-Commercial Bid & Envelope-II: Price Bid) from eligible
                  bidders for the Package, as per the Scope of Work mentioned hereinafter.
1.1 INTRODUCTION
                  Bidder may quote for any number of NTPC stations. Furthermore, the bidders
                  have to comply with the Qualifying Requirements and Allocation Criteria in
                  accordance to the number of NTPC stations they are intended to
                  quote/participate.
                  Bidders shall submit common Envelope-I (Techno- commercial) Bids for the
                  number of Projects they are interested in participating. Further, Bidders shall
                  submit separate Envelope-II (Price) Bids for such projects separately for
                  Torrefied and Non Torrefied pellets for which Bidder is interested in participating
                  as mentioned above.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              1 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                  iv.      NTPC reserves the right to accept or reject any bid, and to annul the
                           bidding process and reject all bids at any time prior to award of contract,
                           without thereby incurring liability to the affected Bidder or bidders or any
                           obligation to inform the affected Bidder or bidders of the grounds for the
                           Employer’s action. Decision of Employer will be final and binding in this
                           regard.
                  v.       Each Bidder shall submit only one bid either by himself, or as a partner
                           in a joint venture or consortium, if so permitted in the Bidding
                           Documents, each pellet type for a particular project. A Bidder
                           himself, or as a partner in a joint venture or consortium, who submits or
                           participates in more than one bid, each pellet type for a particular
                           project, in this bidding will be disqualified from the bidding.
                          For the purposes of this clause the terms ‘person’ means any individual,
                          company, corporation, partnership (whether limited or unlimited),
                          proprietorship, trust or any other entity (whether incorporated or not),
                          Hindu undivided family, union or association and in case of a trust shall
                          include the trustee or the trustees for the time being.
                          For the purposes of this clause the terms ‘control’ as applied to any
                          person, means the possession, directly or indirectly, of the power to
                          direct or cause the direction of the management or policies of that
                          person whether through acquisition of shares, voting securities, by
                          contract, or otherwise.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              2 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                           participating bidder(s), same pellet type in the same project, then their
                           Bid or Contract (if awarded) shall be rejected/ terminated.
                     3. Bidding for the subject package is open to bidders from within the
                        Employer's country only, subject to fulfilment of conditions “Restrictions
                        on procurement from a Bidder of a country which shares a land border
                        with India”.
                          Bidder shall provide the documents in support of the type of firm/ company
                          they own. In case of Individual applicant, Proof of Nationality and age like
                          voter cards, passport, Aadhaar etc. may be submitted
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              3 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
             II.    Under this methodology, maximum allocation per vendor per station will be
                    limited to 100 TPD and total allocation will be limited to 200 TPD.
             III.   If Bidder wants to bids for more than 100 TPD per station, then allocation shall
                    be limited to actual Turnover (maximum in last five preceding years) of the
                    bidder subject to allocation of maximum 200 TPD per station per vendor and
                    500 TPD per vendor on cumulative basis for all plants. The allocation limit shall
                    apply to torrefied and non-torrefied taken together.
                    Allocation upto 500TPD (cumulative) and 200 TPD per station can be made in
                    case of existing manufacturing capacity
                    In case bidder wants allocation more than their eligibility calculated as per
                    Above criteria at 1.5.1 or 1.5.2, the bidder shall have an option to have Financial
                    tie up/ agreement from financial institutions for setting up manufacturing
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              4 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                    In case of financial tie ups, maximum allocation per vendor per station will be
                    limited to 100 TPD and total allocation will be limited to 200 TPD.
                   This will be applicable only when eligible quantity as per allocation criteria as
                   per 1.5.1 or 1.5.2 is less than 200TPD.
 1.5.4            Allocation Criteria -4
                  In case bidder does not meet any of the criteria given at ITB Clause 1.5.1,
                  ITB Clause 1.5.2 or ITB Clause 1.5.3 for quantity allocation, but is having
                  annual turnover of at least Rs. 1.0 Crore in any of the five preceding financial
                  years, then bids of such bidders will be considered for maximum 20 TPD.
                  If a bidder meets one or more allocation criteria, then allocation of quantity shall
                  be determined as under:
 1.5.6            Bidder shall not be allowed to quote for less than 20 TPD but NTPC can award
                  less than 20 TPD.
 1.5.8            For allocation of quantity, refer ITB clause 27.5 Quantity Allocation and other
                  provision of bidding document.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              5 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
 1.5.9            NTPC may agree for reduction in quantity after L1 price matching if bidder (other
                  than L1 bidder) desires to decrease the quantity as offered during bid.
B. BIDDING DOCUMENTS
                  The items and services required, bidding procedures, order/contract terms and
                  technical requirements are prescribed in the bidding documents.
                                                                                                  PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                                  6 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                  The Bidder is advised to visit and examine the Power Stations where the
                  supplies are to be made and its surroundings and obtain for itself on its own
                  responsibility and cost, all information that may be necessary for preparing
                  the bid and entering into a contract for supply of the biomass pellets. The costs
                  of visiting the Power Stations shall be borne by the Bidder fully.
                  The Bidder and any of its personnel will be granted permission by the
                  Employer to enter upon its premises and lands for the purpose of such
                  inspection, but only upon the express condition that the Bidder, its personnel
                  and agents will release and indemnify the Employer and its personnel from
                  and against all liability in respect thereof and will be responsible for death or
                  personal injury, loss of or damage to property and any other loss, damage,
                  costs and expenses incurred as a result of the inspection.
                  At any time prior to the deadline for submission of bids, the Employer may, for
                  any reason, whether at its own initiative, or in response to a clarification
                  requested by a prospective Bidder, amend the bidding documents.
                  The amendments will be posted at e-tender portal for viewing by the Bidder.
                  The amendments will be binding on Bidders and it will be assumed that the
                  information contained therein will have been taken into account by the Bidder
                  in its bid. Bidders are also advised to regularly check e-tender portal regarding
                  posting of Amendment, if any.
                  The purpose of the Conference will be to clarify any issue regarding the
                  Bidding Documents. The Bidder is requested to submit questions through
                  Seek Clarifications Tab of the tender portal prior to the clarification end date
                  & time and notify through e-mail regarding posting of queries. The Employer’s
                  responses to the queries raised by the bidder in writing will be posted at
                  Clarifications Tab/ through Corrigendum at e-tender portal and Bidders can
                  view these clarifications once they are posted. Bidders are also advised to
                  regularly check e-tender portal regarding posting of clarification etc, if any.
                  Further, any modifications of the Bidding Documents which may become
                  necessary as a result of the Pre-bid Conference shall be made by the
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              7 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
C. PREPARATION OF BID
   3.0            Single Stage Two Envelope Bidding process shall be followed for the
                  subject Package, as under:
   3.1             The Bid shall comprise of Envelope I : Techno-commercial Bid containing the
                   documents listed in ITB 20.1 and Envelope II: Price Bid containing the
                   documents listed in ITB 20.3
   3.2             Bids are to be submitted complete in all respect with requisite information,
                   Certificates, Annexure and BOQ. It shall be free from any ambiguity, cutting or
                   overwriting.
  3.3.1             The Authority of the Person issuing the Power of Attorney shall also be
                    submitted by the bidder
  3.3.3           Bidder shall be required to upload scanned copy of the Power of Attorney of the
                  Bidder, as applicable, along with the Authority of the person issuing the Power
                  of Attorney, along with the bid as per ITB clause no. 20.1.1.
  3.4             For preparation of Bid, Bidder is expected to examine the bidding documents in
                  detail. Material deficiencies in providing the information requested may result in
                  rejection of the bid.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              8 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                  The bid prepared by the Bidder and all correspondence and documents related
                  to the bid exchanged between the Bidder and NTPC shall be written in English
                  language, provided that any printed literature furnished by the Bidder may be
                  written in another language, as long as such literature is accompanied by a
                  translation of its potential passages in English language in which case, for
                  purpose of interpretation of the bid, the translation shall govern.
   6.2             The Bidder has to quote their prices as per the price schedule in Excel sheet
                   format enclosed along with BOQ sheet in the Bidding document.
                   Bidders are required to quote Quantity (MT per Day), GCV (Kcal/Kg), FOR
                   destination Price (Rs/MT) (Without GST) and GST rate (%) in the BOQ. The
                   total quantity for 07 years in MT and Total Landed Cost inclusive of taxes (in
                   INR/MT) will be calculated automatically in the BOQ.
                   Bidders shall be required to quote their prices item-wise for entire quantity as
                   mentioned in the Price schedule/BOQ for all the Projects they are interested
                   to participate identified under this package.
                   Single Price Schedule/BOQ shall be used for biomass pellet type (Torrified/
                   Non Torrefied) for every power plant project and the price schedules of the
                   Projects that Bidder is participating shall be uploaded in Cover type Price bid.
                   The net rate as indicated in the Price Schedule shall be filled up in Basic Price
                   Conditions field of the items (Torrefied/ Non‐Torrefied) specified in BOQ. The total
                   bid price(s) is automatically computed which can be viewed by the Bidder in BOQ.
                   However, award under the package to be made as per the provisions specified under
                   ITB clause 28.
   6.3             Bidder shall undertake that they shall deal directly with NTPC and will not
                   engage any Agent to deal with NTPC.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              9 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
   7.2            The Bidder shall submit the Bid Security declaration (Attachment-1) as per
                  Employers format of bid security declaration included in the Bidding
                  Documents.
   7.3            If Bid Security Declaration form submitted by Bidder (including MSE bidder) is
                  not in acceptable form, then same is to be submitted within 7 days of seeking
                  clarification by NTPC. Thereafter in case of non-submission of Bid Security
                  Declaration form by the Bidder, Bids shall be liable to be rejected by the
                  Employer as being non-responsive.
                  Micro and Small Enterprises (MSEs) as per Ministry of Micro, Small and Medium
                  Enterprises as per MSMED Act 2006, for goods produced and services
                  rendered, shall be issued the bid documents free of cost and shall be exempted
                  from paying Earnest Money Deposit/ Bid Security.
                  For each station, participating MSEs quoting price within price band of L1 + 15
                  percent shall also be allowed to supply a portion of requirement by bringing
                  down their price to L1 price in a situation where L1 price is from someone other
                  than a Micro and Small Enterprise and such Micro and Small Enterprise shall be
                  allowed to supply up to 25 percent of total tendered value for each station. In
                  case of more than one such MSE, the supply will be shared proportionately (to
                  tendered quantity).
                  The benefit as above to MSEs shall be available only for Goods/Services
                  produced & provided by MSEs.
                  As per answer to FAQ no. 18 circulated vide Office Memorandum F.
                  No.22(1)/2012-MA dated 24.10.2016 “Policy is meant for procurement of goods
                  produced and services rendered by MSEs. However, traders are excluded from
                  the purview of Public Procurement Policy.”
                  MSEs seeking exemption and benefits should enclose a attested/self-certified
                  copy of registration certificate as a part of his bid, giving details such as
                  stores/services, validity (if applicable) etc. failing which they run the risk of their
                  bid being passed over as ineligible for the benefits applicable to MSEs
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              10 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                      For availing MSE benefits, bidder shall confirm that biomass pellets offered
                      and quoted is produced by them.
                      Further, the benefit of purchase preference will be available only when Bidder
                      is a manufacturer of biomass pellets and in case of non- manufacturing of
                      pellets by bidders, its bid shall be evaluated/treated as Non-MSE bid,
                      provided bidder has furnished Bid Security Declaration form as per ITB
                      clause 7.0.
                      The Purchase Preference shall be extended to MSE Bidders based on
                      UDYAM REGISTRATION CERTIFICATE submitted by them supported by
                      Certificate from Chartered Accountant specifying that Bidder has set-up
                      manufacturing plant for pellets and providing details like manufacturing
                      capacity of Plant for Biomass Pellet Manufacturing etc, along with the
                      Undertaking (Attachment-9) in support of the claim that such item(s) are
                      manufactured by the Bidder. The format to be furnished by the Bidder after
                      due certification from practicing chartered Accountant is attached at
                      Attachment-7B. In case, Chartered Accountant Certificate is not submitted
                      along with Bid and only valid MSE Certificate and Bid Security Declaration
                      Form is submitted by the Bidder, then Bidder shall be given an opportunity
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              11 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                    Purchase preference to eligible MSE will be given only for the item{s} quoted
                    by the bidder for which bidder is a manufacturer. If the MSE Bidder has only
                    submitted UDYAM REGISTRATION CERTIFICATE and if it is found at any
                    stage that none of the items offered/quoted by the MSE bidders / are
                    manufactured by them, their bid shall be treated as Non-MSE bid.
                   However, in case the MSE Bidder is manufacturing any / some of the quoted
                   item(s) then Purchase Preference benefits for MSEs shall be extended for
                   such item(s) being manufactured by them. For balance items, its bid shall be
                   evaluated as “Non MSE" bidder.
8.2 Preference to Make In India and granting of purchase preference to local suppliers
   8.2.1          Only Class‐I local suppliers are eligible to bid. Bids received from bidders other than
                  'Class‐I Local supplier shall be out rightly rejected.
   8.2.2          Preference to Make in India and Eligibility for Participation of “Class-I local
                  suppliers” as mentioned in Annexure-I to ITB shall be applicable.
                  Further, Bidder shall be required to submit a certificate from the statutory auditor
                  or cost auditor (in the case the bidder is a company) or from a practicing cost
                  accountant or practicing chartered accountant (in respect of bidders other than
                  companies) giving the percentage of local content during execution prior to
                  submission of last bill for payment.
                  False declarations will be dealt in line with the Fraud Prevention Policy and
                  Policy & Procedure for Withholding and Banning of Business Dealings of
                  NTPC.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              12 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
   8.2.3          For purchase preference, MSE guidelines mentioned above in 8.1 read in
                  conjunction with “Preference to Make in India and granting of purchase
                  preference to local suppliers” mentioned in Annexure-I to ITB, shall be
                  applicable
   9.2            Bidders shall certify their full compliance to all the provisions of Bidding
                  Documents and its subsequent Corrigendum(s)/ Amendment(s) /
                  Clarification(s) / Addenda / Errata, if any, issued by the Employer, by accepting
                  the following at General Technical Evaluation at NTPC e-tender portal
                  https://eprocurentpc.nic.in:
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              13 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
   9.4            Bidders shall certify their compliance to ITB Clause “Preference to Make in India
                  and eligibility for participation” by accepting the following at General Technical
                  Evaluation at NTPC e-tender portal https://eprocurentpc.nic.in:
                  “Do you certify full compliance on ITB Clause “Preference to Make in India
                  and eligibility for participation”?”
   10.1           The bidder is to ensure that its bid initially shall remain valid and open for acceptance
                  for one hundred & eighty (180) days from the date of opening of Techno‐Commercial
                  Bid. The bid valid for shorter period shall be rejected by the employer as being non‐
                  responsive.
                                                                                                PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                               14 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                  extension of the bid validity period. The request and responses thereto shall be
                  made in writing by post, or e-mail. A Bidder may grant or refuse the request. A
                  Bidder granting the request will not be required nor permitted to modify its bid.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              15 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
   16.1            For quoting the Bid Prices, the Bidder are expected to take into account the
                   requirements and conditions of the bidding documents. The Bid Prices shall be
                   quoted in price schedule in Excel sheet format, which shall be updated
                   indicating the exchange rate, as detailed herein, in accordance with provisions
                   of the Bidding documents.
                    The Bidder has to quote the total F.O.R. NTPC Station Basis Price including
                    all taxes and duties except GST on FOR Price for the Package in Indian
                    Rupees. The Bidder has to quote the total F.O.R. NTPC Station Basis Price
                    including all taxes and duties except GST in Indian Rupees. The Bidder is
                    required to quote GST separately in the BOQ sheet The detailed calculations
                    are as shown in Excel Sheet of the Price Schedule.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              16 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
   16.2            The prices are to be quoted by the as per the format provided in the bidding
                   documents. The quoted prices are to remain valid during the entire currency of the
                   Contract, till the complete execution.
                  Bidders to note that Awards under the package to be made would be as per
                  provisions specified under ITB Clause 28. The quoted unit rates of bidders
                  under the various components in price schedule in Excel sheet format are to
                  remain valid irrespective of the quantities considered for award to the bidder by
                  the Employer, as per award criteria specified elsewhere in the Bidding
                  Documents.
   16.3            All charges for the entire scope of work should be included in the quoted price
                   and the same should be for entire execution of the contract, in line with the
                   Technical Specifications including Scope of Work and bidding documents
                   provisions.
                  Bidders are required to quote the price for the commercial, contractual and
                  technical obligations outlined in the bidding documents.
   16.4            The terms EXW, FOB, C&F, CIF, FOR etc., shall be governed by the rules
                   prescribed in the current edition of Incoterms, published by the International
                   Chamber of Commerce, 38 Cours Albert 1er, 75008 Paris, France.
   16.5            Under GST regime, if input tax credit (ITC) benefits is available to the bidder,
                   Bidder to quote their Price bids taking the same into consideration. NTPC shall
                   not be in any way, responsible for the same.
   16.6            In the event of any corrections in the Bid, the same should be authenticated by
                   signature of the authorized signatory signing the Bid.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              17 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                  The bid including all documents attached/uploaded on the e-tender portal shall
                  be digitally certified using Class-III signature by a duly authorised representative
                  of the Bidder to bind him to the contract. The authorization shall be indicated by
                  written power of attorney as per ITB Clause 3.3 and shall be submitted prior to
                  date & time for opening of Techno-Commercial bid as per ITB clause 20.
D. Submission of Bid
   19.1            Bidders shall submit their Bids [Common Envelope‐I (Techno‐ Commercial) Bid and
                   separate Envelope‐II (Price) Bids] as per the Terms and Conditions of the Common
                   Bidding Document no CS‐0011‐112H‐9.
   19.2            Bidder can submit their Common Envelope‐I (Techno‐Commercial) Bids for any
                   number of the projects mentioned at clause 1.0 of ITB
   19.3            As per evaluation and award criteria stipulated herewith Bidders shall submit the
                   Bid Security Declaration as specified in Clause 7.0 of ITB
                   As brought out at clause 1.0 of ITB, Single Stage Two Envelope Bidding process is
                   being followed for Biomass Pellet Procurement. Accordingly, Bidders shall submit
                   common Envelope‐I (Techno‐ commercial) Bids for the number of Projects they are
                   interested in participating. Further, Bidders shall submit separate Envelope‐II (Price)
                   Bids for such Projects for which Bidder is interested in participating .
   19.4           Price bids submitted by the Bidder shall be opened and evaluated separately
                  for each Project in the sequence the Projects are listed at clause 20.3 of ITB.
