                                   SECTION    2.   EARTHWORIs
I
&ca
SEC'TION 2. EARTHWORKS
) 2.1.r Description
                     This work shall consist of clcaring, grubbing and stripping topsoil in the areas
                     dcsignated hercuntler and,/or shown on the Drawings and/or directed by thc
                     S.OI and of clcaring only in othcr areas dcsignatcd hereunder and/or shorrn
                     on tirc Drawing..tiaToi directed by the S.O-, all as spccilied herein and as
                     required by thJS.O. The work shall also include the demolition and disposal
                     ofitructuris in said areas, except wherc otherwise provided for in the Contract,
                     as specified herein and as requircd by the S.O.
2.1.1.1 Clearing
                     Clearing shall consisr of the culting and/or taking down, removal and disposal
                     of everything above ground level, including objects overhanging thc arcas to
                     be cleaied such as tree branches, exccpt such trees, vegetation, structures or
                     rrarts of slruclures, and othcr things which are designated in the Contract to
                     iemain, or be removed by others, or which the S.O. directs arc to bc left
                     undisturbcd. Thc materiai to be clcared shall include but not necessarily be
                     limited to trces, stumps (parts above ground), lo!^s, brush, undcrgrowth, long
                     grassesr crops, ltnse vcgeiable matter and structures (cxcept thosc structures
                     ihose re.o"al or ctelrance is othcrwisc providcd for in the Contract).
                     Clcaring shall also include the levelling of obsolete dikcs, terraces, ditchcs, etc.,
                     unless otherwise dirccted by the S.O.
2.r.r.2 Grubbing
                     Grubbing shalt consist of thc removat and disposal o[ surface rregetation' thc
                     bases of- stumps, roots, the undcrground parts of structures, and other
                     obstructions to'a depth of at least 050 mctrc below ground level, all to the
                     satisfaction of the S.O.
                      The entire road reserve area shall be clearcd as described above,             unless
                      otherwise shown on the Drawings and/or directcd by the S.O.
                      Clearing shalt be carried out to thc cxtents deemed necessary and approved
                      or dircited by the S.O. in areas outside the road reserve wherc channel
                      excavation   ot other work is requircd'
                      In   arcas which are to be cleared only, and in which grubbing and stripping
                      toosoit arc.not required, the methods of work shall be such as will not utlduly
                      damage the surface Ycgetation and toPsoil, and carc shall bc takcn not to
                      disturb thc topsoil and thc root systems of grasses and othcr surfagg rcgJtalro-n.
                      No topsoil slitt Uc rcmovcd from such-arcas, cxoept as directed by the S-'O"
                      and any topsoil, grasscs and othcr surface vegetation othcrwisc removed or
                                                s2-   1
                                                                                    (JKR/SPI/1988)
                                                                                                     I
                                                                                                     I
                                                                                                     t
          disturbed shall be replaced and made good at the Contractor's own expensc,
          all to the satisfaction of the S.O.                                                        {
2.1.2.2   Areas To Be Cleared. Grubbed                                                                   I
          and Stsipped Of Topsoil
          Clearing, grubbing and stripping topsoil shall be canied out to the extents
          deemed necessary and approved or directed by the S.O. in areas both inside
          and outside the road rcserve where channel excavation or other work is
          required.
          Except wherc further excavation is rcquired, holes and cavities in the ground
          surface after clearing, gubbing and stripping topsoil shall be filled with
          materi4s similar to the adjacent ground, and such fill shall be compacted to
          a dry density similar to that of the sunounding material, all to the satisfaction
          of the S.O.
          This work shall be considered incidental to the work of clearing, grubbing and
          stripping topsoil, and shall not be measured for payment.
2.t.2.3 Topsoil-
2.1.2.4 Tlmber
          The Contractor shall have the right to use unsaleable timber (or saleable
          timber when permission is granted in writing by the appropriate Govemment
                                     s2- 2
                                                                                          (JKR/SPJ/re88)
    I
I
I
T                 agency or authority) for his own purPoses in connection with the Contract,
                  al-wap provided that he shall comply with the requirements of the S.O-
)       z.L.2S    Struclures
                  All   fences, buildings, structures, and encumbrancas of any character within the
                  limits of the road ieserve, except thosc to be removcd.by othcrs or dcsignated
                  to remain, shall be dcmolished and removed by the Contraclor'
                  Unwanted matcrial from clearing grubbing and stripping topsoil (including thc
                  demolition of structures) shall be disposed of as approved or dircded by the
                  s.o.
