PROJECT COSTING SUMMARY
CLIENT NAME:
                                                          MROUND
     ITEM DESCRIPTION        TOTAL COST      MARK UP     TURNOVER
                                 MUR           %            MUR
NPK 14-0-20 COMPACTED AS BAS 49,835,638.28      0.00%   49,835,600.00
NPK 14-0-20 COMPACTED AS BAS    174,617.94      0.00%      174,600.00
                          -             -       0.00%              -
                          -             -       0.00%              -
                          -             -       0.00%              -
                          -             -       0.00%              -
                          -             -       0.00%              -
                          -             -       0.00%              -
                          -             -       0.00%              -
                          -             -       0.00%              -
                             50,010,256.23      0.00%   50,010,200.00
COROI MAURICE LTEE
DATE OF COSTING
       1 DEPARTMENT ORDERING
     1.1 DEPT NAME
       2 SUPPLIER DETAILS
     2.1 SUPPLIER NAME
       3 ORDER DETAILS
     3.1 COROI ORDER NO
     3.2 SUPPLIER DOCUMENT DETAILS
             A ORDER DOCUMENT DETAILS
             B FINAL ORDER DOCUMENT DETAILS
             C AMOUNT
     3.3 ORDER CURRENCY
     3.4 INCOTERM
     3.5 GROUPAGE
     3.6 DATE OF ARRIVAL
     3.7 DETAILS OF ORDER
             A MODE OF SHIPMENT
             B COSTS APPORTIONMENT
             C % DUTY
     3.8 FOREX
             A (LOSS)/SAVINGS ON FOREX RATE
             B DATE
             C SELLING RATE
             D RISK COEFF
             E COSTED RATE
     3.9 CHARGES
        A FOREIGN:
   A.1 PICK UP CHARGES
   A.2 CUSTOMS CLEARANCE
   A.3 SOLAS
   A.4 FOB CHARGES
   A.5 HAZARDOUS CHARGES
   A.5 SEA FREIGHT
       B1 LOCAL (FCY)
  B1.1 TERMINAL HANDLING CHARGE
  B1.2 GLOBAL FUEL SURCHARGE(GFS)
  B1.3 DOCUMENTATION FEE IMPORT
  B1.4 QUAY FEES(MPA)
       B2 LOCAL DUTIES(MUR)
B2.1                    CUSTOMS DUTY
       B3 LOCAL CHARGES(MUR)
  B3.1 SHORE CHARGES
       IMPORT CARGO COMMUNITY SYSTEM
  B3.2 FEE(MACCS/CCS FEE)
  B3.3 LANDING CHARGES IMPORT
  B3.4 DOCUMENTATION FEE
  B3.5 UNSTUFFING CHARGES(CFS)
  B3.6 TRANSMISSION FEE
           B3.7 COMMUNICATION COST
           B3.8 GAF(GENERAL ADMIN FEE)
           B3.9 AGENCY FEE
          B3.10 PROCESSING FEE
          B3.11 CLEARANCE FEE
          B3.12 FREIGHT COLLECTION FEE
          B3.13 BANK CHARGES
          B3.14 TRANSPORT COSTS
          B3.16 INSURANCE                                  Additional Cover %
                                                           Marine Rate
                                                           W&S Rate
                                                           FSC CHARGES
                                                           INSURANCE AMOUNT
                                                           MINIMUM RATE
       4 FORWARDER
     4.1 FORWARDER
       5 PRE COSTING                                       IJR2404
     5.1 GLOBAL COSTING
                                                                  COSTS PAID IN FX
                          SUPPLIER'S INVOICE
                                                                     A - FOREIGN FREIGHT
                                  USD                                       USD
  PRE
COSTING
                                               20,000.00                               3,600.00
                                               20,000.00                               3,600.00
                                                      -                                      -
 MUR                                      Rs919,790.00                             Rs165,562.20
     5.2 LINE COSTING
         PURCHASE ORDER PART
                          STOCK ITEM CODE                        ITEM DESCRIPTION
              AGFECHNP129                                NPK 14-0-20 COMPACTED AS BASED
              AGFECHNP130                                NPK 14-0-20 COMPACTED AS BASED
  PRE
COSTING
              TOTAL
       6 FINAL COSTING
     6.1 FINAL GLOBAL COSTING
                                                               COSTS PAID IN FX
                        SUPPLIER'S INVOICE
                                                                A - FOREIGN FREIGHT
                                USD                                    USD
 FINAL
COSTING
                                             20,000.00                                  0.00
                                             20,000.00                                  0.00
                                                    -                                     -
 MUR                                    Rs893,600.00                                  Rs0.00
     6.2 FINAL LINE COSTING
         PURCHASE ORDER PART
                          STOCK ITEM CODE                        ITEM DESCRIPTION
              AGFECHNP129                              NPK 14-0-20 COMPACTED AS BASED
              AGFECHNP130                              NPK 14-0-20 COMPACTED AS BASED
                                                  0.00                             0.00
 FINAL
COSTING                                           0.00                             0.00
                                                  0.00                             0.00
 FINAL
COSTING
                  0.00   0.00
                  0.00   0.00
                  0.00   0.00
                  0.00   0.00