B. BIDDING DOCUMENTS
                   The Bid (comprising the Bid Forms as per Section-V, together with its
                  Attachments (Techno-commercial and price) and Price Schedules) shall be
                  submitted simultaneously at the e-tender portal through e-tender mode in the
                  manner specified elsewhere in bidding document. No Manual/ Physical Copy of
                  the Bid shall be acceptable
                     Bidders are required to submit common Techno-Commercial Bid for all the
                     Projects (one or more) for which Bidder is interested with respect to the
                     IFB/Tender No.
                                                                                               PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              18 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                   Bid security declaration form shall be furnished in accordance with ITB Clause
                   7.0.
                   In accordance with ITB Clause 3.3, Bidder shall be required to upload scanned
                   copy of the Power of Attorney of the Bidder along with the Authority of the
                   person issuing the Power of Attorney
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              19 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                   Attachment 7A: Bidder’s turnover data for last 5 financial years as per
                    Employer’s format along with supporting documents
                     Any other document, bidder feels is important to establish the allocation and
                     fulfill the tender requirements.
                     While submitting online Bid All Bidders are required to certify their compliance
                    to the complete Bidding Documents by accepting the following attributes in
                    GTE at NTPC GePNIC E-tender site:
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              20 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                  7. “Confirm that you are a LOCAL SUPPLIER, and the LOCAL CONTENT
                     included in SCOPE OF SUPPLY FOR ALL QUOTED ITEMS (Item-wise
                     Evaluation) OR COMPLETE SCOPE OF SUPPLY (Package-wise
                     Evaluation) meets the MINIMUM LOCAL CONTENT requirements of the
                     Tender”.
                  Note: The Techno-Commercial Bid should not contain any price content
                  entry. In case, the Techno-Commercial Bid is found to contain any price
                  content, such bid shall be liable for rejection.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              21 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
NOTE:
                  1.0 Price Bids for Torrefied pellets and Non torrefied pellets shall be opened
                      separately in project wise sequence as mentioned above. Further,
                      opening of price bids for Torrefied pellets shall be followed by Non-
                      Torrefied pellets in accordance with the provisions of the bidding
                      documents
                  2.0    Price bids submitted by the Bidder shall be opened simultaneously and
                        shall be evaluated separately for each station, in accordance with the
                        provisions of the bidding documents
20.3.1 Documents to be uploaded in Price Bid form cover of Price Bid of etender
                  Note: Document(s) uploaded other than Unconditional Price Bid Form in Price
                  bid form cover of price bid shall not be given any cognizance.
 20.3.3           Price schedule be submitted by bidder online on the e-tender portal in the
                  Finance Cover as mentioned below
                  Price Schedule: Bidders shall be required to quote their prices biomass pellet
                  type –wise (torrefied/ non torrefied) for all the Projects they are interested to
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              22 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                  Bidders may note that Price Bid Form and price schedule should not be
                  uploaded in Pre-Qual/Technical Cover/Envelope
                  Further, Price Bid should not contain any matter in respect of Technical and / or
                  Commercial aspects other than the details specifically sought in the Price Bid.
                  If the Technical/commercial matters indicated in Price Bid form are found to be
                  in contradiction with the details furnished in Techno-Commercial Bid, the details
                  furnished in Techno-Commercial Bid shall prevail.
 21.1              Bids (Techno‐commercial bid and price bid) shall be submitted in compliance to the
                  provisions of the bidding documents no later than the time and date specified in the
                  bidding documents/ any subsequent communication from the employer.
                  In the event of the specified date for submission of bids being declared a holiday
                  for the Employer, the bids will be received up to the appointed time on the next
                  working day.
 21.2             The Employer may, at its discretion, extend this deadline for submission of bids by
                  amending the bidding documents in accordance with ITB Sub‐Clause 2.2 in which case
                  all rights and obligations of Employer and Bidders will thereafter be subject to the
                  deadline as extended.
                  Date & Time for opening of Price Bid shall be intimated separately to the bidders
                  whose techno‐commercial bid is found to be acceptable as detailed in ITB clause 23.2.
 22.1             The Bidder may modify or withdraw its bid after submission prior to the deadline
                  prescribed for bid submission. In case of withdrawal a letter giving the reason
                  for withdrawal is to be uploaded. Once a bid is withdrawn, the bid cannot be re‐
                  submitted.
 22.2             No bid may be withdrawn in the interval between the bid submission deadline
                  and the expiration of the bid validity period specified in ITB Clause 10.0
                  Withdrawal of a bid during this interval may result in bidder being ineligible for
                  participation in the future tenders issued from NTPC for a period of 06 months
                  from the date of withdrawal of the bid.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              23 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
 23.1.1            The Employer will first open Techno-Commercial Bid, on the date online at IFB
                   / any subsequent communication from the employer. Bidder’s attendance during the
                   Techno‐Commercial Bid opening in NTPC premises is not envisaged. In the event of
                   the specified date for the opening of bids being declared a holiday for
                   EMPLOYER, the bids will be opened at the appointed time on the next working
                   day.
 23.1.2            The Price Bid will remain unopened and the date and time for opening of price
                   bids shall be intimated separately by EMPLOYER after completion of
                   evaluation of Techno-Commercial Bids.
 23.1.3            Only those bidders who are eligible by fulfilling the laid down criteria of the relevant
                   stage of the bid will be able to check bid opening status through e‐tendering portal.
 23.2.2            Price Bid for torrefied pellets and non-torrefied pellets shall be opened
                   separately in project wise sequence as specified at clause 20.3 of ITB above.
                   Further, opening of price bids for torrefied pellets shall be followed by non-
                   torrefied pellets. After the evaluation process of Techno-Commercial bid is
                   completed, Employer will inform in writing the eligible Bidders regarding date
                   and time set for the opening of Price Bid for each project .
 23.2.3            Price bids of those Bidders, who have been considered qualified and whose
                   Techno-Commercial Bid is found to be responsive, will be opened online.
                   Bidder’s attendance during the Price Bid opening in NTPC premises is not envisaged.
 23.2.4            The participating bidders will be able to view the bid prices of all the bidders after
                   online opening of Price Bids by Employer
 24.1             During bid evaluation, EMPLOYER may, at its discretion, ask the Bidder for a
                  clarification of its bid including documentary evidence pertaining to the details
                  mentioned in the bid for the purpose of meeting Qualifying Requirement and
                  Allocation Criteria as specified in bidding documents. The request for
                  clarification and the response shall be in writing only No post bid clarification at
                                                                                                PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                               24 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                  the initiative of the bidder shall be entertained as all such clarifications would have
                  been obtained prior to the submission of the bid.
 25.1             Employer will examine the Bids to determine whether the same are complete,
                  whether required documents have been furnished, whether the documents have been
                  properly signed and whether the Bids are generally in order.
 25.2             For the bidders who have been technically qualified in earlier supply of biomass
                  pellets tender of NTPC for 7 years period (CS-0011-112F-9 and future tender
                  ), in case clarification is sought from the bidders and no suitable reply is
                  received then the sought information as received in the earlier biomass tenders
                  would be taken in consideration for evaluation of their bids submitted against
                  this tender.
 25.3             The Employer may waive any minor informality, nonconformity, or irregularity in
                  a bid that does not constitute a material deviation, provided such waiver does
                  not prejudice or affect the relative ranking of any Bidder.
 25.4             Prior to the detailed evaluation, NTPC will determine whether each bid is of
                  acceptable quality, is complete, and is substantially responsive to the Bidding
                  Documents. For purposes of this determination, a substantially responsive bid
                  is one that (a) materially conforms to all the terms, conditions and specifications
                  of the bidding documents without material deviations, objections,
                  conditionalities or reservations. A material deviation, exception, objection,
                  conditionality, or reservation is one: (i) that affects in any substantial way the
                  scope, quality, or performance of the contract; (ii) that limits, in any substantial
                  way that is inconsistent with the Bidding Documents, the Employer’s rights or
                  the Successful bidder’s obligations under the Contract; or (iii) whose
                  rectification would unfairly affect the competitive position of other Bidders who
                  have submitted substantially responsive bids.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              25 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                  NTPC reserves the right to verify any claims made by vendors and to carry out
                  a capability assessment. The decision of NTPC shall be final in this regard.
                  Notwithstanding any stated above, NTPC reserves the right to undertake a
                  physical assessment of the capacity and capabilities including financial capacity
                  and capability of the Bidder to perform the Contract, should the circumstances
                  warrant such as assessment in the overall interest of NTPC.
                  Bids not meeting the requirements as stated in the Bidding Documents/NIT shall
                  be rejected. An affirmative determination of meeting the qualifying requirements
                  and allocation criteria will be a prerequisite for further evaluation of Techno-
                  Commercial bid. A negative determination will result in rejection of the Bidder’s
                  Techno-Commercial Bid in which event EMPLOYER will not open the Price Bid
                  of the concerned bidder and
 26.1             Employer will carry out a detailed evaluation of the Techno-Commercial Bids,
                  previously determined to be responsive, in order to ascertain that the bidder
                  fully meets Qualifying Requirements (ITB Clause 1.4) and Allocation Criteria,
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              26 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                  (ITB clause 1.5) and other provisions of bidding document, thereby eligible for
                  quantity allocation as mentioned under ITB clause 27.5 and other provisions of
                  bidding documents
                   ii) Any other relevant factors listed in the General Purchase Conditions, and
                  Instruction to Bidders, or that EMPLOYER deems necessary or prudent to take
                  into consideration.
                  During the course of Detailed technical evaluation, owner shall examine the
                  bids to determine whether they are complete, whether document have been
                  properly submitted and whether bids are generally in order. Material
                  deficiencies in the bid may render the bid as non-responsive and lead to
                  rejection of the bid.
                  Bidder may note that deviations, variations and additional conditions etc. found
                  anywhere in the bid, shall not be given effect to in evaluation and it will be
                  assumed that the Bidder complies to all the conditions of Bidding Documents
                  and its subsequent Amendment(s) / Clarification(s) / Addenda / Errata, if any,
                  issued by the Employer. In case the Bidder refuses to withdraw deviations
                  implicit or explicit found anywhere in the bid, without any financial implication
                  whatsoever to the Employer, the bid shall be rejected.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              27 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                  Price Bid, prepared and submitted comprising details / documents in line with
                  ITB Sub-Clause 20.3, by Bidders found eligible after evaluation of Techno-
                  Commercial Bids, submitted in accordance with ITB will be evaluated as
                  described hereinafter:
  27.1             The Employer will examine the Price bids to determine whether they are complete,
                   whether any computational errors have been made, and whether the bids are
                   generally in order.
  27.2             The evaluation shall be based on the evaluated cost of completing the contract in
                   compliance with all commercial, contractual and technical obligations under this
                   Bidding Documents. The Bids shall be evaluated for arriving at total FOR NTPC Station
                   basis price as computed in the price schedule.
  27.4             The Evaluated Bid Price shall be arrived at considering the Plant-wise quoted
                   FOR NTPC Station basis prices at respective Plant, within the Package, Plant-
                   wise indicated quantities for the plants, as further detailed at technical
                   specifications. However, the Quantity Allocation ( ie actual quantity to be
                   supplied) may vary as per the provisions of the bid documents.
 27.5.1           The evaluation shall be done on Item-wise basis and Quantity allocation shall
                  be done as per methodology given at Annexure- Alloc-A for placement of order
                  shall be followed for each Plant as per list mentioned at ITB clause 1.0 above.
                  If a bidder meets one or more allocation criteria, then allocation of quantity shall
                  be determined as per para 1.5.5 above.
 27.5.3           Further, allocation limit of 200TPD or 500TPD (as the case may be) shall be
                  applicable for cumulative orders across all NTPC plants, i.e., including orders
                  against the current Tender as well as earlier tender (CS-0011-112F-9 and future
                  tender)
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              28 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                Note : Short term orders# placed on Vendors shall not be considered for
                 restriction of orders for an item for this tender.
 27.5.5           Accordingly, in case a bidder comes out as successful bidder for cumulative
                  orders of 200 TPD/500 TPD in this tender inclusive of earlier tender (CS-0011-
                  112F-9)for torrefied, non torrefied or combination of both torrefied or non
                  torrefied pellets after Price Bid opening in the order mentioned at clause 20.3
                  of ITB above, their Price Bid shall not be opened for remaining Plants
 27.5.6           The evaluation of price bids shall be done on the basis of net rate basis which shall be
                  calculated as below:
                    Net Rate (in Rs/1000 Kcal) = Landed Cost of pellets*(Rs/MT) /offered GCV
                                                                                  (Kcal/Kg)
                    Bidder having lowest derived net rate (Rs/1000 Kcal) shall be considered L1
                  bidder
 27.5.7           Quantity allocation may be less than the prescribed limit as above based on discretion
                  of NTPC.
 27.5.8           A bidder can bid for the quantity only in multiple of 10 TPD and can offer to supply a
                  minimum 20 TPD of each pellet type (Torrefied/ Non‐ Torrefied) at one plant location.
 27.5.9           Maximum quantity to be offered by a Bidder for an item at one project shall be limited
                  to 100/200 TPD as the case may be.
 27.5.10          Bidder shall quote FOR destination price alongwith applicable taxes and duties.
                  The price break-up of FOR destination price and applicable GST shall be
                  furnished in the Price schedule of the respective Plant.
                  For the purpose of Evaluation, GST quoted in the Bid shall only be considered.
                  However, NTPC shall pay or reimburse GST at actuals or quoted, whichever is
                  lower.
                  In case a Bidder has quoted GST rate as ‘0’ (Zero), the quoted price shall be
                   considered to be inclusive of applicable GST.
 27.5.11          Total quantity allocation to a bidder shall be = Daily Quantity allocated to bidder× 7×
                  365
                                                                                               PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              29 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
 27.5.12          TPD stands for “Tonnes Per Day”. Tonnes and Metric Ton (MT) have the same
                  meaning.
F. Award of Contract
                  Subject to ITB Clause 32 (Employer’s Right to Accept any Bid and to Reject
                  any or all bids), Allocation criteria and other provisions of bidding documents,
                  the Employer will award the Contract to the Bidder (whose bid has been
                  determined to be substantially responsive to the Bidding Documents and
                  provided that such bidder has been determined to be qualified to perform the
                  contract satisfactorily
                  The Bidder will be required to comply with all requirements of the Bidding
                  Documents without any extra cost to the Employer.
 29.1             Prior to the expiration of the period of bid validity, the Employer will notify the
                  Successful bidder in writing by registered letter or by telefax or by email, to be
                  confirmed in writing by registered letter, that its bid has been accepted. The
                  Letter of Intention (LOI) / Letter of Award (LOA) as applicable as per bidding
                  documents will constitute the formation of the contract and shall be effective
                  from the date of award.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              30 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                  - The Fixed portion of the FOR destination Component of the Contract Price (F)
                  shall be 0.15.
                  - a, b and c shall be co-efficient of High Speed Diesel Oil (HSD), WPI(Electricity)
                  & WPI (Food Articles) in the FOR destination Component of the Contract Price.
                  The co-efficients of HSD, Electricity and WPI (Food Articles) shall be 0.20, 0.20
                  and 0.20 respectively.
                  - 'Lb" shall be co-efficient for labour component in the FOR destination
                  Component of the Contract Price which shall be 0.25.
                  A= High Speed Diesel Oil price, namely price of High Speed Diesel Oil, at Pump
                  Station of India Oil Corporation nearest to the project site. (selling price inclusive
                  of taxes and duties as per litre of H.S.D. Oil) on last day of each month.
                    L= Indian field labour index Namely, All India Consumer Price Index for
                    Industrial Workers (All India Monthly Average) as published by Labour
                    Bureau, Shimla,Government of India.
                    Subscript '1' refers to indices as of: For Diesel (A), Electricity (B), Food
                    Articles (C) and Labour (L)- on last day of previous month of receipt of
                    shipment.
                    The above price adjustment shall be applicable for quantities supplied as per
                    allocation done including excess supply permitted in the contract. In case of
                    shortfall in annual supply, price adjustment for spill-over quantity of earlier
                    year shall be paid at average indices for last 12 months in which the spill
                    over quantity was due for supply, if spill-over occurs due to reason attributed
                    to the vendor.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              31 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                    Example
                    If Allocation is 20 TPD, then annual allocation for say (Feb 2022 to Jan 2023)
                    is 20X 365 =7300 Tons, (say award date is Feb 2022)
                    If supply completed till Jan 2023 is 5000 Tons, then for spill over quantity i.e.,
                    7300-5000=2300 Tons, price adjustment shall be paid based on average
                    indices of last 12 months i.e. Feb 2022 to Jan 2023.
                    Note: Price Adjustment shall be calculated on Monthly basis for all the
                    shipment/consignment received in a month.
G. Other Instructions
                  Subject to ITB clause 2.1, no Bidder shall contact the Employer on any matter
                  relating to its bid, from the time of the opening of bids to the time the Contract
                  is awarded.
32.0 Employer’s Right To Accept Any Bid And To Reject Any Or All Bids
                  The Employer reserves the right to accept or reject any Bid, and to annul the
                  bidding process and reject all Bids at any time prior to Contract award, without
                  thereby incurring any liability to the affected Bidder or Bidders or any obligation
                  to inform the affected Bidder(s) of the grounds for the Employer’s action.
                  The Successful bidder(s) shall perform the work and carry out their obligations
                  as per Scope of Work and terms and conditions defined in the Bid Document
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              32 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                  The physical assessment shall include but not be limited to the assessment of
                  the office/facilities/reference work by the Employer. A negative determination of
                  such assessment of capacity and capabilities may result in the rejection of Bid.
                  The above right to undertake the physical assessment shall be applicable for
                  the qualifying requirements stipulated in the bidding document
                  NTPC has in place an Integrity Pact details of which are displayed on its
                  Tender website https://ntpctender.ntpc.co.in
                  Bidders are required to unconditionally accept the “Integrity Pact (IP)” as per
                  Annexure- F10 To Volume-V, to the Bidding Documents. Acceptance of the
                  Integrity Pact (IP) is to be given on-line by accepting the following attribute in
                  General Technical Evaluation at NTPC e-tender portal:
                  “Do you Commit to all the provisions of the Integrity Pact?”
                  On Bidder’s acceptance to the above attribute, Bidder / JV Partner(s)/
                  Consortium members confirm to have read, understood and unconditionally
                  accept & commit to all the contents, terms, conditions and undertakings
                  mentioned in the Integrity Pact which has been pre-signed by the Employer and
                  enclosed with the Bidding Documents. On Acceptance of the above attribute,
                  Integrity Pact shall be considered signed by the Bidder / JV Partner(s)/
                  Consortium members and the same shall come into force from the date of
                  submission of bid.