                   Should the clcaring grubbing and stripping of topsoil bc carricd out at a time
                                     -noi   p"t i-tted, thi Contllctgr lay pile. up combustible
                   *tr"n   Uorning is
                   materials witfiin the road reserrre outside the limits of the road works, and burn
                   il at a timc when   burning  is pcrrnitted.
                   where burning is not pcrmittcd at any time, or the. contractor clects not to
                   burn unwantei materiil, combustible material shall be disposed of togethcr
                   with incombustible material.
                                              s2- 3
                                                                                 (JKR/SPJ/1e88)
                                                                                                  1
                                                                                                  I
        EARTHWORKS
                                                                                                  I
2.2.1   Definitions                                                                                   I
(b) subgnidc
        Common excavation shall mean excavation in any materials which are not roc*
                                 as defrned in Sub-Sections Lz.l (t) and (g).
        or artificial hard materials
        (d)      Unsuitabk Materiab
iD any material
        Mate rials that are soft or unstable. merely bccause they arc too urct or too dry
        for effective compaction are not to be dassified as unsuitable, unless otbcrwisc
        classified by the S.O.
        Suitable materials shall mean those naterials other than thc unsuitablc
        materials defined in Sub-Section 2.2.1 (d) above.
(0 Rock
        Rock shall mean material found in ledges or massss ir its origind position
        which wou]d normally have to be loosened either by blasting or by pneumath
        tools or, if excavatcd by hand, by wedges and sledgc harnmcrs. Ii shalt not
        include material wtricb can be looscned with a track-typc tractor with mountcd
                                  s2- 4
                                                                                       (JKR/SPJ/1988)
             ii)'       Ripprng Unit ! Tbc rippcr to bc attachcd to thc tractor shdl bs tbc
                        niit  c-fricient pardlelogram tlpc lgcommcndcd by tlq lragor o!
                        ripper manufaaurcr. Ttc rippcr $all havc a singlc Ehanf in gpod
                        *bifing cooditioo witb sharpcned cutling Point.
             Bouldcrs or dctachcd piecas sball only bc rcggtdcd rs roc} ifthcy individudly
             cxcced 05 cubic metrc,
             Tbis shall mcan aoy hard artificial natcrial which *ould -rcqqirg $c-.u1 o!
             btasting or approrrcd pncumatic tools for its rcmoval but sbdl cxcludc individual
             masses lcss than      05 cubic mctrc.
             Tbe work shalt iocludc tbc cxcarration ofdl typc.s of malcrid, bacldilling
             conpacion formiru cnbanlmcnts aad slopcsr Gtc", as is ncccssary for the
                                         to ths formation lcrcls, in accordancc witb thc
             -r'plctio"'or tbc w-orts up
                                       shnpes and tl2ical cross- seaioru shown on thc
              tioe.r endc*, dimcnsioos,
              Drawingp and to thc approral of thc S.O.
              Tbe Contraclor shall provide ntcrc rcccssary tcmporaty wetcr coutscs' difchcsr
              atai"s.- pGpioC o. otic. rc"os of maintainiog tbc cartb*orls frcc from watcr'
              luO iiorlrio"-shall includc carrying out thc .*o.1 of forming thc cuttings and
              embankncats in suC,h a manncr that tf,Cir surfaccs harr at all tittrca a sunictcnt
              gradicnt to cnablc thcn to shcd satcr and prcwnt ponding
              In oumoiu out excavations end in thc lwtring of wrtcr tablcs thc Contractor
              .fril p"y duc rcgard to thc stability of alt strucurcs.
