DUAZO Schedule Matrix

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views3 pages

DUAZO Schedule Matrix

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Appendix 4: WORK ASSIGNMENT AND SCHEDULE MATRIX FORM

Republic of the Philippines


UNIVERSITY OF EASTERN PHILIPPINES
University Town, Northern Samar
Web: http://uep.edu.ph; Email: uepnsofficial@gmail.com

COLLEGE OF ENGINEERING

PRACTICUM WORK ASSIGNMENT AND SCHEDULE MATRIX

Student’s/Trainee’s Name: CRIS T. CATARONGAN Date: July 06, 2023 to July 31, 2023

Week Monday Tuesday Wednesday Thursday Friday Saturday


1st Week
Orientation about
Interview, Interns’ the Logistics Office,
sorting and filling Sorting and Filling
Orientation
office documents, office Documents,
regarding Phimco
weighing the raw Encode RM
Industries Inc.
materials, Issuance, RM and
company’s rules
Familiarization with SP Processing PRS,
- - - and regulations,
Spare Parts, GS Issuance and
safety and training
encoding and RM MRR.
plan, plant tour
processing PRS, Logistics Office
Administration and Encode MRR (Inbound
Office,
Warehouse)
Maintenance Office Logistics Office
(Inbound
Warehouse)

2nd Week
Encode GS Encode GS Orientation Sorting and filing Orientation about Sorting and Filling
Issuance and GS Issuance and GS regarding documents Powerhouse, Office Documents,
Appendix 4: WORK ASSIGNMENT AND SCHEDULE MATRIX FORM

Purchasing Office
and Filling and
Measuring the
Sorting office specifically
actual Output Shaft
processing GS PRS Processing GS PRS documents from Company’s’ Discussing Boilers,
– KL 8826 using
their respective Voucher from and Powerhouse
Vanier Caliper,
Logistics Office Logistics Office usefulness, Listing, January 2022 to Boilers Tour
Drafting the Output
(Inbound (Inbound and Recording PRS December 2022
Shaft
Warehouse) Warehouse) with material price Powerhouse
Purchasing Office
Maintenance Office
Purchasing Office

3rd Week
Measuring the
Actual Spur Gear/
Gearwheel KE
Drawing 2D 13693 – 2 Using Observation in
Observation in
Drawing 2D AutoCAD Output Vanier Caliper, Milling Machine
Solid Works 3D
AutoCAD Output Shaft, Plotting Drafting, Drawing During Fabrication, Polishing Injector
application and 3D
Shaft – KL 8826 Drawing, Printing AutoCAD, Plotting Observation, and Needles using Sand
Printer, Drawing 3D
and Plotting Finished Drawing, Drawing, and Operating Paper
Solid Works and
Drawing and Checked by Observation and Automated Metal
Plotting Maintenance Office
SRD Operating Milling Hacksaw
Maintenance Office
Machine Technical Room
Maintenance Office Machine Shop
Maintenance
Office, Machine
Shop

4th Week
Observation in Polishing Injector Observation and Engraved our name Accomplishing Accomplishing
Milling Machine, Needles using Sand Operating Gear in Spur Gear, requirements, requirements,
Lathe Machine, Paper, Observation Hobber Machine, Observation in documents document and
Power Hacksaw, in Milling Machine Make Spur Gear, Shaper Machine, reports
Maintenance Office
Appendix 4: WORK ASSIGNMENT AND SCHEDULE MATRIX FORM

while fabricating Orientation and


Surface Grinder, Drafting, and
Timing Adjustment Interview by
Forklift Operating Layout the Flow
Superintended Maintenance Office
and Driving Maintenance Chart
Office, Machine Machine Shop,
Machine Shop Machine Shop
Shop Maintenance Office
5th Week
Plant tour and
accepting
Certificate of
Completion - - - - -

Manufacturing
Plant

________________________________________
Signature over Printed Name of Supervisor