                  It may also be noted that subsequent to Employer’s evaluation of Bids,
                  resulting into award of Contract to a particular Bidder, the Integrity Pact
                  acceptance through attribute in GTE so submitted shall form an integral
                  part of the Contract.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              33 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                  The Employer requires that Bidders observe the highest standard of ethics
                  during the procurement and execution of such contracts. In pursuance of this
                  policy, the Employer:
                  (a)      defines, for the purposes of this provision, the terms set forth below as
                           follows :
                           (i)      "corrupt practice" means the offering, giving, receiving or
                                    soliciting of any thing of value to influence the action of a public
                                    official in the procurement process or in contract execution; and
                           (ii)     "fraudulent practice" means a misrepresentation of facts in order
                                    to influence a procurement process or the execution of a contract
                                    to the detriment of the Employer, and includes collusive practice
                                    among Bidders (prior to or after bid submission) designed to
                                    establish bid prices at artificial non-competitive levels and to
                                    deprive the Employer of the benefits of free and open
                                    competition;
                  (b)      will reject a proposal for award if it determines that the Bidder
                           recommended for award has engaged in corrupt or fraudulent practices
                           in competing for the contract in question;
                  (c)      will declare a firm ineligible, either indefinitely or for a stated period of
                           time, to be awarded a contract if it at any time determines that the firm
                           has engaged in corrupt or fraudulent practices in competing for, or in
                           executing, a contract of the Employer.
 38.0             INDEPENDENT EXTERNAL MONITORS (IEMS):
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              34 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                  The Employer has in place a Policy for withholding and Banning of Business
                  Dealings as enclosed at General Purchase Conditions (GPC) of the Bidding
                  documents. Business dealings may be withheld or banned with the
                  Bidder/Contractor on account of any of the grounds and following the
                  procedures as detailed in the said Policy for withholding and Banning of
                  Business Dealings.”
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              35 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                  Such registration should be valid for the entire period of bid validity or any
                  extension thereof. However, in case the validity period of registration is less
                  than bid validity period, the Bidder shall be required to submit the extension of
                  the validity period of registration before the opening of price bids, failing which
                  the bid shall be rejected.
  40.2             “Bidder” (including the term 'tenderer', 'consultant' or 'service provider' in certain
                  contexts) means any person or firm or company, every artificial juridical person not
                  falling in any of the descriptions of bidders stated hereinbefore, including any agency,
                  branch or office controlled by such person, participating in a procurement process.
  40.4             “Bidders from a country which shares a land border with India” / “Sub‐contractor
                  from a country which shares a land border with India” as mentioned in ITB clause
                  40.1 above means;
  40.5            The beneficial employer for the purpose of ITB clause “40.4” above will be as
                  under;
                                                                                               PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              36 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                  Explanation-
                     i. “Controlling employership interest” means employership of or
                          entitlement to more than twenty-five per cent of shares or capital or
                          profits of the company;
                      ii.   “Control” shall include the right to appoint majority of the directors or to
                             control the management or policy decisions including by virtue of their
                             shareholdings or management rights or shareholders agreements or
                             voting agreements;
                      d) Where no natural person is identified under (a) or (b) or (c) above, the
                            beneficial employer is the relevant natural person who holds the position
                            of senior managing officials;
                  b) The Company product should have been tested and cleared from a Govt
                     approved third party laboratory as per applicable standards (IS/IEC etc).
                  c) The factory set up shall be inspected by NTPC, for checking the suitability
                     for taking up manufacturing of the product by start-up, before declaring it
                     qualified.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              37 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
  42.1            Free unloading time: 24 hrs from the date and time of placement of truck within
                  NTPC stations during the normal working hours excluding holidays. Supplier to
                  provide authorized representative to acknowledge delivery (including shortage,
                  damage, deterioration) of consignment at the site. Detention charge would be
                  payable if the unloading time exceeds beyond the stipulated time (i.e. 24hrs),
                  and the delay being on account of NTPC.
  42.2            Detention charges (beyond free unloading time) per day would be as follows:-
                  a) Mini Truck: Rs.900/- b) Truck: Rs.1700/- However, all intervening holidays
                  and Sundays will be excluded from detention period calculation.
  43.1            For all the cases where payment documents are to be directly submitted to
                  NTPC (excluding Payment through Bank cases), the Invoice and supporting
                  document(s) as required in the Purchase Order have to be Digitally Signed with
                  class II or III digital signature and uploaded in the NTPC Vendor Payment Portal
                  https://pradip.ntpc.co.in/VendorFinal/Login.jsp.
  43.2            From 15.5.2020, NTPC will accept only digitally signed Invoice & supporting
                  documents from Vendors for direct payment cases. Submission of documents
                  in physical form shall not be accepted by NTPC unless otherwise asked for in
                  the PO.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              38 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
CLAUSE NO.
                                           INSTRUCTIONS TO BIDDERS (ITB)
                  For such cases of physical submission, Vendors are required to send complete
                  set of documents including invoice etc. addressed to the "Invoice Receipt
                  Center" of the Delivery/ Invoicing Address as mentioned in the Purchase Order
                  Annexure 1/ BOQ Sheet.
                  While submitting the Invoice/ Bills & related documents in physical form,
                  Vendors are required to mention the following details on the top of the envelope:
  43.4            For payment cases through bank, all original documents are to be submitted in bank
                  as per terms of PO.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda,   VOLUME-II (ITB)
                                                                                              39 of 39
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H-9
                                                                           Annexure-I to ITB
It is the policy of the Government of India to encourage 'Make in India' and promote
manufacturing and production of Goods and Services in India with a view to enhancing
income and employment. In this regard, the following guidelines, concerning the
procedure to be adopted for granting purchase preference to local suppliers, are hereby
issued:
1.0   Definitions:
 a)   'Local content' means the amount of value added in India which shall be the
      total value of the goods and services procured (excluding net domestic indirect
      taxes) minus the value of imported content in the goods and services (including
      all customs duties) as a proportion of the total value, in percent.
 b)   'Local supplier' means a supplier or service provider whose product or service
      offered for procurement meets the minimum local content as prescribed.
 c)   'L1' means the lowest tender or lowest bid or the lowest quotation received in a
      tender, bidding process or other procurement solicitation as adjudged in the
      evaluation process as per the tender or other procurement solicitation.
 d)   'Margin of purchase preference' means the maximum extent to which the
      evaluated bid price of a local supplier may be above the L1 for the purpose of
      purchase preference.
 e)   Fraud Prevention Policy – shall mean the policy related to prevention of fraud
      displayed on NTPC tender website http://www.ntpctender.com.
 f)   Policy & Procedure for Withholding & Banning of Business Dealings –
      shall mean the policy related to Withholding & Banning of Business Dealings
      forming part of Bidding Document.
2.0     Minimum local content
                                      Page 1 of 3
      (ii) If L1 bid is from an MSE who is also a local supplier, the contract will be
           awarded to L1.
            (iv) For the purpose of matching of lowest evaluated bid (L1) price, the Class-
                 I local supplier / MSEs would have to necessarily reduce all components
                 of the quoted price on pro-rata basis. The reduction should not apply on
                 the evaluation loading on account of functional guarantees and other
                 loadings (if any, which are not dependent on quoted price). Further, the
                 Contract shall be awarded on such revised/ reduced quoted price. The
                 summation of the revised/ reduced quoted price and the evaluation
                 loading on account of functional guarantees and other loadings (if any)
                 shall be equal to the lowest evaluated bid (L1) price.
Notes:
      (i)      In the present case, the aforesaid procedure shall be followed for each
               NTPC Station separately.
5.1   The local supplier shall be required to provide, self-certification / declaration that
      the Item offered meets the minimum local content and shall give details of the
      location(s) at which the local value addition is made as part of the bid submission
      form.
5.2   In cases of procurement for the value in excess of INR 10 crore, the local supplier
      shall be required to provide a certificate from the statutory auditor or cost auditor
      of the company (in the case of companies) or from a practicing cost accountant
                                         Page 2 of 3
      or practicing chartered accountant (in respect of suppliers other than companies)
      giving the percentage of local content during execution prior to submission of last
      bill for payment.
5.2   A supplier who has been debarred / banned by any other procuring entity for
      violation of ‘Public Procurement (Preference to Make In India), Order 2017’
      (PPP-MII Order) dated 15.06.2017 issued by Department of Industrial Policy
      and Promotion (DIPP) shall not be eligible for preference under the aforesaid
      procedures for duration of the debarment. The local supplier shall be required
      to furnish a confirmation in this regard along with bid in the relevant format.
                                       Page 3 of 3
           VOLUME – III
1.0 DEFINITIONS
                  Unless the context otherwise requires, the following terms whenever used in
                  the Contract have the following meaning:
                  (a)      “Contract” means the Purchase Order/Service Order signed by the
                           Employer, to which these General Purchase Conditions (GPC) are
                           attached together with all the documents listed in such signed
                           Contract and the term “the Contract” shall in all such documents be
                           construed accordingly.
                  (b)      Applicable Law - This Contract including all matters connected with
                           this Contract shall be governed and construed in accordance with the
                           Indian Law both substantive and procedural and shall be subject to
                           the exclusive jurisdiction of Indian courts at Delhi, India.
                  (c)      Contract Price means the price to be paid for the performance of the
                           work detailed under Scope of Work, subject to such additions and
                           adjustments thereto or deductions there from, as may be made
                           pursuant to the Contract.
                  (d)      Bidder means the party to whom the Invitation for Bid is issued and
                           who submits its Bid..
                  (e)      “Contractor” means the person(s) whose bid to perform the Contract
                           has been accepted by the Owner and is named as such in the
                           Contract Agreement, and includes the legal successors or permitted
                           assigns of the Contractor.
                  (g)      Local Currency means the currency of the Government of India i.e.
                           Indian Rupees.
                  (h)      Party means NTPC or Bidder, as the case may be, and "Parties"
                           means both of them.
                  (k)      Law Governing the Contract : The Contract, its meaning and
                           interpretation, and the relation between the Parties shall be governed
                           by the Applicable Law.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             1 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
                  (o)      Site” or “Station” means the Power Plant where the supplies of
                           biomass pellets are to be made.
                  (q)    “Goods and Services Tax” or “GST” means taxes or cess levied under
                          the Central Goods and Services Tax Act, Integrated Goods and
                          Services Tax Act, Goods and Services Tax (Compensation to States)
                          Act and various State/Union Territory Goods and Services Tax Laws
                          and applicable cesses, if any under the laws in force (hereinafter
                          referred to as relevant GST Laws) which shall be fully complied with
                          by the bidder.
                  (r)      Throughout these Bidding Documents, the term “Bid” and “Tender”
                           and their derivatives (Bidder/ Tenderer, Bidding / Tendering, Bidding
                           Document/Tender Document, etc.); Bill of Quantity / Schedule of
                           Quantity/ Schedule of Quantities/ Bill of Quantities; Employer / NTPC;
                           Bid Security/ Earnest Money Deposit; Security Deposit / Performance
                           Security/ Performance Guarantee; Engineer-in-Charge / Engineer,
                           appearing anywhere in the Bidding Documents shall have the same
                           meaning and are synonymous to each other
1.1 “Sub-contractor from a country which shares a land border with India” means;
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             2 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
  1.1.1             The beneficial owner for the purpose of clause “1.1 (d)” above will be as
                    under;
                    d)     Where no natural person is identified under (a) or (b) or (c) above, the
                           beneficial owner is the relevant natural person who holds the position
                           of senior managing officials;
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             3 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
3.0 INTERPRETATION
Language
                  The singular shall include the plural and the plural the singular, except where
                  the context otherwise requires.
3.3 Headings
                  The headings and marginal notes in the General Conditions of Contract are
                  included for ease of reference, and shall neither constitute a part of the
                  Contract nor affect its interpretation.
3.4 Persons
3.5 Incoterms
                  Unless inconsistent with any provision of the Contract, the meaning of any
                  trade term and the rights and obligations of parties thereunder shall be as
                  prescribed by Incoterms.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             4 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
  3.6.1           The Contract to be entered into between the Employer and the Contractor
                  shall be on FOR NTPC Power Plant(s) basis.
3.6.2 NTPC shall place project wise Letter of Award for supplies.
  3.6.3           Prior to the expiration of the period of bid validity, the Employer will notify the
                  successful Bidder in writing by email or letter, that its bid has been accepted.
                  The Letter of award will constitute the formation of the contract and shall be
                  effective from the date of award.
                  Subject to GPC Sub-Clause 27.4 hereof, the Contract constitutes the entire
                  Agreement between the Employer and Contractor with respect to the
                  subject matter of Contract and supersedes all communications, negotiations
                  and agreements (whether written or oral) of parties with respect thereto made
                  prior to the date of Contract.
3.8 Amendment
3.10 Consortium
3.11 Non-Waiver
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             5 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
  3.11.2          Any waiver of a party’s rights, powers or remedies under the Contract must
                  be in writing, must be dated and signed by an authorized representative of
                  the party granting such waiver, and must specify the right and the extent to
                  which it is being waived.
3.12 Severability
                  “Origin” means the place where the materials and other supplies for the
                  Facilities are grown, produced or manufactured, and from which the services
                  are provided.
4.0 NOTICES
  4.1             Unless otherwise stated in the Contract, all notices to be given under the
                  Contract shall be in writing, and shall be sent by personal delivery, airmail
                  post, special courier, cable, telegraph, telex, facsimile or Electronic Data
                  Interchange (EDI) to the address of the relevant party set out in the contract.
  4.1.1           All notices to be given under the Contract shall be addressed to Engineer-in-
                  charge.
  4.1.2           Either party may change its postal, cable, telex, facsimile or EDI address or
                  addressee for receipt of such notices by ten (10) days’ notice to the other
                  party in writing.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             6 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
                  If any dispute of any kind whatsoever shall arise between the Employer and
                  the Contractor in connection with or arising out of the Contract, including
                  without prejudice to the generality of the foregoing, any question regarding its
                  existence, validity or termination, or the execution of the Facilities, whether
                  during the progress of the Facilities or after their completion and whether
                  before or after the termination, abandonment or breach of the Contract, the
                  parties shall seek to resolve any such dispute or difference by mutual
                  consultation. If the parties fail to resolve such a dispute or difference by
                  mutual consultation, then the dispute may be settled through Expert
                  Settlement Council / Arbitration / other remedies available under the
                  applicable laws.
  6.2.1.1.        A party shall notify the other party in writing about such a dispute it wishes to
                  refer for Conciliation within a period of 30 days from the date of raising of the
                  dispute in case of failure to resolve the same through mutual consultation.
                  Such Invitation for Conciliation shall contain sufficient information as to the
                  dispute to enable the other party to be fully informed as to the nature of the
                  dispute, amount of the monetary claim, if any, and apparent cause of action.
  6.2.1.2.        Upon acceptance of the invitation to conciliate, the other party shall submit its
                  counter claim, if any, within a period of 30 days from the date of the invitation
                  to conciliate. If the other party rejects the invitation or disputed amount
                  exceeds Rs 250 crores, there will be no Conciliation proceedings. There shall
                  be no Conciliation where claim amount is only up to Rs 5 lakhs.
  6.2.1.3.        If the party initiating Conciliation does not receive a reply within thirty days
                  from the date on which it sends the invitation, or within such other period of
                  time as specified in the invitation, it shall treat this as a rejection of the
                  invitation to conciliate from the other party.
6.2.2 Conciliation:
  6.2.2.1.        Where Invitation for conciliation has been furnished under GPC sub clause
                  6.2.1, the parties shall attempt to settle such dispute through Expert
                  Settlement Council (ESC) which shall be constituted by CMD, NTPC.
6.2.2.2. ESC will be formed from experts comprising three members from the panel of
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             7 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                          GENERAL PURCHASE CONDITIONS (GPC)
  6.2.2.3.        The eligible persons for consideration for empanelment in the panel of
                  conciliators shall be amongst Retired Civil Servants of Govt. of India not
                  below the rank of Additional Secretary, Retired Judges, Retired Directors/
                  Chairman of any Maharatna/Navratna company in India other than NTPC Ltd,
                  Retired Independent Directors who have served on the Board of any
                  Maharatna/ Navratna company in India other than NTPC Ltd and
                  Independent experts in their respective fields preferably registered with the
                  Indian Council of Arbitration or Delhi International Arbitration Centre or
                  Federation of Indian Chambers of Commerce and Industry or SCOPE
                  Arbitration Forum.
  6.2.3.1.        The claimant shall submit its statement of claims along with relevant
                  documents to ESC members, and to the party(s) indicated in the appointment
                  letter within 30 days of the issue of the appointment letter. The respondent
                  shall file its reply and counter claim (if any) within 30 days of the receipt of the
                  statement of claims. Parties may file their rejoinder/additional documents, if
                  any in support of their claim/counterclaim within next 15 days. No documents
                  shall be allowed thereafter, except with the permission of ESC.
6.2.3.2. The parties shall file their claim and counterclaim in the following format
  6.2.3.3.        In case of 3 members ESC, 2 members will constitute a valid quorum and the
                  meeting can take place to proceed in the matter after seeking consent from
                  the member who is not available. However, ESC recommendations will be
                  signed by all the members.
6.2.3.4. The parties shall be represented by their in house employees. No party shall
                                                                                                PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                                8 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
  6.2.3.6.        Depending upon the location of ESC members and the parties, the venue of
                  the ESC meeting shall be either Delhi/Mumbai/Kolkata/Chennai or any other
                  city whichever is most economical from the point of view of travel and stay
                  etc. All the expenditure incurred in ESC proceedings shall be shared by the
                  parties in equal proportion.
                  The cost of conciliation proceedings including but not limited to fees for
                  Conciliator, Airfare, Local transport, Accommodation, cost towards
                  conference facility etc shall be as provided herein below:
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             9 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
                                                      As     per    entitlement     of
                                                      Independent           Directors.
                                                      Executive class air tickets/
                                Travel from the       first class AC train tickets/
                                city         of       Luxury car/ reimbursement of
                        5       residence    to       actual     fare.      However,
                                the    city  of       entitlement of air travel by
                                meeting               Business class shall be
                                                      subject to austerity measures,
                                                      if any, ordered by Govt of
                                                      India.
                                Transport       to
                                and           fro
                                airport/railway       Car as per entitlement or Rs.
                        6
                                station in the        3,000
                                city            of
                                residence
                                Stay for out
                                                      As    per   entitlement         of
                        7       stationed
                                                      Independent Directors.
                                members
                                Transport in the      Car as per entitlement or Rs.
                        8
                                city of meeting       2000 per day
                    Aforesaid fees is subject to revision by NTPC from time to time and subject
                    to government guidelines on austerity measures, if any. All the expenditure
                    incurred in the ESC proceedings shall be shared by the parties in equal
                    proportions. The Parties shall maintain the account of expenditure and
                    present to the other for the purpose of sharing on conclusion of the ESC
                    proceedings.
  6.2.6           The parties shall keep confidential all matters relating to the conciliation
                  proceedings. Parties shall not rely upon them as evidence in arbitration
                  proceedings or court proceedings.