              -"*;;t-
              Adcquatc mcans for trapping silt shdl bc providcd oo aU tc4potry.Otf*g"
                                                       -nadc
                                              shall bc
                              Sioilar arranig;nfnts           for all carthworls includiry
              eircavations whcthcr for-pilc trenchcq foundations or ornings'
                  Slopcs ia cutting shall bc trimtncd mechanicalty to ncat and cvcn surfaccs which
                  J"if f.,"  gradients rot stceper lha' that shoym on thcDrawings W-klths of
                  cxcavationi statt oot cxcccdihc dimcnsions sho*r on thc Drawing by morc
                  than 3fl) mm, unlcss othcrwisc approrcd by thc S.O.
                                           s2- 5
                                                                                  (JKR/SPJl1e88)
                                                                                                   1
                                                                                                   t
2.2.3.2   Se9aration and Stockpiling
          of Suitable Material
          No excavated material shall bc rcmoved from the Site cxccpt on the dircction
          or with thc approval of tbe S.O. Should the Contractor bc permitted to rcmovc
          suitable materiils from the Site to suit his operational prcirdurc, then hc shall
          make good any cons€quent delicit of fill matcrial arising therefrom, ar his ourrr
          cxpense. Unless designated dump sites have bcen shown on the Drawings, the
          Contractor shall disposc of surplus suitablc material at bis own dump areas
          outsidc the Site as approved by the S.O.. In doing so, the Contractor shall
          comply with statutory requirements such ns payment of royalticg environmental
          protcction, etc.
          Unsuitable material shall bc cxcavated to such depth and over such arca as
          directed by thc S.O. and be transported and disposed of in an approrcd
          manner. Unless approval of the S,O. to dump and spread thc unsuitable
          materials within the Sitc is obtained, the Contractor shall be responsibtc for
          providing his own dump site for such unsuitable materials. The Contractor
          shall comply with statutory rcquirements such as payment of royaltieq
          enviroamental protcction, etc" Voids created dire to icmoval of unsiritablc
          matcrial shall bc backfilled with suitable material compactcd to a dry deosity
          not less than that of the surrounding matcrial or ihat specified for thi
          respective part of the earthworls or as dirccted by the S.O.
          lhe       may instruct the Contractor or the Contractor himself may elect to
              -S.O.
          obtain material for the Works by widening cuts. ln the lattcr case, the
          Contractor shall lirst reguest permission in writing from the S.O.
Widening of cuts shall oot be pcrmitted beyond the limits of the road rescrve.
                                  s2- 6
                                                                               (rKR/SPJ/1988)
                     63.0   mm
                     375    mm                            85-1m
                     20O Em                                0-m
                     10.0 mm                               0-5
Sand
                     10.0   mm
                      5.0   mm                            90-1m
                     1.18 nm                              45 - 8t)
                     3m uD                                r0-30
                      f50      utn                         2-10
        Whcrc tbc rocl is of satisfacory quality, the Contractor nay clcct to cnsh utd
        screcn it to producc aggregltcs iequired for concrete' roadbasc, subbasc' or
        othcr purpoi:s. Exctvated rocf necdcd for earthwork construdion whicl thc
        Cootrict6r elects so to usc for produciru sclcct naterialE sbdl bc'rcplaccd at
        the Contractot's om cxpcnsc dborrowof satisfactory qudity approved by tbc
        s.o.
        iil'       cxcavated roct sball trc brolen do*l to e marinum paniclc sizc of
                   150 mm, blendcd with suitablc carth fill matcrial in a propottion not
                   excccding I rock to 1 cartb and uscd as conmon lill.
        Thc C,ontraclor may only vastc cxcavatcd roct with thc approal of tb! S.O'
        Excavated roclr nccicd f6r carthworl construction whicb thc Cootraclor clects
        to wastc sball be replaccd at thc Contrartor's owu crpcuc by borrov of
        satisfadory qudity apprond by thc S.O.
                                     s2- ?
                                                                                    (JKR/SPJ/1e88)
           Thc slopes of cuttings shall be clcared of all rock frasments which move whcn
           prised.with a crow-bar. Where, in the slopes of cunirigs, laprs of rock and soft
           material altcrnate and the S.O. considers that the;6p;, immediately after
           dlelsing will not permanentty withstand the effec* of weitier, the Coniractor
           shall ercavate any. insecure material to an approvcd deph and build up thc
           rcsulting spaccs with- gra de L5P/N concretc   ii masonry-using rock simiiar to
           the adjoining natural rock so as to ensurc a solid face.'