6.3 Arbitration
  6.3.1           If the process of mutual consultation and/or ESC fails to arrive at a settlement
                  between the parties as mentioned at GPC Sub-Clauses 6.1 & 6.2 above,
                  Employer or the Contractor may, within Thirty (30) days of such failure,
                  give notice to the other party, with a copy for information to the ESC (as
                  applicable), of its intention to commence arbitration, as hereinafter
                  provided, as to the matter in dispute, and no arbitration in respect of this
                  matter may be commenced unless such notice is given. The mechanism of
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             10 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
                  The parties at the time of invocation of arbitration shall submit all the details
                  of the claims and the counter-claims including the Heads/Sub-heads of the
                  Claims/Counter-Claims and the documents relied upon by the parties for their
                  respective claims and counter-claims. The parties shall not file any
                  documents/details of the claims and counter-claims thereafter.
                  The claims and the counter claims raised by the parties at the time of
                  invocation of the arbitration shall be final and binding on the parties and no
                  further change shall be allowed in the same at any stage during arbitration
                  under any circumstances whatsoever.
                  The parties to the contract shall invoke arbitration within Six months from the
                  date of completion of the Facilities under the contract or the termination of the
                  contract as the case may be and the parties shall not invoke arbitration later
                  on after expiry of the said period of six months. The parties shall not invoke
                  arbitration other than in the case of completion of the Facilities or the
                  termination of the contract as mentioned above.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             11 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                            GENERAL PURCHASE CONDITIONS (GPC)
                           provided under section 29B of the Arbitration and Conciliation Act, 1996
                           as amended.
                       If the claim is in foreign currency, the SBI Bills Selling Exchange rate
                       prevailing on the date of claim shall be used for the purpose of converting
                       the claim in Indian Rupee which may be used for determining the arbitration
                       fee as brought out above.
                            iii.   80% of the fees if the Hearing is concluded but the Award is yet to
                                     be passed.
f) Each party shall pay its share of arbitrator’s fees in stages as under:
iii. 20% at the time when arbitrator notifies the date of final award.
                                                                                              PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             12 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
                  i)      The Arbitrator shall give reasoned and speaking award and it shall be
                          final and binding on the parties.
8.0 SCOPE
  8.1             The Goods and related Services to be supplied shall be as specified in the
                  technical specification and Price Schedule. The Supplier shall supply all the
                  Goods and related Services included in the Scope of Supply, as per the
                  Delivery and Completion Schedule specified in the bidding documents
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             13 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
                  herewith
  8.2             The Supplier shall ensure that the Goods and related Services comply with
                  the technical specifications and other provisions of the Contract.
  8.3             The Goods and related Services supplied under this Contract shall conform
                  to the standards mentioned in Technical Specifications and, when no
                  applicable standard is mentioned, the standard shall be equivalent or
                  superior to the official standards whose application is appropriate.
                  The Delivery of the Goods and Completion of the related Services shall
                  be in accordance with the Delivery and Completion Schedule as
                  mentioned in the bidding documents herewith
  10.1            The Contractor shall supply biomass Pellets at NTPC Power Plant(s) with
                  due care and diligence in accordance with the Contract.
  10.2            The Contractor shall confirm that it has entered into this Contract on the
                  basis of a proper examination of the data relating to the Supplies provided by
                  the Owner, and on the basis of information that the Contractor could have
                  obtained from a visual inspection of the Site (if access thereto was available)
                  and of other data readily available to it relating to the Supplies as at the date
                  seven days prior to bid submission. The Contractor acknowledges that any
                  failure to acquaint itself with all such data and information shall not relieve its
                  responsibility for properly estimating the difficulty or cost of successfully
                  performing the Supplies.
  10.3            The Contractor shall acquire in its name all permits, approvals and/or
                  licenses from all local, state or national government authorities or public
                  service undertakings in the country where the Site is located that are
                  necessary for the performance of the Contract. The Contractor shall acquire
                  all other permits, approvals and/or licenses hereof and that are necessary for
                  the performance of the Contract.
  10.4            The Contractor shall comply with all laws in force, including in the country
                  where the Biomass Pellets Supplies are to be carried out. The laws will
                  include all national, provincial, municipal or other laws that affect the
                  performance of the Contract and bind upon the Contractor. The Contractor
                  shall indemnify and hold harmless the Owner from and against any and all
                  liabilities, damages, claims, fines, penalties and expenses of whatever nature
                  arising or resulting from the violation of such laws by the Contractor or its
                  personnel.
  10.5            Any Plant, Material and Services that will be incorporated in or be required
                  for the Facilities and other supplies shall have their origin as specified under
                  GPC Clause 3.13 (Country of Origin).
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             14 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
  10.6            Supplier shall comply with the provisions of e-way bill notified by appropriate
                  authorities from time to time. The Supplier shall be responsible for issuance
                  of e-way bill and other compliances relating to e-way bill as per GST Law.
                  The title of shipment shall pass on from Contractor to owner shall takes place
                  at respective NTPC stations upon receipt of biomass Pellets.
12.0 PACKING
                  The Supplier will be responsible for any loss or damage during transportation,
                  handling and storage due to improper packing.
                  All packages should be marked with Purchase Order/Service Order no. and
                  date. Each package must contain packing slip and literature, if any.
  14.0            PATENTS
                  All royalties and fees for patents covering material/equipment/ software or
                  processes used in executing the work shall be to the account of the bidder.
                  The supplier shall satisfy all demands that may be made at any time for
                  such royalties and fees.
                  The Supplier shall hold harmless and indemnify the Employer from and
                  against damage, loss and expenses arising from any claim for infringement of
                  patent, copy right, design and other such rights in existence or to be granted
                  on and application published prior to the completion of this engagement with
                  respect to or arising out of the use or supply of design or any work in
                  accordance with the specifications and plans furnished or recommended by
                  the Contractor.
                  The Supplier shall promptly notify the Employer in writing if the Supplier has
                  or has acquired knowledge of any patent under which claim or suit for
                  infringement could reasonably be brought because of the use by the
                  Employer of any information, recommendation or specifications, services
                  rendered by the Contractor.
                  The Supplier, in such case, shall furnish at its own cost make and furnish to
                  the Employer alternative specifications or recommendations to avoid the
                  same and without putting the Employer to any additional cost.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             15 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
15.0 INDEMNIFICATION
                  The Supplier shall, at its own expense, defend and indemnify the Employer
                  against all third party claims of infringement of Intellectual Property Rights,
                  including patent, trade mark, copy right, trade secret or industrial design rules
                  arising from use of the products or any part thereof.
                  The Supplier shall expeditiously extinguish any such claims and shall have
                  full rights to defend itself there from. The Employer shall not pay any
                  compensation to a third party resulting from such infringement and the
                  Supplier shall be fully responsible for the same, including all expenses and
                  court and legal fees.
                  The Employer will give notice to the Supplier of any such claim without delay,
                  shall provide reasonable assistance to the Contractor in disposing of the
                  claim, and shall at no time admit any liability for or express any intent to settle
                  the claim.
                  Final payment to the Supplier by the Employer will not be made while any
                  such suit or claim remains unsettled.
16.1 The Contract Price shall be as specified in the LOA/ Purchase Order.
  17.1            Except as otherwise specifically provided in the Contract, the Contractor shall
                  bear and pay all taxes, duties, levies and charges assessed on the
                  Contractor, its Sub-contractor or their employees by all municipal, state or
                  national government authorities in connection with the Facilities in and
                  outside of the country where the Site is located.
  17.2            The Bidder shall quote the prices giving breakup in the manner specified in
                  the Price Schedule. The Bidder shall quote the applicable rate of GST in the
                  Price Schedule.
  17.3            For the purpose of Evaluation, GST quoted in the Bid shall only be
                  considered.
  17.4            The Bidder shall indicate the taxes and duties as applicable seven (7) days
                  prior to last date of Techno-Commercial Bid Submission.
  17.5            The Bidder is required to quote the rate of GST applicable under GST Law in
                  the Price Schedule while giving the breakup of prices.
  17.6            In case GST registered Bidder has quoted GST rate as ‘0’ (Zero), the quoted
                  price shall be considered to be inclusive of GST as applicable.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             16 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
  17.8            The implications of GST on return of goods will be as per the provisions of
                  the relevant GST Laws.
  17.9            The Supplier shall issue tax invoices/bill of supply as applicable, file
                  appropriate returns, and deposit the applicable GST to the account of
                  appropriate government within the time limit prescribed under the GST Law.
                  In the event of any default, Supplier shall be liable to pay the amount which
                  may be imposed on NTPC due to such default.
  17.10           Supplier should comply with the provisions of e-way bill notified by
                  appropriate authorities from time to time. The existing provisions regarding
                  road permit will continue till such time if applicable.
  17.11           The Employer shall make necessary tax deductions under Income Tax Act or
                  any other laws, if applicable.
  17.12           The Contractor will be required to submit PAN details to the Project Manager
                  before the submission of the first bill
  17.14           The Contractor shall be responsible for the issuance of e-way bill and other
                  compliances relating to e-way bill as per GST law.
  17.15           The Employer will deduct GST at source at the applicable rates in case
                  transactions under the contract are liable to GST deduction at source as per
                  the prevailing provisions of GST Law.
  17.17           Under GST regime, party is eligible for input tax credit (ITC) on supply of
                  goods which is to be taken into account while submitting their bid price.
                  Contractor is solely responsible to get such ITC from the concerned
                  authorities. NTPC shall have no role in availing such benefits.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             17 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
The Contract shall come into force with effect from the date of award.
18.3 Modification:
  19.1            Payment will be made to the account of the Contractor according to the
                  payment terms stated here-in-after, based on the certification of Engineer-in-
                  Charge at respective NTPC Power Plant. Respective NTPC Plant shall
                  process the payments after the conditions listed for such payment have been
                  met, and the Contractor has submitted an invoice to respective NTPC Plant
                  specifying the amount due.
  19.2            All supply payments, including transportation, Insurance, taxes and duties
                  (wherever admissible) etc. shall be made direct to the Contractor by the
                  Employer .Bidder shall furnish the details of Bank Account in a prescribed
                  format (Annexure-S of Vol. IV) along with the Bid in order to facilitate the
                  owner to release payments electronically through Electronic Fund Transfer
                  System, wherever technically feasible. These payments shall be made
                  electronically only as per details of bank Account indicated in the contract,
                  wherever technically feasible. In case of any changes to the bank account
                  indicated in the Bidding documents, the Bidder shall immediately inform the
                  NTPC. The Bidder shall hold NTPC harmless and NTPC shall not be liable
                  for any direct, indirect or consequential loss or damage sustained by the
                  Bidder on the account of any error in the information or change in bank
                  details provided to the NTPC in the prescribed form without intimation to
                  NTPC duly acknowledged.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             18 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
  20.1            100% of payable amount shall be paid on receipt and testing of material at
                  site within 15 days.
                  The payment shall be processed by Engr-in -Charge (EIC). The bills are to
                  be submitted to EIC.
                  All the relevant payments due as per the contract shall be released to the
                  Contractor on production of documentary evidence such as LR copy/ e-
                  way bill/ toll tax receipts etc.
  20.3            The Consortium shall necessarily identify one of the partners as lead partner.
                  However, the partners of the Consortium are jointly and severally liable
                  to the Owner to perform all the contractual obligations.The Lead Partner
                  shall be authorised to receive instructions for and on behalf of any and all
                  Partners of the consortium and the entire execution of the Contract,
                  shall be done exclusively with the Lead Partner. NTPC may release
                  payment to the Lead Partner and/or to any of the consortium Partner (s) duly
                  authorized by the Lead Partner. However, the above is without any additional
                  liability of whatsoever nature to NTPC, in case of award of contract to a
                  consortium.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             19 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
  20.4            Payment terms for Price adjustment on account of indices: Any addition
                  due to adjustment to the Contract Price shall be payable in the similar
                  manner as provided in the clauses 20.1, 20.2 and 20.3 of GPC. Reduction to
                  the Contract Price, if any, due to price adjustment provisions, shall be
                  effected by recovering 100% of the reduction amount (including advance)
                  from any of the Contractor's bills falling immediately due for payment.
  20.5            All the relevant payments due as per the contract shall be released to the
                  Contractor on production of documentary evidence such as LR copy/ e-way
                  bill/ toll tax receipts etc, to ensure that Biomass Pellets have been
                  supplied from bidder's declared place (District) of manufacturing plant as
                  mentioned in Attachment-6 for the respective project .
                  In case the location of manufacturing Plant is not yet finalized, then bidder
                  may declare the tentative location of manufacturing Plant in Attachment-9.
                  However, the Bidder shall declare the location of their manufacturing
                  Plant within 180 days of placement of Award.
                  If a Contractor does not declare the Plant Location within 180 days of
                  Placement of Award, then the Contract is liable to be terminated and
                  security deposit of the bidder is liable to be forfeited and bidder is liable to
                  be debarred for subsequent tenders.
  20.6            The Consortium shall necessarily identify one of the partners as lead
                  partner. However, the partners of the Consortium are jointly and severally
                  liable to the Owner to perform all the contractual obligations.
                  The Lead Partner shall be authorised to receive instructions for and on behalf
                  of any and all Partners of the consortium and the entire execution of the
                  Contract, shall be done exclusively with the Lead Partner. NTPC may release
                  payment to the Lead Partner and/or to any of the consortium Partner (s) duly
                  authorized by the Lead Partner. However, the above is without any additional
                  liability of whatsoever nature to NTPC, in case of award of contract to a
                  consortium.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             20 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
                  If, after the date seven (7) days prior to the date of Bid submission, in the
                  country where the Site is located, any law, regulation, ordinance, order or by-
                  law having the force of law is enacted, promulgated, abrogated or changed
                  (which shall be deemed to include any change in interpretation or application
                  by the competent authorities) that subsequently affects the costs and
                  expenses of the Contractor and/or the supply period, the Contract Price shall
                  be correspondingly increased or decreased, and/or the supply period shall be
                  reasonably adjusted to the extent that the Contractor has thereby been
                  affected in the performance of any of its obligations under the Contract.
                  However, these adjustments would be restricted to direct transactions
                  between the Owner and the Contractor. These adjustments shall not be
                  applicable on procurement of raw materials, intermediary components, and
                  intermediary services etc. by the Contractor.
                  The failure of a party to fulfill any of its obligations under the Contract shall
                  not be considered to be a breach of or default under the Contract in so far
                  as such inability arises from an event of Force Majeure, provided that the
                  Party affected by such an event
                  (a) has taken all reasonable precautions, due care and reasonable
                      alternative measures in order to carry out the terms and conditions of
                      this Contract and
                  (b) has informed the other Party as soon as possible about the occurrence
                      of such an event.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             21 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
Burden of Proof:
                    The party, which is unable to fulfill its obligations under this agreement, shall
                    within 15 days of occurrence of any of the causes mentioned in this clause
                    shall inform the other party in writing of the existence or termination of the
                    circumstances preventing the performance of the contract. Certificate
                    issued by Chamber of Commerce or any other competent authority
                    connected with the case in the country of Contractors or the buyers shall be
                    sufficient proof of the existence of the above circumstances and their
                    duration. The Contractor who has given such notice shall be excused from
                    the performance or punctual performance of its obligations under the
                    Contract for so long as the relevant event of Force Majeure continues and
                    to the extent that such party’s performance is prevented, hindered or
                    delayed. The Time for Completion shall be extended accordingly.
  27.1              The Owner and the Contractor shall keep confidential and shall not, without
                    the written consent of the other party hereto, divulge to any third party any
                    documents, data or other information furnished directly or indirectly by the
                    other party hereto in connection with the Contract, whether such information
                    has been furnished prior to, during or following termination of the Contract.
  27.2              The Owner shall not use such documents, data and other information
                    received from the Contractor for any purpose other than the Supplies of
                    biomass Pellets. Similarly, the Contractor shall not use such documents,
                    data and other information received from the Owner for any purpose other
                    than Supplies of biomass pellets as are required for the performance of the
                    Contract.
  27.3              The obligation of a party under GPC Sub-Clauses 27.1and 27.2 above,
                    however, shall not apply to that information which
                     (a) now or hereafter enters the public domain through no fault of that
                         party
                     (b) can be proven to have been possessed by that party at the time of
                         disclosure and which was not previously obtained, directly or
                         indirectly, from the other party hereto
                     (c)   otherwise lawfully becomes available to that party from a third party
                           that has no obligation of confidentiality.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             22 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                          GENERAL PURCHASE CONDITIONS (GPC)
  27.4                 The above provisions of this GPC Clause 27 shall not in any way modify
                       any undertaking of confidentiality given by either of the parties hereto prior
                       to the date of the Contract in respect of the Facilities or any part thereof.
  27.5                 The provisions of this GPC Clause 27 shall survive termination, for
                       whatever reason, of the Contract.
                       The Contractor shall take necessary steps to ensure that all persons
                       employed on any work in connection with this engagement are fully aware
                       that the Indian Official Secrets Act 1923 (XIX of 1923) applies to them and
                       shall continue to apply even after the execution of such work(s) under the
                       Contract.
                   The Performance Bank Guarantee shall be valid till three months beyond the
                   expiry of Contract and shall remain in full force and effect during the period
                   that would be taken for satisfactory performance and fulfillment in all respect
                   of the contract.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             23 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
                  Employer’s name and address in respect of EOC, Noida and for the purpose
                  of BG may be taken as mentioned in IFB under address for Communication
                  in IFB.
                  In certain States, the Rules permit levy of stamp duty by the process of franking
                  under signature of empowered officer. Such BG may also be accepted as duly
                  stamped.
                  The date, purpose of purchase and name of the purchaser should be indicated
                  on the stamp paper. The stamp papers (other than e-stamp paper) should be
                  duly signed by the stamp vendor. The date of sale of the non-judicial stamp
                  paper, as indicated on the stamp paper should be of any date on or before the
                  date of execution of the BG. The name of the Purchaser of stamp paper may
                  either be the executing Bank or the party on whose behalf the BG is being
                  issued.
                  The name and designation of the Officer of the Bank executing the BG and
                  his power of Attorney/ Signing Power No. should be duly indicated in the
                  B.G.
                  Each page of the BG should be duly signed/ initialed by the executants and
                  Stamp of the Bank is affixed thereon. The last page of BG should be signed
                  with full particulars including the name of authorized signatory, full postal
                  addresses, telephone number, fax number etc. under the seal of the Bank as
                  required as per the prescribed proforma in the Bid documents.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             24 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
                   Neither the inspection by NTPC or any of their agents nor any order by
                   NTPC for payment of money or any payment for or acceptance of, the whole
                   or any part of the Works by NTPC, nor any extension of time, nor any
                   possession taken by NTPC shall operate as a waiver of any provision of the
                   Contract, or of any power reserved to NTPC, or any right to damages herein
                   provided, nor shall any waiver of any breach in the Contract be held to be a
                   waiver of any other or subsequent breach.