                                   s2-   I
                                                                                     (JKR/SPJ/le8E)
2.L4.1 Matcrial
I             Frll matcrials for use in forming cnbanlmcnts shdl bc tho suitablc rnatcrial
              obtaincd from cxcavation il ctttings. Whcrc thc guantity of suclr matcrials is
              inadcquatc, tbc Contrador shdl obtain suitablc matcrials from thc designated
              borrow pits or fron his o*l borrow pits wtich havc bccn approvcd by thc S.O.
              All fill matcrials shall bc dcpcitcd in laycrs. Tbc loosc depth for each layrr
              of fill shall bc determined from the trid compaction. Each lapr shall erend
              oncr thc full width of tbc fill arca ald shdl bc cornpacted in accordancc with
              thc rcquiremcnts of SubScction 2.2.4.4. Each compactcd lapr shall be
              maintaincd at all tinrcs with a sufrrcicntly cven surface in order to drain away
              the surface watcr. '
2.2.4.4 Comtaction
(a)
                                       s2.9
                                                                          (JKR/SPJ/r!)88)
For compaclion of embankment slope, the Contractor may either extend each
comp?ctcd lapr bcyond the design slopc surfacc by at least 6(I) mm and thcn
trim bacllo the rcquired slope anglc, or hc may cmploy a tow t]?c roller to
compact the sloping surfacc,
The Contractor shall submit to the S,O. for his approval thc proposcd metbod
of compaction for cach nah typc of oaterial tobc used in ihc;nbankment.
This shall includc thc tpc of compaction plant for cach tlpc of matcrial and
tbc numbc{ of passas in relation to thc loose dcpth of matcrid to achicw
desired cotrpaction. Tte maxinulo conpaoed thidness for fill shatl be timitcd
to 3{X) mm unless othcrwisc approved by the S.O. Tba C.ontractor shall carry
                                                                                            {
out licld. compaction - trials, supplemented by     ary nccessary laboratory
                                                 -shall-
invrstigtions, as required by the S.O. This              bc donc 6y using tbi
proced- ures proposcdby thc Contractor for carthworks and shall satis$, th;S.O.
tlrat all thc spccificd rcquircmcnts rcgarding compaction can be ichicvcd.
Compac{ion trials with thc main tlpes of matcriat likely to bc cncountcrcd shalt
be complcted bcfore the works with the corresponding materials will bc allowed
to commenc€. Each trial area shall bc not smallet than 8 m x 15 m.
Thc wbole of thc embantmeot belorr the top 300 mm of thc subgrade shall bc
copp?d9d to aot less thai 90% (for cohesivc material)              ot   eSW 6or
cohesionlcss matcrial) of the maximum dry density determined in thc B.S. 137/
Compaction Tqst (45     lg   rammcr nethod).
Field density tests (m each layer of compactcd eafth fll shail bc carried out
tslnS thc srnd rcplaceoe-nt merhod il accordancq with B.S. l3Z or by using
othcr mcanr of tcsting of comparabtc aocuracy approved by thc S.O.        '      -
(e)     Mcisurt C-ontol
Each laytr of cgth IiU shall bc processed as necessary to bring its moisture
content to a uniform lenel throughout thc material, suitable foi compaction.
Tbc opimurn noisturc contert as dctermined by thc B.S. l3Z Compaction
Tcst (4.5 tB rareoer method) shall be uggd as-a gui& in derermining the
p-ro-per moisturc conlent at wlrich each soil type shall be compactcd. Watcr
shall bc added or ttc matcrial aerated ana i;ea to adjust'thc soil to the
proper
         loisure content to obtain the requiied dcnsity. A satisfactory mcthod
and sullicient equipmcnt as approvcd by the S.O, shalt be used for thc
furnishing and handling of water,
lf thc natural water @ntcnt of suitable materials is too high for the proper
compaction to be carried out, thc Contractor can cithei bring down ihc
moislurc contc't by aeration or drying or alternativety replace it frth suitable
                                                      -coet.
matcrials of compactablc moisturc rangc at his o*l
                        s2-r0
                                                                                (Jr(R/sPJ/1e88)
        lDcrc   sball bc a transition lalrr bctnpcn rod fill and canh fill or thc rop
        3(tr mo of sub*radc of at lcest
                                        j(I) mD conprcted thicbesc Thil shall cotrsist
        of uniforoly gradcd cnrsbcd rocl bct*ecn 6 nn and 150 nn u approvcd by
        thc S.O.
        PrioE to fcniry cnbanlrneot @lr soft ground' thc soil ovsr which fill natcrial
        $all bc placcd-shalt bcgiucn strcogtb improvcment trcatncnt as spccifrcdand
        to thc ddtails as sho*l on the Drawings oras dircccd or apporcd by rbc SiO:
        Trcelncnt by ocals of rcplaccmcnt ol unsuitablc material shall bc as speciEcd
        io SnbSqrins 223.4 ad 2235.
        Tbc   ffrtlarsr or layprs of fill matctials shall bc dcpositcd owr thc full width
        of ttc cnbintncoiam Ucrns in thichesscs and conpactcd as approrcd by
        thc S.O. Thc Contractor shall pronidc conpocion plant suitablc for *nrting
        orcr soft grond.
         Whcrc indicetcd in thc Coilract or dircacd by thc S.O' thc cmbantment sball
         bc btrilt todificrclt heigbts in $tag6with or without surchargC with allornrncc
         for cosolidatioo tinc pcriods in bctuern stagps' dl ia acoordalcc wirh tho
         Cootrrct Whcrc surcf,rrgc is spcdfic4 tho C.ontractor Ehdl bc
         for thc provision of surchargp nitcrial and thc rcnonl end dispocal of cxocss
         uarcriai on conphtion of consolidatioo or uficn ditcctcd by thc S'O.
                                    s2-11
                                                                                      (JKR/SPJ/1e88)
           the satisfaction of the   S.o.    Readily visible barriers shall be installed around
           each marker.
          Joint mcasurement of setttement shall bc taken weekly whitc fil is being placed
          in the vicinity of the markers. Tbereafter, readings inan ue taten fori;ichttv
          for a period.as directed by tbe S.O. The readinls shall be submirted o; ;
          approved printed form to be supplied by the Contractor.
          For the measurement of the volume that has settled below the original level
          of thc foundation of the embankment, the measured scttlcment of ealh marker
          shall bc used for volume computation following the nethod shown on the
          Drawings.
2.2.7 Suborade
          Material for rhe top 300 mm of subgrade shall have a minimum california
          Bcaring_Ratio (CB_R)
                                S shown on the Drawings when compactedtoglVo i
          thc maximum dry density determined in the B.S. 137l Compaction Test (45
          kg rammer method) under 4 days soaled condition.
          Throughout the   top^ 300 mm. of subgrade, the material shall be compacted to
          not.less than 9Svo,(foy cohesive material) or l00vo (for cohcsionless material)
          of thc maximum dry density determined in the B.S. i3Z Compaction Test (4.5
          kg rammer method).
          In c.u-l.arca, the
                             lop 300 rnm of the subgrade shail be scarilied and recompacted
          ro 95o/o (for colresive marerial)
                                            9r r6vo (for cohesionless material) of the
          ma:rimum dry density determined in the B.S. 1377 Compaction Tes[ (+,5 ks
          rammcr method). If the s.o. is fu[y satisfred that thc subgrade in its iaturi
          statc possesses a density exceeding the requirements, then thc surface of the
          subgrade shall be trimmed and rolled to obtain a smooth linish.
          wherc the material in cut area is found to be unsuitable for use in the too 300
          mm of subgrade it shall be removed and replaced with suitablc mate rial which
          shall be compactcd as indicated aborre.
i) Whcre rtxk surface exlends ovcr thc wholc width of the formation :-
                  Any voids or cavities more than 0.5 metre bclow the formation level
                  shall be filled up- with approved lcan concretc having T-day cube
                  slrcngrh greater than 7 N/sq.mm. The roct surface ihall tlen be
                  brought up-to the formation levcls with approved crushed rock or
                  gravcl, regulated and blinded.