                    Neither the payment made by NTPC nor any extension of time for execution
                    of the Works granted by NTPC shall affect or prejudice the rights of NTPC
                    against the Successful Bidder or relieve the Contractor of his
                    obligations for the due performance of the Contract, or be interpreted as
                    approval of the Works done or discharge the liability of the Contractor for
                    the payment of damages whether due, ascertained, or certified or not, or
                    any sum against the payment of which they are bound to indemnify NTPC,
                    nor the acceptance by them of any sum paid affect or prejudice the rights of
                    the Contractor against NTPC.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             25 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
                  The failure of either party to enforce at any time any of the provisions of the
                  Contract or any rights in respect thereto or to exercise any option here in
                  provided, shall in no way be construed to be a waiver of such provisions,
                  rights or options or in any way to affect the validity of the Contract. The
                  exercise by either party of any of its rights herein shall not preclude or
                  prejudice either party from exercising the same or any other right it may have.
                   (a) neither Party shall be liable to the other Party, whether in contract, tort,
                       or otherwise, for any indirect or consequential loss or damage, loss of
                       use, loss of production, or loss of profits or interest costs, which may be
                       suffered by the other Party in connection with the Contract, provided that
                       this exclusion shall not apply to any obligation of the Contractor to pay
                       liquidated damages to the Employer and
                   (b) the aggregate liability of the Contractor to the Employer, whether under
                       the Contract, in tort or otherwise, shall not exceed the total Contract
                       Price, provided that this limitation shall not apply to any obligation of the
                       Contractor to indemnify the Employer with respect to patent infringement.
                   (c) the aggregate liability of the Employer to the Contractor, whether under
                       the Contract, in tort or otherwise, at any point of time during the
                       execution/performance of the Contract, shall not exceed the ‘total
                       Contract Price less payments already released to the Contractor’.
                  Contractor shall not be entitled to any interest or damage in case of any delay
                  on the part of the Employer to pay the amount due upon measurement or as
                  per Contract or otherwise. Contractor shall also not be entitled to interest
                  upon any guarantee/ security/ retention money or payments in arrears or
                  upon any balance which may on the final settlement of his account be due to
                  him.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             26 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
35.0 TERMINATION
                   (a) if the Supplier does not remedy a failure in the performance of their
                       obligations under the Contract, within thirty (30) days after being notified
                       or within any further period as the Employer may have subsequently
                       approved in writing;
                   (d) if the Supplier, in the judgment of the Employer has engaged in corrupt
                       or fraudulent practices in competing or in executing the Contract. For the
                       purpose of this clause: “Corrupt Practice” means the offering, giving,
                       receiving or soliciting of anything of value to influence the action of a
                       public official in the selection process or in contract execution.
                       “Fraudulent Practice” means a misrepresentation of facts in order to
                       influence a selection process or the execution of a contract to the
                       detriment of the Employer.
(e) if the Employer, at its sole discretion, decides to terminate this Contract.
                   (f) If the Contractor, sub-contracts any part of the works in violation of the
                       provision of ITB Clause 50.0.
                  Delivery schedule already finalized and intimated to the Contractor shall not
                  be terminated. The owner shall not be liable to the Contractor for any loss,
                  costs, damages or expenses on account of termination of the Contract
                  If any action in court is brought against for the failure or neglect on the part of
                  the Contractor to perform any acts, matter, covenants or things under the
                  Contract, or any damage or injury caused by the alleged omission or
                  negligence on the part of the Contractor, their employees, the Contractor
                  shall in all such cases indemnify and keep NTPC or their representatives,
                  harmless from all losses, damages, expenses or decrees arising of such
                  action.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             27 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
37.0 JURISDICTION
                  The courts in Delhi shall have the exclusive jurisdiction in matters arising
                  under the Contract.
38.0 ASSIGNMENT
                  The Contractor shall not, without the express prior written consent of the
                  Employer, assign to any third party the Contract or any part thereof, or any
                  right, benefit, obligation or interest therein or thereunder, except that the
                  Contractor shall be entitled to assign either absolutely or by way of charge
                  any monies due and payable to it or that may become due and payable to it
                  under the Contract.
                  The Owner may, without prejudice to any other remedy for breach of
                  contract, by written notice of default sent to the Seller, terminate the contract
                  in whole or part (at the option of the Owner) if:
  39.1            The Seller fails to deliver any or all of the goods within the time
                  period(s)specified in the Contract or any extension thereof granted by the
                  Owner; or(b) the Seller fails to perform any other obligation(s) under the
                  Contract.
  39.2            In the event the Owner terminates the contract in whole or in part, pursuant to
                  above, the Owner may procure, upon such terms and in such manner as it
                  deems appropriate, biomass pellets supplies of similar specifications and the
                  bidder shall be liable to the Owner for any excess costs for such similar
                  biomass pellets. However, the bidder shall continue performance of the
                  Contract to the extent not terminated.
                  In the event of Suppliers failure to supply the material of acceptable quality in
                  scheduled delivery period, NTPC reserves the right to procure the materials
                  from any other source at the Suppliers risk and cost and the difference in cost
                  shall be borne by the Supplier. Further, NTPC shall retain the right of
                  forfeiture of CPG and or any other action as deemed fit.
  39.3            The aforementioned right of termination shall be without prejudice to any
                  other rights and remedies that the Owner has under the Contract or in law
                  including but not limited to claiming liquidated damages on account of delay
                  in delivery of biomass pellets to the Destination site. Further any termination
                  of the Contract shall be without prejudice to any rights and remedies that
                  have accrued prior to the termination of the Contract.
                  The biomass pellets supply under the Contract, is meant for the purpose of
                  generation of power at NTPC power Plants. The Contractor shall ensure
                  compliance of all regulations/ conventions/ policies/ guidelines/ orders etc. of
                  Govt. of India/State in force related to any or all of the activities covered in
                  insurance, clearing, handling & forwarding, and insurance etc.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             28 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
                  biomass pellets, during the currency of the contract, the same shall become
                  applicable and binding on Contractor and NTPC with immediate effect.
                  In case of award, the contractor shall have to start delivery of material within
                  270 days from the date of award. However, to facilitate initial capacity ramp
                  up, no Liquidated Damage (LD) shall be levied for initial 120 days from
                  delivery start date (herein after referred as ‘NO LD period’).
                  After NO LD period, for annual supply shortfall more than 30% from the total
                  of daily delivery schedule in that year, Liquidated Damage (LD) at the rate of
                  5% of quoted FOR price (excluding taxes) per tonne shall be levied for supply
                  shortfall beyond 30% and shall be adjusted against running bills. For annual
                  supply shortfall up to 30% from the total of daily delivery schedule in that
                  year, no liquidated damage shall be levied.”
                  Although the contractor shall supply the material as per quantity offered on
                  daily basis, contractor shall have the flexibility to supply the material in greater
                  quantity than offered to supply on daily basis on mutual consent basis to
                  meet the annual supply requirement. In such case, Contractor shall give one
                  week advance intimation to NTPC site and NTPC site shall give the consent
                  to supply material in greater quantity after assessing traffic congestion or
                  other aspects as required.
                  NOTE: Wherever LD is recoverable as per the terms of the Contract, the
                  same shall be recovered from the contractor/ party along with applicable
                  GST. Further, GST invoice towards the same shall be issued to the
                  contractor/party.
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             29 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                            GENERAL PURCHASE CONDITIONS (GPC)
                  NTPC reserves the right to divert the supplies from a particular project to any
                  other project. Price for the new project will be decided after mutual
                  agreement between the Employer and the Contractor. Further, in case of
                  diversion, L1 price in terms of Rs/1000 kcal of the project wherein supplies
                  being diverted, shall be ceiling price
 Financial Status
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             30 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
 CLAUSE NO.                         GENERAL PURCHASE CONDITIONS (GPC)
48.0 WITHHOLDING/BANNING
                  The Employer has in place a Policy for withholding and Banning of Business
                  Dealings as enclosed at Annexure-I to General Purchase Conditions (GPC)
                  of the Bidding documents. Business dealings may be withheld or banned with
                  the Contractor on account of any Default by the Contractor under any of the
                  grounds as detailed in the said Withholding and Banning Policy.”
49.0 SUB-CONTRACTING
                                                                                             PAGE
Procurement of Biomass Pellets on FOR Power Station basis for NTPC Mouda, VOLUME-III (GPC)
                                                                                             31 of 31
Gadarwara and Khargone Power Plants; BID DOCUMENT NO.: CS-0011-112H -9
A Maharatna Company
Annexure-I
                 1
                                                                      A Maharatna Company
1. Introduction
  1.1   NTPC Ltd. deals with Agencies, who are expected to adopt ethics of
        highest standards and a very high degree of integrity, transparency,
        commitments and sincerity towards the work undertaken. It is not in the
        interest of NTPC to deal with any Agency, which commits deception,
        fraud or other misconduct of whatsoever nature in the tendering process
        and/or execution. NTPC is committed for timely completion of the
        projects within the awarded value without compromising on quality.
  1.2   Since banning of business dealings involves civil consequences for an
        Agency concerned it is incumbent that adequate opportunity of hearing
        is provided and the explanation, if tendered, is considered before
        passing any order in this regard keeping in view the facts and
        circumstances of the case.
2. Scope
  2.1   NTPC reserves its right to withhold or ban or suspend business dealings
        with any Agency, if such Agency is found to have committed misconduct
        or any of its action(s) fall into any such categories as laid down in this
        policy.
  2.2   The procedure for (i) Withholding, (ii) Banning and
                            with any Agency, has been laid down in these
        guidelines.
  2.3   The provisions of this Policy supersede and will have overriding effect on
        all earlier guidelines, procedures & system circulars issued for the similar
        purpose.
2.4 This policy comes into force from the date of its issuance.
  2.6   The provisions of this Banning Policy shall also be applicable for
        JVs/Subsidiaries of NTPC as well.
                                                                                       2
                                                                      A Maharatna Company
3. Definitions
  In these Guidelines, unless the context otherwise requires:
             The CMD shall be the ‘Competent Authority’ for the purpose of these
             guidelines. Board of Directors / Sub-committee of the Board of
             Directors / Group of Directors, nominated for the said purpose shall
             be the ‘Appellate Authority’ in respect of such cases.
   iv)    ‘List of Enlisted Agencies –shall mean and include list of Enlisted
          Parties / Contractors / Suppliers / Bidders, etc.
                                                                                       3
                                                                     A Maharatna Company
vi)     Fraud Prevention Policy – shall mean the policy related to prevention
        of fraud displayed on NTPC tender website http://www.ntpctender.com.
                                                                                      4
                                                                       A Maharatna Company
4.1 Grounds
      The business dealing with the Agency may be withheld, if they are found to
      be in breach of the terms & conditions of the Contract, on account of the
      reasons attributable to them, which shall include, but not be limited to the
      following:
if the Agency
      d) Fails to conduct the Guarantee test in the time limit stipulated in the
         contract.
      e) Diverts funds advanced to the Contractor for purpose other than the
         Contract.
                                                                                        5
                                                                      A Maharatna Company
m) A
      r)    The finished work either prematurely fails or fails to give the desired
           output/service during the defect liability period and the Agency fails to
           rectify it.
      s) On any ground as per which doing business dealings with the Agency
         is not in the public interest in the opinion of Competent Authority.
      t)   If the Agency fails to comply with any of the statutory laws and
           regulations in force, in totality, even after completion of work.
4.2 Procedure
                                                                                       6
                                                                    A Maharatna Company
                                                                                     7
                                                                          A Maharatna Company
          Duration of withholding the Agency shall be for a period of one year. Within
          this period, if the Agency rectifies the reason / ground on which the Agency
          has been withheld, to the satisfaction of the Competent Authority, then on
          written representation of the Agency, the Competent Authority can review
          and, if satisfied, may revoke the order of withholding of business dealing.
          Provided further that, even till completion of one year of withholding period,
          if the Agency does not rectify, then the Competent Authority after reviewing
          the situation may issue order extending the period of withholding for one
          more year or advise initiation of action for banning of business dealings with
          Agency in accordance with the procedure prescribed in Para 5.2 below.
                                                                                           8
                                                                     A Maharatna Company
i)   If business dealings with the Agency have been banned by the Ministry of
     Power or Government of India and the ban is still in force,
                                                                                      9
                                                                       A Maharatna Company
s)    If the Agency violates the provisions of the Integrity Pact provided in the
      Contract.
t)    If the Agency commits fraud as defined under the Fraud Prevention Policy of
      NTPC.
(Note: The examples given above are only illustrative and not exhaustive. The
     Competent Authority may decide to ban business dealing for any good and
     sufficient reason).
5.2 Procedure
For SSC/Site cases, if the gravity of the misconduct is such that it would not
                                                                                      10
                                                                       A Maharatna Company
       Once the proposal for issuance of Show Cause Notice is approved by the
       Competent Authority, a ‘Show Cause Notice’ duly vetted by legal
       department shall be issued by the Competent Authority himself or by a
       person authorized for the said purpose to the delinquent Agency. The
       Agency shall be asked to submit the reply of Show Cause Notice within 15
       days of its issuance. Further, the Agency shall be given an opportunity for
       Oral hearing to present its case in person, if it so desires, and the date for
       Oral Hearing shall be necessarily indicated in the Show Cause Notice.
                                                                                      11
                                                                     A Maharatna Company
      The purpose of issuing the Show Cause Notice is only that the Agencies
      concerned shall be given an opportunity to explain their stand before any
      action is taken. All that is required in such cases is that the grounds on
      which action is proposed to be taken shall be disclosed to the Agency
      inviting representation and after considering that representation, orders
      may be passed. Such orders require only the subjective satisfaction of the
      authority that passed the final orders.
      Reply to the Show Cause Notice given by the Agency and their submissions
      in oral hearing, if any, will be processed by the Standing Committee for
      obtaining final decision of the Competent Authority in the matter. Further,
      reply to the Show Cause Notice given by the Agency and submissions in
      oral hearing, if any, with regards to Vigilance cases shall be processed by a
      Separate Committee which shall put up its final recommendations to the
      Competent Authority in the matter.
      In case, no reply to Show Cause Notice is received from the Agency within
      stipulated time, action for processing ex-parte against the concerned
      Agency shall be initiated
      The speaking order for banning the business dealing with the Agency shall
      be issued (after vetting by legal deptt) by the Competent Authority himself
      or by a person authorized for the said purpose. In cases where investigation
      has been carried out by Vigilance Department or CBI etc., the speaking
      order will also be vetted by Vigilance Department before issuance.
                                                                                    12
                                                                    A Maharatna Company
      The decision regarding banning of business dealings taken after the issue
      of a Show Cause Notice and consideration of representation, if any, in reply
      thereto, shall be communicated to the Agency concerned along with a
      reasoned order. The fact that the representation has been considered shall
      invariably be mentioned in the communication. Also the fact that if no reply
      was received to the Show Cause Notice shall invariably be indicated in the
      final communication to the Agency.
      The period for which the ban would be operative may be mentioned in the
      order. The banning shall normally be for a period of three years. However,
      in cases processed under provisions of Integrity pact and Contractor
      Performance Feedback and Evaluation System, the banning would be
      operative for a period as specified therein.
                                                                                   13
                                                                      A Maharatna Company
       The Agency, after issue of the order of banning of business dealings, would
       not be allowed to participate in any future tender enquiry and if the Agency
       has already participated in tender process and the price bids are not
       opened, his techno-commercial bid will be rejected and price bid will be
       returned unopened. However, where the price bids of Agency have been
       opened prior to order of banning, bids of Agency shall not be rejected.
       The names of the Agencies with whom Business Dealings have been
       banned at Site/SSC/Region/Company level shall be hosted at NTPC website
       by CC&M (for company wide banning cases) and respective Sites/ SSC/
       Regions (for respective Site/SSC/ Regional cases).
       The Agency may file an appeal against the order of the Competent Authority
       banning of business dealing before Appellate Authority. Such an appeal shall
       be preferred within one month from the date of receipt of the order of
       banning of business dealing. Appellate Authority would consider the appeal
       and pass appropriate order which shall be communicated to the Agency as
       well as the Competent Authority.
   b) In all other cases, an order for banning passed for a certain specified period
      shall be deemed to have been automatically revoked on the expiry of that
                                                                                     14
                                                                   A Maharatna Company
   specified period and it will not be necessary to issue a specific formal orders
   of revocation, except that an order of banning passed on account of
   doubtful loyalty or security consideration shall continue to remain in force
   until it is specifically revoked.
c) An order of banning for the reasons mentioned at para 5.1 (e) above may
   be revoked if, in respect of the same facts, the accused has been wholly
   exonerated by a Court of Law.
                                                                                  15
A Maharatna Company
               16
                                                                     A Maharatna Company
Agency Agency
Agency
                                                                    Agency then in
          such   case   Agency
                                                                                    17
                               A Maharatna Company
Agencies
Agency
                                              18
                                                               A Maharatna Company
                                                                              19
Annexure-II
        VOLUME - IV
TECHNICAL SPECIFICATION (TS)
                                               VOLUME-IV
       TECHNICAL SPECIFICATIONS FOR AGRO RESIDUE BASED NON-TORREFIED AND
                           TORRIEFIED BIOMASS PELLETS
S.No                                                           Description
1.      About NTPC           NTPC Ltd. (A Govt. of India Enterprises), a Maharatna Company, is
                             India’s largest power generation company with its roots planted way
                             back in 1975 to accelerate power development in India. Since then it
                             has established itself as the dominant power major with presence in the
                             entire value chain of the power generation business. From fossil fuels,
                             it has forayed into generating electricity from hydro and renewable
                             energy sources. The total installed capacity of the company is 69,134
                             MW (including JVs). NTPC has an ambitious plan to become 130 GW
                             plus company by 2032.
2.      Introduction         From largely coal based generation, NTPC will have a diversified fuel
                             mix by 2032, with non-fossil fuel based generation capacity making up
                             more than 30% of NTPC’s portfolio. In this direction, NTPC has led the
                             way in co-firing agro-residue based Biomass pellets (Biomass Pellets
                             would mean both Non-torrefied and Torrefied pellets taken together,
                             unless specified otherwise) with coal for power generation.
                             Biomass pellets firing in boilers result in net zero CO2 emissions as the
                             emitted CO2 gets absorbed in next crop cycle by photosynthesis. Thus,
                             it is a carbon neutral fuel and a renewable source of energy. Even after
                             considering energy use in agro-residue collection, processing and
                             transportation, there is significant net CO2 reduction as compared to
                             coal firing, making it a greener alternative.
                             This initiative would also address the issue of burning of stubble (i.e.
                             paddy straw and other agro-residues) in the fields by farmers, while also
                             generating additional revenue for them.