                                     s2-12
                                                                                               (JTRAPJ/1S)
ii) Wbcrc rocl oulctop oosun owr plrt of ihc formatioo only r
                    Tbc roch outcroP Ehall bc c-rlt dowl b r lcrpl rct Lrl thu lD no
                    bclory thc forniioa l6.cl" Thc ulrhcc $dl tbcn bc b'r'ouglt up to
                    lcnel with 3uitabb subghdc Ettcshl
22.8.r   Ipp6oil
         TdDcoit stoc&Dilcd for thc Worts in accordanoc with Sub                Sccin 2'r.13 rld
         ti-t-.h"n t          sprcad and lightly cmpccod to         rl   crco   thicfsr of al nn
         .i-iitecJW oJ s.o. i! tc;                to bc   dfcd .!d/c rcc&4 c        urcd   I   tbc   s'o'
         .h"tt                dircct for trcc Planting      ud ahcr Putpoeca
                  "tb"ry,i"
\2.8.2   Turfmq
         Turtins sball bc cerdcd out rs sooo rs practicebls on r[ Glttb doPcs !trd otbcr
               & shown on.thc Drawingr md/or wtclc dinrtcd bt ttc S'O. ThG tnc
         "t*
         of turf shall bc as indicated            o
                                           thi Orewing or orhcr dtcrnatiw -t pc !3
                   Uy tt" S.O.     shdl bc frcG of trlteng !d c$cntidb frGG of rtrd&
                                       -a
         "peit"a
         TUrf shall bc obtaincd in unbrolcn sods wifh t tub6blfhl anornt oflopcoil
                                                                             fr9n          $i{
         -a rf"ff f. approrimatclv250 mm x250 nm ir sizc trd 1(X) mn
         ;;t-"d;i"cg                end   riall   bc   Plredh Fridolrs    soon ee   pracrioblc rftcr
         orlrin&
         Turf rods shdlbc sbc&cd rDd wltcrcd shcn ocy c|!m( bc lail inrnediatcly
         aftcr ortting
          ltc  surfaccs to bG turfcd shall bc trimrncd end thorouglly ctGttcd" Thc htrf
          ehall thcn bc carcfrrlly hid to form I couphro eld unifcn covcr rs sbo*r                     s
          th" Dr;*trG"        nrffiid on sbpa *ccpci tter I (ErticrD rnd 3 @odzmtd)
          shall bc ocired do*l with banb@ *alcs eppruimdcly 250 on t9 bngtht
          ApprorGil f;;lilisct shdt bc epplir:d aftcr Pl*itg of ttttf           .t s.it'blc tiocr rnd
          at retcs of application approred by tbc S.O.
          Alt hrrf 3ball bc rogulailywatcrcd rnd fcrtiliscd to thc retidaabn of tlc S'O'
          ootif   tt"                  odrfra-lty *trblishcd Any dcad turf shalt bc rcplaccd
          wilh ncw"rg.t"tloiir
                   turf at tho Contrador's        o*! agcnsc.
z2a3      Sccdim
                                          s2.13
                                                                                   (JKR/sPJ/1e88)
            grass and lcgunc are compatiblc with tbe              rcil in tbc   areas   to bc
            seeded;
iii)        tle   typcs ofgrass and legune (ifany) and straias ofsccd to bc usc4
            and thc     frncio!, root ald growth charaCcristics ofeach type;
i")         thc ratqr of application of thc gass and lcgurnc scc&;
vii) thc typc of mulch ro bc used and its method and ratc of application;
ix)         the.tlTc and anounts of binding agcnt to bc applied with the sccds,
            mulch, fcrtiliscr, ctc., as appropriatc.
xi)        thc equipment and.mahods to-bc uscd in preparing and ptacing the
           sceding mix and olher materials;
xii)       the cultivation    rld   aftcr-carc of thc seeded arcag including ratcs and
           frcqucncias       of   watering fcrtilising grass cutting and           general
           maintenancc for at lcast 1 ycar after seeding
xiii)      thc timc tfter sccding required for cstablishing permancn! densc
  .        growth of grasscg wtich will rcquirc ninimal niintcnancc;
s2-14