                             Stubble burning in fields emits large amount of ash/soot/ unburnt carbon
                             to the atmosphere which is the real cause of air pollution and elevates
                             the PM 2.5 and PM 10 level in atmosphere. When agro-residue based
                             fuel is utilized in coal fired power plants, it undergoes complete
                             combustion and the resulting ash is also almost completely absorbed in
                             Electrostatic Precipitator (ESP), preventing air pollution while
                             generating power.
5.     Supply Duration        5.1 The bidder shall offer to supply Biomass pellets on daily basis for
                                  seven years.
                              5.2 However, if due to any reason attributed to NTPC or reason
                                  mentioned in the force majeure clause, party is not able to supply
                                  allocated quantity of non torrefied pellets / torrefied pellets to NTPC
                                  as per the schedule, additional three months grace period
                                  corresponding to each one year of supply period shall be provided
                                  to the party. Thus, 21 Months grace period shall be given
                                  corresponding to supply period of seven years. Further, in case
                                  supplies are restricted for more than 03 months in a year due to
                                  reason mentioned in the force majeure clause. Then stations shall
                                  extend grace period by more than 03 months for a corresponding
                                  year. In this grace period bidder shall be able to supply leftover
                                  quantity out of total allocated quantity of material to NTPC. The time
                                  extension may also be allowed in case of extended monsoon, grid
                                  restrictions and extended shutdown.
6.     Delivery start date    6.1 In case of award, the supplier shall start delivery of material within
       and delivery               270 days from the issue of LOI based on mutually agreed
       address                    schedule.
10. Price          Bidder is required to quote GCV value of biomass pellets in Kcal/Kg within
    adjustment for the acceptable range as given below in the table.
    GCV variation
                                        Torrefied pellets          Non-torrefied pellets
                   Acceptable GCV Between 3400 Kcal/Kg to Between 2800 Kcal/Kg to
                   range without        5000 kcal/Kg               4000 kcal/Kg
                   penalty              [both inclusive]           [both inclusive]
                      For any variation in the GCV (ARB) from the quoted GCV, the “Adjusted
                      FOR Price” shall be calculated as per the following formula.
                      Adjusted FOR Price = (𝑄𝑢𝑜𝑡𝑒𝑑 𝐹𝑂𝑅 𝑝𝑟𝑖𝑐𝑒 ∗ 𝐴𝑐𝑡𝑢𝑎𝑙 𝐺𝐶𝑉 (𝐴𝑅𝐵)) / 𝑄𝑢𝑜𝑡𝑒𝑑 𝐺𝐶𝑉
                      (𝐴𝑅𝐵)
                    For GCV >4000 Kcal/Kg [For GCV more Material will be accepted, however
                    than 4000 Kcal/Kg] for Non Torrefied as received GCV(ARB) shall be
                    pellets                              taken as 4000 Kcal/KG for
                                                         calculating adjusted FOR price,
                                                         Which shall be the adjusted
                                                         payable price.
                    For GCV >5000 Kcal/Kg [For GCV more Material will be accepted, however
                    than 5000 Kcal/Kg] for Torrefied pellets as received GCV(ARB) shall be
                                                             taken as 5000 Kcal/KG for
                                                             calculating adjusted FOR price,
                                                             Which shall be the adjusted
                                                             payable price.
                    For GCV <2600 Kcal/Kg [For GCV less No payment shall be made for
                    than 2600 Kcal/Kg]                  already delivered material
                    For GCV <2000 Kcal/Kg [For GCV less No payment shall be made for
                    than 2000 Kcal/Kg]                  already delivered material
12. Rejection of     The consignment of biomass pellets arrived at NTPC shall initially be tested
    consignment      for following before unloading and shall be rejected in case parameter exceeds
                     the rejection level given in following table-
                      Table:2
                      Technical data                          Unit   Rejection level
17. Progress          As per clause 6 of this volume, delivery start date shall be within 270 days of
    Report           issue of LOI. 270 days are given to the bidder to set up manufacturing facility,
    Submission       if such facility does not exist at the time of issue of LOI.
                     During this period, supplier shall submit the monthly progress report to
                     engineer-in charge regarding progress of setting up of pellet plant project
                     through e-mail on the format provided by NTPC.
                     LOA shall be issued when the bidder is ready to start supply of pellets.
18. Bid Evaluation The bid comparison shall be done on Rupees per 1000 Kcal basis. Bid shall
                       be rejected if the quoted GCV is outside the acceptable range given in
                       clause 8 of this volume.
19. Price          Please refer Clause 30 of Volume-II of Instrcution to Bidders (ITB) for detailed
    adjustment     calculations and provisions regarding Price Escalation. (please check after
                   commercial bid doc finalisation)
20 Quantity          The permissible limit of deviation over the original quantity of each item will be
   Variation         (+)20% for Torrefied pellets and (+) 50% for Non Torrefied pellets, on same
                     rates and terms and conditions on mutual consent basis between vendor and
                     NTPC station. However, for supply shortfall beyond 30% of the contracted
                     quantity, LD shall be applicable as per Volume–III, Clause 43 of General
                     purchase conditions (GPC).
Example
          Suppose one collects 30 Kg sample from One truck and total no of trucks
          received in a day from a particular vendor is ‘N’ then the total pellet sample
          collected will be around ‘30N’ Kg. ‘N’ can be 1,2,3 …or so on.
          Prepare a cone (heap) of ‘30N’ Kg and divide the cone from top to bottom and
          remove the half portion (left or right). Further, prepare the cone for remaining ‘15N’
          Kg of pellet and divide the heap and remove the pellet of side opposite to the side of
          previous removal. Now, the balance available qty of pellet is ‘7.5N’ Kg and continue
          this process till the pellet sample is reduced to ‘4-5’ Kg. The final laboratory sample
          shall be distributed as per Clause 14.6 for determination of GCV and other technical
          parameters.
    We, the undersigned, have read the technical specifications for agro residue based
    biomass pellets, volume- IV and declare the following:
(a) We have read and completely understood the technical specification document and have
    no reservations to it including amendments/clarifications.
(b) We have quoted the GCV and price in price bid for the agro residue based Torrefied and
    Non-Torrefied biomass pellets having technical specification as follows:
S.,No     Technical data       Unit      Specified Value range          Specified Value range
                                           Torrefied pellets            Non Torrefied pellets
(c) We understand that quantity and price adjustment shall be made for supplying the
    material deviating from acceptable range given in the technical specification as per clause
    10 and 11 of technical specification (Volume-IV).
(d) We understand that consignment not meeting acceptance limits of parameters as per
    clause 12 of technical specification (Volume-IV) shall be rejected.
(e) We understand that if the quoted GCV is outside the acceptable range that is (Between
    3400 Kcal/Kg to 5000 kcal/Kg [both inclusive] for Torrefied pellets and Between 2800
    Kcal/Kg to 4000 kcal/Kg [both inclusive] for Non Torrefied pellets, the bid shall be
    rejected.
(f) We understand that liquidated damage (LD) shall be recovered for supply shortfall as per
    tender conditions.
(g) We declare that we have read the bid document and have no reservation to it and shall
    abide by its provisions.
Name/ Designation: Name of Company/firm/agency
                                          General Details
         1.   Name of company/ Firm /Agency
                                                       -
         2.   Address of manufacturing location
                                                       -
         3.   Date of dispatch
                                                       -
         4.   Batch number
                                                       -
         5.   Carriage Vehicle type/ Number
                                                       -
         6.   Weight                                  Kg            Gross weight
                                                                    Tare weight
                                                                   Material weight
                                           Technical Details
              Dimension of torrefied pellet (in mm)
                 • Maximum Diameter (in mm)
     1           • Maximum length (in mm)
              Further, certify that “No dimension
              exceeds 35 mm”
Name/ Designation:
   Signature:                                                  Date :
   Place:
                                                                                      Annexure-T
                                                                                      Page 1 of 6
                       TECHNO-COMMERCIAL BID SUBMISSION FORM
To,
NTPC Limited,
6th Floor, Engineering Office Complex,
Plot No. A-8A, Sector 24, NOIDA ,
Gautam Budh Nagar, 201301, U.P
India.
Sub:   Invitation for Bid for “ Procurement of Biomass Pellets on FOR Power Station basis for
       NTPC Mouda, Gadarwara and Khargone Power Plants”; Bidding Documents No. CS-
       0011-112H-9
Dear Sirs,
       We have thoroughly examined and understood the instructions, Scope of work and the terms
       and conditions etc. covered in the bidding documents issued by NTPC Limited being fully
       aware of nature and Scope of Work required.
       We hereby confirm our acceptance and compliance to the entire provisions of Technical
       specifications, Scope of Work, and terms and conditions covered in the bidding documents.
       We declare that the work will be executed strictly in accordance with the requirement and
       bidding documents provisions.
1.1    We confirm that we have declared the NTPC stations for which we are intending to quote for
       biomass pellets in the format Attachment 6. We confirm that we have furnished all the
       requisite information/documents in relevance to our quoted NTPC power stations. Further,
       we confirm that the we have furnished the price bids along with price schedule(s) for these
       plants only. We understood that the price bids for those NTPC power stations shall be
       considered by NTPC for which we are considered to be qualified and techno-commercial bid
       as acceptable.
                      Procurement of Biomass Pellets on FOR power station basis
                   for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                  Bidding Doc. No. CS‐0011‐112H‐9
                                                                                         Annexure-T
                                                                                         Page 2 of 6
2.1         We have read all the provisions of the Bidding Documents including “Restrictions on
            procurement from a Bidder of a country which shares a land border with India”
            and confirm that notwithstanding anything stated elsewhere in our bid to the contrary,
            the provisions of the Bidding Documents, are acceptable to us and we further confirm
            that we have not taken any deviation to the provisions of the Bidding Documents
            anywhere in our bid.
            Any deviation, variation or additional condition etc. or any mention, contrary to the
            provisions of Bidding Documents and its subsequent Amendment(s)/
            Clarification(s)/Addenda/Errata (if any) found anywhere in our bid proposal, implicit or
            explicit shall stand unconditionally withdrawn, without any cost implication whatsoever
            to the Employer, failing which our bid security shall be forfeited.
2.2         We further declare that additional conditions, variations, deviations, if any, found
            anywhere in the proposal, shall not be given effect to.
2.3         We confirm that we fulfill the requirements of Local content for Class-I local supplier.
            The details of the location(s) at which the local value has been added are as under:
            We confirm that we fulfill the requirements of Local content for Class-I local
            supplier for Item(s) mentioned at Annexure-V in Technical Specifications, as
            applicable. We further confirm that in case such item(s) are bought-out for us,
            we shall source the same from Class-I local supplier only.
            We undertake that a certificate from the statutory auditor or cost auditor (in the case
            the bidder is a company) or from a practicing cost accountant or practicing
            chartered accountant (in respect of bidders other than companies) certifying the
            percentage of local content shall be submitted by us prior to submission of our last
            bill for payment.
2.4         #We further confirm that we are presently not debarred / banned by any other
            procuring entity for violation of ‘Public Procurement (Preference to Make in
            India), Order 2017’ (PPP-MII Order) dated 15.06.2017 and its subsequent
            revisions / amendments issued by Department for Promotion of Industry and
            Internal trade (DPIIT).”
                        Procurement of Biomass Pellets on FOR power station basis
                     for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                    Bidding Doc. No. CS‐0011‐112H‐9
                                                                                             Annexure-T
                                                                                             Page 3 of 6
             #In case a Bidder has been banned/debarred by any other procuring entity for
             violation of ‘Public Procurement (Preference to Make In India), Order 2017’
             (PPP- MII Order) dated 15.06.2017 and its subsequent revisions / amendments
             issued by Department of Industrial Policy and Promotion (DIPP), the same may
             be declared by Bidder by striking off para above and declaring the details of
             banning using additional sheets.
              Bidder may also enclose additional sheets in similar format (if required), for
              providing details pertaining.
2.5          We have read the ITB clause regarding “Restrictions on procurement from a bidder
             of a country which shares a land border with India and on sub-contracting to
             contractors from such countries”. We certify that we/our Collaborator/JV
             Partner/Consortium member/Assignee are/is not from such a country or, if from such a
             country, have/has been registered with the Competent Authority and we will not sub-
             contract any work to a contractor from such countries unless such contractor is
             registered with the Competent Authority. We hereby certify that we fulfill all requirements
             in this regard and are eligible to be considered.
3
3.1         In line with the requirement of the Bidding Documents, we hereby confirm that we have
            submitted the following documents as specified in Bidding documents, in digital form in
            “Fee Cover”:
3.2    We have submitted the Unconditional Techno-Commercial Bid Submission Form duly
       completed together with the following attachments in Pre-Qual/Technical Cover/Envelope:
    d) Attachment-5 (in Bidder’s format): Consortium agreement (if applicable) entered into by
       the consortium partners shall be submitted with the bid.
           Documents in accordance with Clause ITB clause 1.5 seeking Quantity allocation as per
           Bidding Documents provision
                           Procurement of Biomass Pellets on FOR power station basis
                        for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                       Bidding Doc. No. CS‐0011‐112H‐9
                                                                                               Annexure-T
                                                                                               Page 4 of 6
            ‐   Attachment 7A: Bidder’s turnover data for last 5 financial years as per Employer’s
                format along with supporting documents
                Any other document, bidder feels is important to establish the allocation and fulfill the
                tender requirements.
      j)   Attachment-10: Under taking for availing Benefits as “Punjab, Haryana and NCR
           bidders” [as applicable] as per format Annexure-Alloc- A-2
           Technical Data Sheets duly filled in as per the Employer's format, enclosed as Annex-I to
           Technical Specifications.
           We confirm that our Techno-Commercial Bid should not contain any price content
           entry. Further we understand that in case, our Techno-Commercial Bid is found to
           contain any price content, our bid shall be liable for rejection by NTPC.
           We have quoted for the entire quantity as mentioned in the Price schedule of Bidding
           Document and also quoted the prices for those plants covered in the package for which we
           are intended to offer biomass pellets as specified at Attachment 6, as per provisions of the
           bidding documents.
                     Procurement of Biomass Pellets on FOR power station basis
                  for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                 Bidding Doc. No. CS‐0011‐112H‐9
                                                                                         Annexure-T
                                                                                         Page 5 of 6
4.0   We certify compliance to complete bid documents by accepting the following General
      Technical Evaluation(GTE) at NTPC e-tender portal https://eprocurentpc.nic.in:
4.1   We further declare that additional conditions, variations, deviations, if any, found in the bid,
      shall not be given effect to.
4.2   We undertake, if our bid is accepted, to commence work on supply of biomass pelletes
      immediately upon your Letter of Award to us and to achieve the requirements specified in the
      bidding documents.
5.0   We undertake, if our bid is accepted, to provide Bank Guarantees towards Contract
      Performance Security etc. as per stipulated formats and amounts and within the time
      specified in the bidding documents.
6.0   We agree to abide by this bid for a period of 180 days from the date of opening of Techno-
      Commercial bids, as stipulated in the Bidding Documents; and it shall remain binding upon
      us and may be accepted by NTPC at any time before expiration of that period.
8.0   We understand that NTPC is not bound to accept the lowest or any other bid, NTPC may
      receive.
9.0   We, hereby, declare that only the persons or firms interested in this proposal as principals
      are named here and that no other persons or firms other than those mentioned herein have
      any interest in this proposal or in the Contract to be entered into, if the award is made on us,
      that this proposal is made without any connection with any other person, firm or party
      likewise submitting a proposal, is in all respects for and in good faith, without collusion or
      fraud.
                              Procurement of Biomass Pellets on FOR power station basis
                           for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                          Bidding Doc. No. CS‐0011‐112H‐9
                                                                                                                  Annexure-T
                                                                                                                  Page 6 of 6
Yours faithfully,
Date :
(Designation)
Business Address :
Email :
Phone No. :
                             Procurement of Biomass Pellets on FOR power station basis
                          for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                         Bidding Doc. No. CS‐0011‐112H‐9
                                                                                                                   Attachment-1
                                                                                                                     Page 1 of 1
To
We confirm that we have read the provisions of the bidding document no. CS-0011-112H-9 and we
hereby declare the following:
     1. We confirm that, in case we withdraw our offer within the validity period of the offer provided
         in the bidding documents or any extension thereof, then we shall be treated as ineligible for
         participation in the future tenders issued from NTPC for a period of 06 months from the date
         of withdrawal of the bid.
     2. In addition, we also confirm that in case after having been issued the Notification of
         Award/Purchase Order of a package, we either do not accept the Notification of
         Award/Purchase Order or do not sign the Contract or do not submit an acceptable
         Performance Security as per bidding documents provision, and which result in tender being
         annulled then we shall be treated ineligible for participation in re-tendering of this particular
         package and contractual action may be taken against us as per the provisions of the Bidding
         documents. Further, NTPC shall also be free to take further actions as per the provisions of
         the policy for Withholding and Banning of Business Dealings.
Date: Signature
NOTE :
           (i) Bidder may note that in case they do not submit the aforesaid declaration or no
                confirmation is indicated by them or statement/any declaration like ‘later’, ‘to be
                furnished later’, ‘NA’ etc. are indicated against the declaration, then the bid shall
                be rejected by EMPLOYER as being non-responsive and shall not be opened.
                                                                            Attachment-2
                                                                              Page 1 of 1
POWER OF ATTORNEY
                                                                                  Attachment-3
                                                                                   Page 1 of 1
                  Bidder should fill-in the following information and upload the same in the
                  offer)
                                                                    NTPC Limited,
                                                                    Contract Services
                                                                    6th Floor, Engg. Office
                                                                    Complex, Plot A-8A,
                                                                    Sector-24, Noida –
                                                                    201301
 Type of Company
 (Proprietary/ Partnership/Company/
 Consortium / Cooperative Societies
 registered in India AND / OR Non-
 Resident Indians / Persons of Indian
 Origin AND / OR a Multi-National
 Company having its registered office
 in India registered / Overseas
 Corporate Bodies having its
 registered office in India.)
GSTIN No
Telephone
Fax
  E mail ID
  Name and Address of
  Supplying and Invoicing
  vendor along with NTPC
  vendor code, if known to the
  bidder.
Documents Required
Individual applicant to attach following documents
   1. ADHAR CARD, PASSPORT, PAN CARD AS PROOF OF AGE FOR MEETING
      QUALIFICATION REQUIREMENT
   2. Supporting Document for Type of Company as mentioned in sl no. 2 of this
      attachment
   3. Copy of Udyog Aadhar Registration Certificate (Applicable for MSE bidders) as
      mentioned in sl no. 3 of this attachment
   4. GST Registration Certificate
        Bidder shall submit valid GST registration certificate. Bidder is required to upload scanned
        copy of Attachment-14 along with the bid on the GePNIC portal.
         Bidder has to submit documentary evidence regarding their GST registration. However, in
         case bidder is not able to submit valid GST registration along with the Bid then the Bidder
         shall submit GST registration within 180 days of placement of Award or before the date of
         commencement of supplies, whichever is earlier.
                      Procurement of Biomass Pellets on FOR power station basis
                   for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                  Bidding Doc. No. CS‐0011‐112H‐9
                                                                                      Attachment-4
                                                                                        Page 1 of 2
                                                               Contract Services,
                                                               NTPC Limited, 6th Floor,
                                                               Engg. Office Complex,
                                                               Plot A-8A,Sector-24,
                                                               Noida-201301
Dear Sirs,
   1. We have not submitted bid in conjunction with any other bidder or have not submitted
       bid in any other name, either directly or indirectly.
If it is found at any stage of bidding or during currency of the Contract (if awarded), that we have
any common controlling shareholders or ownership, directly or indirectly, with any other
participating bidder(s), for a particular project, then our Bid or Contract (if awarded) shall be
rejected / terminated.
                         Procurement of Biomass Pellets on FOR power station basis
                      for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                     Bidding Doc. No. CS‐0011‐112H‐9
                                                                                                       Attachment-4
                                                                                                         Page 2 of 2
3. We fully understand that NTPC would deal directly and exclusively with us for the subject
4. We, hereby, undertake that we shall deal directly with NTPC and have not engaged any
                                                      (Seal) ............................................
                           Procurement of Biomass Pellets on FOR power station basis
                        for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                       Bidding Doc. No. CS‐0011‐112H‐9
                                                                                                                Attachment-5
                                                                                                                  Page 1 of 4
                                                              AND
                                            M/S............................................
AND
 WHEREAS, the Owner invited Bids for ‘[Name of the PACKAGE]’ vide its Bidding Document
 No. [………..]’ The Parties are interested in jointly bidding for the Contract as members of a
 Consortium and in accordance with the terms and conditions of the tender bidding documents
 in respect of the Contract.
 AND WHEREAS ITB Clause No 1.4 of Bidding Documents stipulates that the bidder can be a
 Consortium of Domestic partners. The Consortium shall also necessarily identify one of the
 partners as Lead Partner. Further it stipulates that in this case, the bidder shall provide along
 with the bid, a Consortium Agreement in which the partners in the Consortium are jointly and
 severally liable to the Owner to perform all contractual obligations. The Consortium
 Agreement shall be submitted along with the bid, failing which the Bid liable for rejection.
                        Procurement of Biomass Pellets on FOR power station basis
                     for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                    Bidding Doc. No. CS‐0011‐112H‐9
                                                                                                   Attachment-5
                                                                                                     Page 2 of 4
AND WHEREAS the bid has been submitted to the Owner vide proposal
no…………………………..dated ……………….. based on Consortium Agreement being these
presents and the bid in accordance with requirement of Bidding Documents have been signed
jointly by all the partners and submitted to NTPC/Owner.
In this agreement, capitalized terms shall, unless context otherwise requires, have the
meaning prescribed thereto under the bidding documents.
      1. That in consideration of the Award of the Contract by the Owner to the Consortium, we
         the partners to the Consortium Agreement do hereby agree that Partner-1
         (M/s...........................................................), shall act as the Lead Partner for self and
         formed on behalf of Partner-2 and partner-3 (strike off if not applicable), and further
         declare and confirm that we shall be jointly and severally be bound unto the Owner for
         the successful performance of the contract in accordance with the Contract Terms and
         shall be jointly and severally liable to the Owner to perform all the Technical and
         Contractual obligations. Further, the Lead Partner is authorised to incur liabilities and
         receive instructions for and on behalf of any and all partners of the Consortium and the
         entire execution of the Contract shall be done exclusively with the Lead Partner.
1.1       In case of any breach of the said Contract by any of the partner(s) of the Consortium
          Agreement, the other partner(s) hereby agree to be fully liable and responsible for the
          successful performance of the Contract in accordance with the terms of the Contract.
3.        The financial liability of the partners of the Consortium Agreement, to the Owner with
          respect to any and all claims arising out of the performance or non- performance of the
          Contract shall, however, be not limited in any way so as to restrict or limit the liabilities
          of any of the partner.
                                                                                  Attachment-5
                                                                                    Page 3 of 4
         days of Award of Contract, from a Bank in favour of Owner for a value as stipulated
      under the Contract and this shall be in the name of all partners of the Consortium.
5.    It is expressly understood and agreed between the partners to this Agreement that the
      responsibilities and obligations of each of the partners shall be delineated in
      Appendix-1 to this Agreement. It is further agreed by the partners that the
      abovesharing of responsibility and obligations shall not in any way be a limitation of joint
      and several responsibilities of the partners under the Contract.
6.    We, the Consortium partners agree and undertake that this Agreement shall be
      irrevocable and shall form an integral part of the Contract. We further agree that this
      Agreement shall continue to be enforceable till the successful performance of Contract
      and till the Employer discharges it. We further, agree that this Agreement shall be
      without any prejudice to the various liabilities of the Consortium partners as well as
      other obligations of Consortium partners in terms of the Contract.
7.    The Parties hereby undertakes to participate in the bidding process for each project(s)
      of the subject tender only through the Consortium and not individually and/or through
      any other Consortium constituted for this Contract, either directly or indirectly or
      through any of their associates.
9.     The parties herein undertake to take all necessary measures in order to avoid any
      conflict of interest during the performance of the contract.
10.   All Consortium partners of this agreement shall fully indemnify, hold harmless and
      defend Owner and its officers etc., from and against all claims, liabilities, suits,
      damages including any criminal liability due to false declaration by the Consortium with
      regards to this Agreement, tender or Contract etc., cause due to
      negligence/commission/omission of any or all of the consortium partners , its
      employees and agents including representative or sub-contractor or any other person
      claiming under this Contract.
11.   The Consortium partners shall be jointly and severally - responsible for the quality of
      all the works and timely execution thereof to meet the completion schedule under the
      Contract.
12.   This agreement shall be construed and interpreted in accordance with the Laws of
      India and the Courts of Delhi shall have exclusive jurisdiction.
13.   That this Agreement shall be operative from effective date of the Contract.
                         Procurement of Biomass Pellets on FOR power station basis
                      for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                     Bidding Doc. No. CS‐0011‐112H‐9
                                                                                                                      Attachment-5
                                                                                                                        Page 4 of 4
1 Name..................................... .................................................................
Designation..........................
         Name...............................                             Company.......................
         Company.......................
1. Name..................................... .................................................................
Designation..........................
         Name...............................                             Company.......................
         Designation...........................
(STRIKE OFF THE PORTION BELOW IF THERE ARE ONLY TWO PARTNERS IN THE
CONSORTIUM)
1. Name..................................... .................................................................
Designation..........................
         Name...............................                             Company.......................
         Designation...........................
                        Procurement of Biomass Pellets on FOR power station basis
                     for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                    Bidding Doc. No. CS‐0011‐112H‐9
                                                                                           Attachment-6
                                                                                             Page 1 of 2
Dear Sirs,
  1.       In terms of ITB Clause 1.1, We declare that we are interested in participating for
           the following Projects for Non-Torrefied/ Torrefied Biomass Pellets Procurement
           Package for various Plants of NTPC as mentioned in column A & column B of below
           mentioned table
2. Gadarwara
3. Khargone
II. AVAILING BENEFITS AS PUNJAB, HARYANA AND NCR BIDDERS (If applicable)
   2.    In case bidder intents to be considered under Punjab, Haryana and NCR quota, it
         may be noted that action may be taken as per the terms of contract, if it is found
         during the execution that the raw material is not sourced from Punjab / Haryana /
         NCR .
                                            (Seal) ............................................
                      Procurement of Biomass Pellets on FOR power station basis
                   for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                  Bidding Doc. No. CS‐0011‐112H‐9
                                                                                                   Attachment-7
                                                                                                     Page 1 of 1
Dear Sirs,
  We seek allocation under Clause 1.5 of ITB, our qualification data in support thereof is
  enclosed in the Attachments enclosed at Annexures as per following:
* Bidder to Mention (Yes / No) against each of the Allocation Criteria brief as mentioned in
table above for Quantity allocation as per provisions of bidding documents and accordingly
furnish the relevant information and documents in subsequent Annexures
                                                       (Seal) ............................................
                      Procurement of Biomass Pellets on FOR power station basis
                   for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                  Bidding Doc. No. CS‐0011‐112H‐9
                                                                                          ANNEXURE- 7A
                                                                                          PAGE 1 OF 1
To,
NTPC Limited,
Contract Services
6th Floor, Engg. Office Complex,
Plot A-8A, Sector-24,
Noida - 201301
We confirm that our annual turnover in the preceding Five (5) financial years as on date of
Techno-Commercial bid opening as under. In support of above, we are enclosing audited
financial statements or certified by Chartered Accountant (in case audited financial statement is
not available) and the details are as under :
(Seal) ............................................
                                                                                  ANNEXURE- 7B
                                                                                    PAGE 1 OF 2
To,
     NTPC Limited,
     Contract Services
     6th Floor, Engg. Office Complex,
     Plot A-8A, Sector-24,
     Noida - 201301
     This is to certify that M/s ………………………………… (Name of the Bidder) having its
     registered office at ……………………………………. and **Manufacturing plant is located
     at…………………………………………… (address of Manufacturing Plant) / **Manufacturing
     plant is under construction which is located at…………………………………………… (address
     of under construction Manufacturing Plant).
     **It is certified that M/s   (Name of the bidder) is a manufacturer of Agro-residue based
     (*Torrefied/Non Torrefied / both Torrefied & Non-Torrefied) biomass pellets having capacity of
     ………………(in Tonnes per Day) and the Plant is functional since……………(date of start of
     manufacturing).
     It is verified from the Books of Accounts of M/s …………………….(Name of the Bidder) that
     they have completed the setting up of the Agro-residue based Biomass Pellet Manufacturing
     Plant located at…………………………………………… (address of Manufacturing Plant) is
     registered under MSMED Act 2006, (Udyog Aadhaar Registration) ………………………….
     Dated……………….., category: ……………….(Micro/Small). (copy enclosed)
            Procurement of Biomass Pellets on FOR power station basis
         for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                        Bidding Doc. No. CS‐0011‐112H‐9
                                                                      ANNEXURE- 7B
                                                                        PAGE 2 OF 2
To,
NTPC Limited,
Contract Services
6th Floor, Engg. Office Complex,
Plot A-8A, Sector-24,
Noida - 201301
This is to certify that we, M/s …………………………………(Name of the Bidder), are having
Financial Tie ups with following Banks/Financial Institutions for establishment of manufacturing
facilities of Agro-residue based (*Torrefied/Non Torrefied / both Torrefied & Non-Torrefied) with
total manufacturing capacity ……………which is as under:
We have enclosed copy of Tie ups letter issued by Banks/Financial Institutions to this Annexure.
                                                    (Seal) ............................................
                    Procurement of Biomass Pellets on FOR power station basis
                 for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                Bidding Doc. No. CS‐0011‐112H‐9
                                                                                            Attachment-8
                                                                                            PAGE 1 OF 1
                               DECLARATION OF PAST ORDERS
We declare that we are executing following long term Orders (Contract Period of 04
years and above) for #Non- Torrefied/ Torrified Biomass Pellets Procurement Package
for various Plants of NTPC :
                                                                     Quantity Supplied
    S.No   Name of Project            Ordered Quantity (in                                            *Period of
                                                                     on 07 days prior to
                                      Million Tonnes)                                                 Contract
                                                                     Techno-
                                                                     Commercial Bid
                                                                     opening date (in
                                                                     Million Tonnes)
We understand that the above declaration shall be used in line with the provisions of bidding
document
                                                    (Seal) ............................................
                    Procurement of Biomass Pellets on FOR power station basis
                 for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                Bidding Doc. No. CS‐0011‐112H‐9
                                                                                                Attachment-9
                                                                                                  Page 1 of 1
 With reference to our bid against subject Tender Invitation, we have attached relevant
 documents for availing benefits to MSEs as per PPP 2012 and its subsequent amendments,
 if any. We are aware that benefits of MSEs under PPP 2012 are available to manufacturer of
 goods and not to traders/dealers and accordingly, we hereby undertake that:
 * We are Producer/ manufacturer of the quoted item and understand that the benefits as
    applicable to MSEs under PPP 2012 including Purchase Preference shall be applicable as
    per provisions of Bidding Document for all the quoted item of our bid.
 We also understand that in case documents submitted by us for availing benefits/ exemptions
 applicable to MSEs under PPP 2012 are not found to be in order by NTPC Limited/ Employer
 at any stage of Bid Evaluation and Bid security declaration form and/or cost of Bid Documents
 (wherever applicable) have also not been submitted by us then our bid shall not be
 considered further for evaluation and be rejected.
Thanking you,
                                                    (Seal) ............................................
                     Procurement of Biomass Pellets on FOR power station basis
                  for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                 Bidding Doc. No. CS‐0011‐112H‐9
                                                                                        Attachment-10
                                                                                           Page 1 of 2
                                       Technical Data Sheets
     Technical Data Sheets duly filled in as per the Employer's format, enclosed as Annex-I to
                                     Technical Specifications.
Declaration by Bidder
    We, the undersigned, have read the technical specifications for agro residue based biomass
    pellets, volume- IV and declare the following:
(a) We have read and completely understood the technical specification document and have no
    reservations to it including amendments/clarifications.
(b) We have quoted the GCV and price in price bid for the agro residue based Torrefied and
    Non-Torrefied biomass pellets having technical specification as follows:
S.,No    Technical data         Unit       Specified Value range           Specified Value range
                                             Torrefied pellets             Non Torrefied pellets
(c) We understand that quantity and price adjustment shall be made for supplying the material
    deviating from acceptable range given in the technical specification as per clause 10 and 11
    of technical specification (Volume-IV).
(d) We understand that consignment not meeting acceptance limits of parameters as per
    clause 12 of technical specification (Volume-IV) shall be rejected.
(e) We understand that if the quoted GCV is outside the acceptable range that is (Between
    3400 Kcal/Kg to 5000 kcal/Kg [both inclusive] for Torrefied pellets and Between 2800
    Kcal/Kg to 4000 kcal/Kg [both inclusive] for Non Torrefied pellets, the bid shall be rejected.
(f) We understand that liquidated damage (LD) shall be recovered for supply shortfall as per
    tender conditions.
(g) We declare that we have read the bid document and have no reservation to it and shall
    abide by its provisions.
Thanking you,
Date:
                                                 (Signature) ..............................................
                                                       (Seal) ..............................................
                       Procurement of Biomass Pellets on FOR power station basis
                    for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                   Bidding Doc. No. CS‐0011‐112H‐9
                                                                                                       Attachment-11
                                                                                                         Page 1 of 1
Additional Information
Dear Sirs,
We wish to provide the following additional information in our Bid. We confirm that no price
component has been included in the additional information.
-------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------------
Note :      Continuation sheets of like size and format may be used as                                          per
requirement
                   Procurement of Biomass Pellets on FOR power station basis
                for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                               Bidding Doc. No. CS‐0011‐112H‐9
                                                                                Attachment 12
                                                                                   Page 1 of 3
We, hereby authorize the Employer to make all our payments through Electronic Fund Transfer
System. The details for facilitating the payments are given below:
4. BANK PARTICULARS
IF OTHERS, SPECIFY
I/We hereby declare that the particulars given above are correct and complete. If the transaction
is delayed or credit is not affected at all for reasons of incomplete or incorrect information, I/We
would not hold the Employer responsible.
SIGNATURE
DATE :
(AUTHORISED SIGNATORY)
Name:
OFFICIAL STAMP
BANK CERTIFICATION:
It is certified that above mentioned beneficiary holds a bank account no.          with our branch
and the Bank particulars mentioned above are correct.
SIGNATURE
DATE
(AUTHORISED SIGNATORY)
Authorization No. :
Name:
                                                      OFFICIAL STAMP
                   Procurement of Biomass Pellets on FOR power station basis
                for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                               Bidding Doc. No. CS‐0011‐112H‐9
                                                                                Attachment-13
                                                                                   Page 1 of 3
CHECKLIST OF DOCUMENTS
S.     Description                                                                 Enclosed
No.                                                                                (Yes/No)
2.     Attachment-3: Bidder details as per Employer format along with ( Yes* / No* )
       required documents as mentioned therewith.
                                                                                  Attachment-13
                                                                                     Page 2 of 3
        Attachment 7A: Bidder’s turnover data for last 5 financial years ( Yes* / No* )
        as per Employer’s format along with supporting documents
Date : (Signature).....................................
(Designation)..................................
                                                                                 Annexure P
                                                                                 Page 1 of 3
Sub: Invitation for Bid for “Procurement of Biomass Pellets on FOR Power Station basis
for NTPC Mouda, Gadarwara and Khargone Power Plants (LOT 2) Bidding Doc. No. CS-
0011-112H-9
Dear Sirs,
1.0    We have thoroughly examined and understood the instructions, Scope of work and the
       terms and conditions etc. covered in the bidding documents issued by NTPC, being fully
       aware of nature and Scope of Work required.
       We hereby confirm our acceptance and compliance to the entire provisions of Technical
       specifications, Scope of Work, and terms and conditions covered in the bidding
       documents. We declare that the work will be executed strictly in accordance with the
       requirement and bidding documents provisions.
       1.1    We further understand that discount letter, if any, separately uploaded online or
              submitted in physical form shall not be considered for the purpose of evaluation
                   Procurement of Biomass Pellets on FOR power station basis
                for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                               Bidding Doc. No. CS‐0011‐112H‐9
                                                                                Annexure –P
                                                                                 Page 2 of 3
2.1   In line with the requirement of the Bidding Documents, We have submitted the duly
      completed following attachments in Pre-Qual Envelope of Price bid
2.2   Further, we hereby confirm that we have submitted the following documents as specified
      in Bidding documents, as per standard format in “Finance Cover” of the Price bid :
a) Price BOQ
      We have quoted for the entire quantity in Price BOQ in line with provisions of bidding
      documents. We have submitted Techno Commercial bid for s bject package through our
      GePNIC id for NTPC IFB/Tender No.: 2022_NTPC_67326_1.
      We are aware that the Price Schedules do not generally give a full description of the
      work to be performed under each item and we shall be deemed to have read the
      Technical Specifications, and other sections of the Bidding Documents to ascertain the
      full scope of work included in each item while filling in the rates and prices. We agree
      that the entered Rates / prices shall be deemed to include the full scope as aforesaid,
      including overheads and profit, as per bidding document provisions.
3.1   We have read all the provisions of the Bidding Documents and confirm that
      notwithstanding anything stated elsewhere in our bid to the contrary, the provisions of
      the Bidding Documents are acceptable to us and we further confirm that we have not
      taken any deviation to the provisions of the Bidding Documents anywhere in our bid.
      We have furnished our compliance to the provisions of the Bidding Documents and its
      subsequent Amendment(s)/Clarification(s)/Addenda/Errata by accepting the following
      General Technical Evaluation(GTE) at NTPC e-tender portal https://eprocurentpc.nic.in
                                                                                                               Annexure –P
                                                                                                                Page 3 of 3
4.0      We agree to abide by this bid including the price bid for a period of 180 days from the
         date of opening of Techno-Commercial bids as stipulated in the Bidding Documents and
         it shall remain binding upon us and may be accepted by NTPC at any time before the
         expiration of that period.
5.0      We understand that NTPC are not bound to accept the our bid or any other bid, NTPC
         may receive.
6.0      We undertake, if our bid is accepted, to provide Bank Guarantees towards Contract
         Performance Security etc. as per stipulated formats and amounts and within the time
         specified in the bidding documents.
8.0      We undertake, if our bid is accepted, to commence work for supply of biomass pellets
         upon your Letter of Award to us and to achieve completion of our obligations within the
         time specified in the Bidding Documents.
9.0      We, hereby, declare that only the persons or firms interested in this proposal as
         principals are named here and that no other persons or firms other than those mentioned
         herein have any interest in this proposal or in the Contract to be entered into, if the
         award is made on us, that this proposal is made without any connection with any other
         person, firm or party likewise submitting a proposal, is in all respects for and in good
         faith, without collusion or fraud.
Yours faithfully,
Date :
(Designation)
Business Address :
   Procurement of Biomass Pellets on FOR power station basis
for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
               Bidding Doc. No. CS‐0011‐112H‐9
                                                                                                             Annexure-F1
                                                                                                             Page 1 of 2
(On Non-judicial stamp paper of same value on which original BG was executed)
To,
NTPC Limited,
……………………………
…………………………..
……………………………
…………………………..
Dear Sirs,
Except as provided above, all other terms and conditions of the original Bank Guarantee
No.............................. dated .................. shall remain unaltered and binding.
Please treat this as an integral part of the original guarantee to which it would be deemed to
have been attached.
(Signature ..........................................
(Name & Designation).......................
(Bank's Seal) ....................................
Dated_________
SEAL OF BANK
                    Procurement of Biomass Pellets on FOR power station basis
                 for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                Bidding Doc. No. CS‐0011‐112H‐9
                                                                                 Annexure-F1
                                                                                 Page 2 of 2
Note:
1.@ The extension of the Bank Guarantee should be forwarded to the Unit/Project/Corporate
Centre, from where the extension has been sought.
2. The extension of BG should be on Non-Judicial stamp paper/e-stamp paper of appropriate
value as per Stamp Act prevailing in the State(s) where the BG is submitted or is to be acted
upon or the rate prevailing in the State where the BG is executed, whichever is higher. The
Stamp Paper/e-Stamp paper shall be purchased in the name of Bidder/Bank issuing the
guarantee.
                   Procurement of Biomass Pellets on FOR power station basis
                for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                               Bidding Doc. No. CS‐0011‐112H‐9
                                                                                               Annexure-F2
                                                                                                Page 1 of 3
                            PERFORMANCE SECURITY FORM
                       (To be stamped in accordance with Stamp Act)
To, Date...............................................
Dear Sirs,
                                                                                     Annexure-F2
                                                                                      Page 2 of 3
The Purchaser shall have the fullest liberty without affecting in any way the liability of the Bank
under this guarantee, from time to time to extend the time for performance of Contract by the
Seller. The Purchaser shall have the fullest liberty, without affecting this guarantee to postpone
from time to time the exercise of any powers vested in them or of any right which they might
have against the Seller, and to exercise the same at any time in any manner, and either to
enforce or to forbear to enforce any covenants, contained or implied in the contract between the
Purchaser and the Seller or any other course of remedy or security available to the Purchaser.
The Bank shall not be released of its obligations under these presents by any exercise by the
Purchaser of its liberty with reference to the matters aforesaid or any of them or by reason of
any other act or forbearance or other acts of omission or commission on the part of the
purchaser or any other indulgence shown by the Purchaser or by any other matter or thing
whatsoever which under law would, but for this provision, have the effect of relieving the Bank.
The Bank also agrees that the purchaser at its option shall be entitled to enforce this guarantee
against the bank as a principal debtor, in the first instance without proceeding against the seller
and notwithstanding any security or other guarantee that the purchaser may have in relation to
the seller’s liabilities.
Notwithstanding anything contained hereinabove our liability under this guarantee is restricted to
………………... and it shall remain in force up to and including ……… (*)……… and shall be
extended from time to time for such period (not exceeding one year), as may be desired by M/s
………………………….. on whose behalf this guarantee has been given.
WITNESS
1) SIGNATURE ………………………                       SIGNATURE ……………………………………..
  NAME ……………….                               NAME …………………………...
  OFFICIAL ADDRESS …………                      DESIGNATION …………………………………..
                                             BANK’S COMMON SEAL
2) SIGNATURE …………………………                      ATTORNEY AS PER POWER OF ATTORNEY
  NAME ……………...                              NO…………
  OFFICIAL ADDRESS ………………                    DATE …………….
                     Procurement of Biomass Pellets on FOR power station basis
                  for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                 Bidding Doc. No. CS‐0011‐112H‐9
                                                                                    Annexure-F2
                                                                                     Page 3 of 3
NOTE :
  1. (*) The Date will be Three Months beyond the expiry of the warranty period as
     specified in the order.
2. The Bank Guarantee shall be from a bank as per provisions of bidding documents.
  3. While getting the Bank Guarantee issued, Bidders are required to ensure compliance to the
     points mentioned in the Bank Guarantee Verification Check List in the bidding documents.
     Bidders are required to fill up this check List and enclose the same alongwith the Bank
     Guarantee.
  4. The Stamp paper of appropriate value shall be purchased in the name of guarantee issuing
      bank or the party on whose behalf the BG is being issued. The Bank Guarantee shall be
      issued on non-judicial Stamp paper of appropriate value as per Stamp act prevailing in the
      States where the BG is to be submitted or is to be acted upon or the rate prevailing in the
      state where the BG is executed, whichever is higher.
  5. The details of secure SFMS (in case of BGs issued from within India) or SWIFT (in case of
     BGs issued from outside India) sent by Supplier’s Bank to Employer’s Beneficiary Bank
     details of which are given in GPC must be furnished with the BG.
  6. ** Security deposit @ 7 lakh per 20 TPD for 7 year tenders. Further security deposit
     amount shall be computed @3.5 Lakhs per 10 TPD or part thereof the awarded
     quantity.
                              Procurement of Biomass Pellets on FOR power station basis
                           for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                          Bidding Doc. No. CS‐0011‐112H‐9
                                                                       Annexure-F-3
                                                                         Page 1 of 2
                    CHECK LIST FOR BANK GUARANTEE VERIFICATION BY BIDDER
3. Amount of BG ........................................................
5. Validity of BG ........................................................
8.        Bank Reference
          (Name, Address, Tel. & Fax No., email)                        ........................................................
                                                          CHECK LIST
------------------------------------------------------------------------------------------------------------------------
S.No.              Details of Checks                                                                        Yes/No
------------------------------------------------------------------------------------------------------------------------
a)        Is the BG on non-judicial stamp paper of
          appropriate value, as per Stamp Act ?[i.e. ....]                     ...............................................
                                                                                                                     ANNEXURE-F-3
                                                                                                                         PAGE 2 OF 2
-----------------------------------------------------------------------------------------------------------------------------
S.No.              Details of Checks                                                                        Yes/No
-----------------------------------------------------------------------------------------------------------------------------
c)        In case of BGs from Banks abroad, has the BG                         ................................................
          been executed on Letter Head of the Bank.
(Designation) ............................................
Note: The Bidder is required to fill up this form and enclose along with the Bid Security / Bank
      Guarantee.
                     Procurement of Biomass Pellets on FOR power station basis
                  for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                 Bidding Doc. No. CS‐0011‐112H‐9
                                                                                  Annexure-F4
                                                                                    Page 1 of 3
*Note - Any Addition/ Deletion/ Modification in Bank list shall be as per changes in Second
        Schedule List by RBI from time to time
      * In case, Bank Guarantee is getting issued from State Bank of India, Bidder to take
        note of NTPC letter ref. NTPC/FC/CS/BG/01 dated 03.09.2014 and SBI letter ref.
        CAG-I/AMT-1/2014-15/370 dated 04.09.2014 enclosed herewith.
   Procurement of Biomass Pellets on FOR power station basis
for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
               Bidding Doc. No. CS‐0011‐112H‐9
   Procurement of Biomass Pellets on FOR power station basis
for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
               Bidding Doc. No. CS‐0011‐112H‐9
                        Procurement of Biomass Pellets on FOR power station basis
                     for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                    Bidding Doc. No. CS‐0011‐112H‐9
                                                                                                    Annexure-F5
                                                                                                     Page 1 of 1
Dear Sirs,
1.0    With reference to our Bid Proposal No ................................... dated .................. for [Insert
       Name of the Package “Procurement of biomass pellets for VARIOUS NTPC Power Plants,
       Bid Document No. CS-0011-112H-9, we hereby confirm that we comply with all terms,
       conditions and specifications of the Bidding Documents read in Conjunction with
       Amendment(s)/Clarification(s)/ Addenda/Errata (if any) issued by the Employer prior to
       opening of Techno Commercial Bids and the same has been taken into consideration while
       making our Techno-Commercial Bid & Price Bid and we declare that we have not taken any
       deviation in this regard.
2.0    We further confirm that any deviation, variation or additional condition etc. or any mention,
       contrary to Bidding Documents and its Amendment(s)/ Clarification(s)/ Addenda/ Errata (if
       any) as mentioned at 1.0 above found anywhere in our Techno-Commercial Bid and/or Price
       Bid, implicit or explicit, shall stand unconditionally withdrawn, without any cost implication
       whatsoever to Employer, failing which the bid security shall be forfeited.
Dear Sirs,
(a)    The details furnished by us in attachment of bid, for establishing the compliance to specified
       Qualifying Requirement are in accordance with ITB, Clause 1.4 of Volume II of the Bidding
       documents.
(b)    No change or substitution in respect supply Experience and Handling Experience for
       meeting the specified Qualifying Requirement (QR) shall be offered by us.
We have read the contents of the Fraud Prevention Policy of NTPC displayed on its tender website
http://www.ntpctender.com and undertake that we along with our associates/collaborators/ sub-
contractors /sub-vendors / consultants/ service providers shall strictly abide by the provisions of the
Fraud Prevention Policy of NTPC.
     We have read the contents of the Banning Policy of NTPC attached with this Bidding
     Document and agree to abide by this policy. Further, in terms of requirement under Banning
     policy we also declare the following:
     b)     We have not employed any public servant dismissed/removed or person convicted for
            an offence involving corruption or abetment of such offences.
            We also accept that if at any point subsequent to award of Contract, the declarations
            given above are found to be incorrect, NTPC Limited shall have the full right to
            terminate the Contract and take any action as per applicable laws for breach of
            contract including forfeiture of Bid Security/Performance Bank Guarantee.
To
Contract Services
NTPC Limited
Noida - 201301
Dear Sir,
1.0 I, M/s......................................... (CEO of the company / CFO of the company)*, declare that
2.0 I hereby confirm and undertake that the unaudited unconsolidated financial statements
submitted in respect of the bidder/consortium as part of the bid reference
no...........................dated.................. have been considered for the purposes of the finalisation of
Consolidated financial statements of the Holding Company as part of the Annual Reports.
3.0 I further, certify that the figures in the unaudited unconsolidated financial statements are true
and correct and same have been duly reflected in the audited consolidated financial statements
and/or Annual Report of the Holding Company.
(Seal) ............................................
                                          INTEGRITY PACT
                                                Between
           NTPC Ltd., a Govt. of India Enterprise (hereinafter referred to as "The Employer")
                                                  and
              ………………………… (hereinafter referred to as "The Bidder/Contractor ")
                                                  and
       ………..………………. (hereinafter referred to as "JV Partner/ Consortium Members"
                                                                                   (if applicable)
                                               Preamble
      The Employer invites the bids from all eligible bidders and intends to enter into Contract for
      ………………………………………………… with the successful bidder(s), as per
      organizational systems and procedures. The Employer values full compliance with all
      relevant laws and regulations, and the principles of economical use of resources, and of
      fairness and transparency in its relations with its Bidder(s) and/or Contractor(s).
      In order to achieve these goals, the Employer will appoint Independent External Monitor(s)
      (IEM), who will monitor the bidding process and the execution of the Contract for compliance
      with the principles mentioned above.
      1.        The Employer Commits itself to take all measures necessary to prevent corruption
                and to observe the following principles in this regard:-
                b)    The Employer shall, during the bidding process treat all Bidders with equity and
                      reason. The Employer will, in particular, before and during the bidding process,
                      provide to all Bidders the same information and will not provide to any Bidder
                      confidential/additional information through which the Bidder(s) could obtain an
                      advantage in relation to the bidding process or the Contract execution.
c) The Employer will exclude from the process all known prejudiced persons.
      2.        If the Employer obtains information on the conduct of any of its employees which is a
                criminal offence under the IPC/PC Act or if there be a substantive suspicion in this
                    Procurement of Biomass Pellets on FOR power station basis
                 for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                Bidding Doc. No. CS‐0011‐112H‐9
                                                                                   Annexure – F10
                                                                                       Page 2 of 6
            regard, the Employer will inform the Chief Vigilance Officer and in addition can initiate
             disciplinary actions.
            a)      The Bidder/ Contractor undertakes not to, directly or through any other person
                    or firm offer, promise or give or influence to any employee of the Employer
                    associated with the bidding process or the execution of the contract or to any
                    third person on their behalf any material or immaterial benefit which he/she is
                    not legally entitled, in order to obtain in exchange any advantage of any kind
                    whatsoever during the bidding process or during the execution of the contract.
            d)      The Bidder/ Contractor, when presenting his bid, undertakes to disclose any
                    and all payments made, or is committed to or intends to make to agents,
                    brokers or any other intermediaries in connection with the bidding process
                    and / or award of the contract.
      2.    The Bidder/ Contractor will not instigate and allure third persons/parties to commit
            offences outlined above or be an accessory to such offences.
                   Procurement of Biomass Pellets on FOR power station basis
                for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                               Bidding Doc. No. CS‐0011‐112H‐9
                                                                                 Annexure – F10
                                                                                     Page 3 of 6
Section 3 Disqualification from Bidding Process and Exclusion from Future Contracts
      4.    The Bidder with its free consent and without any influence agrees and undertakes to
            respect and uphold the Employer's absolute rights to resort to and impose such
            exclusion and further accepts and undertakes not to challenge or question such
            exclusion on any ground, including the lack of any hearing before the decision to
            resort to such exclusion is taken. This undertaking is given freely and after obtaining
            independent legal advice.
      5.    Subject to full satisfaction of the Employer, the exclusion of Bidder/ Contractor could
            be revoked by the Employer if the Bidder/ Contractor can prove that he has restored/
            recouped the damage caused by him and has installed a suitable corruption
            prevention system in his organization.
      1.    If the Employer has disqualified the Bidder/ Contractor from the bidding process or
            has terminated the contract pursuant to Section 3, the Employer shall forfeit the
            Earnest Money Deposit/Bid Security, encash Contract Performance Bank
            Guarantees in addition to excluding the bidder from the future award process and
            terminating the contract.
                    Procurement of Biomass Pellets on FOR power station basis
                 for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                                Bidding Doc. No. CS‐0011‐112H‐9
                                                                                  Annexure – F10
                                                                                      Page 4 of 6
      2.     In addition to 1 above, the Employer shall be entitled to take recourse to the relevant
             provisions of the contract related to Termination of Contract due to Contractor's
             Default.
             Bidders are also advised to have a company code of conduct (clearly rejecting the
             use of bribes and other unethical behaviour) and a compliance program for the
             implementation of the code of conduct throughout the company.
      1.     The Employer will appoint competent and credible Independent External Monitor for
             this Pact. The task of the IEMs is to review independently and objectively, whether
             and to what extent the parties comply with the obligations under this agreement.
      2.     The IEMs are not subject to instructions by the representatives of the parties and
             performs his functions neutrally and independently. He shall report to CMD of the
             Employer or a person authorized by him.
      3.     The Bidder/Contractor accepts that the IEMs have the right to access without
             restriction to all Project documentations of the Employer including that provided by
             the Contractor. The Contractor will also grant the IEMs, upon his request and
             demonstration of a valid interest, unrestricted and unconditional access to his Project
             Documentations. The same is applicable to Subcontractors. The IEMs are under
             contractual obligation to treat the information and documents of the Bidder /
             Contractor / Sub-Contractors/ JV partners/Consortium member with confidentiality.
      3. The Employer will provide to the IEMs sufficient information about all meetings among
         the parties related to the Project provided such meetings could have an impact on the
         contractual relations between the Employer and the Contractor. The parties offer to the
         IEMs the option to participate in such meetings.
                   Procurement of Biomass Pellets on FOR power station basis
                for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                               Bidding Doc. No. CS‐0011‐112H‐9
                                                                                 Annexure – F10
                                                                                     Page 5 of 6
      6.    The IEMs will submit a written report to CMD of the Employer or a person authorized
            by him within 30 days from the date of reference or intimation to him by the Employer
            and, should the occasion arise, submit proposals for correcting problematic
            situations.
      7.    The Bidder / Contractor accepts that they shall not approach courts while the matter /
            complaint / dispute has been referred to the IEM in terms of this pact and they shall
            await IEM’s decision before approaching any Court.
      8.    If the IEMs have reported to CMD of the Employer or a person authorized by him a
            substantiated suspicion of an offence under relevant IPC/ PC Act, and he has not,
            within reasonable time, taken visible action to proceed against such offence or
            reported it to the Chief Vigilance Officer, the IEMs may also transmit this information
            directly to the Central Vigilance Commissioner, Government of India.
            This Pact comes into force from the date of signing by all the parties. It shall expire
            for the Contractor 12 months after the last payment under the respective Contract,
            and for all other unsuccessful bidders 6 months after the Contract has been awarded.
      1.    This Pact is subject to Indian Law. The place of performance and jurisdiction shall be
            New Delhi.
      2.    Should one or several provisions of this Pact turn out to be invalid; the remainder of
            this Pact remains valid. In this case, the parties will strive to come to an agreement
            to their original intentions.
      3.    The actions stipulated in this Integrity Pact are without prejudice to any other legal
            action that may follow in accordance with the provisions of the extant law in force
            relating to any civil or criminal proceedings.
              Procurement of Biomass Pellets on FOR power station basis
           for NTPC ‐ Mouda, Gadarwara and Khargone Power Plants (Lot 2)
                          Bidding Doc. No. CS‐0011‐112H‐9
                                                                           Annexure – F10
                                                                               Page 6 of 6
The Parties hereby sign this Integrity Pact at ……….on this ……. day of……..20….
Consortium member(s)
(As Applicable)