                  0.00   0.00
          TOTAL
                  PRE COSTING STAGE
                                      AGR
                           HEXTAR FERT SDN BHD
                                     12042
      PRO FORMA        121240
       INVOICE
                              20,000.00
                        USD
                      EXWORKS
                         NO
                     SEA FREIGHT
                                  WEIGHT
                     TO BE INSERTED ON A PER LINE BASIS
USD                                45.99
                                     2.85%
                                44.6500
                                   3.00%
                                45.9895
USD
USD
USD
USD
USD
USD                      3,600.00
USD
USD                      3,600.00
USD                       408.00
USD                       165.00
USD                       240.00
USD
USD
USD                       813.00
            LOCAL DUTY TO BE INSERTED MANUALLY AS P
      MUR   LINE ITEM. ONLY TOTAL TO RECOGNISE BELO
MUR                      1,400.00
MUR
MUR                      9,150.00
MUR
MUR
MUR
MUR
MUR
MUR                                                                   1,400.00
MUR
MUR
MUR
MUR
MUR                                                                  33,000.00
MUR                                                                  44,950.00
                   10.0000%                                           10.0000%
                    0.1375%                                            0.1375%
                    0.0000%                                            0.0000%
                                                                       0.3500%
                                                                     Rs1,715.57
                                                                        250.00
                                                                     SPEEDFREIGHT LTD
                                                                            COSTS PAID IN MUR
                               B1 - LOCAL CHARGES
      C&F VALUE                                       B2 - LOCAL DUTIES (MUR)
                                       (FCY)
        USD                           USD                      MUR
                                            813.00
                  23,600.00                 813.00
                                                -
              Rs1,085,352.20            Rs37,389.46                     Rs0.00
                                  Unit of Measure                 QUANTITY
Specific Remarks for Line
          Notes
                                                               UNITS/PACKETS
                               EACH                                          3,000.00
                               EACH                                             25.00
                               EACH
                               EACH
                               EACH
                               EACH
                               EACH
                               EACH
                               EACH
                               EACH
                                                                          3,025.00
                                                                                  COSTS PAID IN MUR
                                B1 - LOCAL CHARGES
       C&F VALUE                                           B2 - LOCAL DUTIES (MUR)
                                        (FCY)
          USD                          USD                          MUR
                   20,000.00                        0.00
                                                      -
                Rs893,600.00                   Rs0.00                         Rs0.00
                                  Unit of Measure                 QUANTITY
Specific Remarks for Line
          Notes
                                                               UNITS/PACKETS
                            0 EACH                                              3000
                            0 EACH                                                25
                            0 EACH                                                 0
                            0 EACH                                                 0
                            0 EACH                                                 0
0 EACH                0
0 EACH                0
0 EACH                0
0 EACH                0
0 EACH                0
         0.00   3,025.00
             FINAL COSTING STAGE                         Drop Down List
                 08.01.2023
                                                         Manually Inserted
                                                         Not To Change
       AGR
EXTAR FERT SDN BHD
      12042
                  C121515
                           20,000.00
                     USD                   CORRECT
                  EXWORKS                  CORRECT
                     NO
                 SEA FREIGHT
     WEIGHT
SERTED ON A PER LINE BASIS
                              44.68
      2.85%                            A -VE SIGN = DEPRECIATION OF THE RUPEE TO THE DETRIMENT OF COROI
                             44.6800 To paste Copy Rate of MCB
                             44.6800
                                 #DIV/0!
                                 #DIV/0!
                                 #DIV/0!
                                 #DIV/0!
                                 #DIV/0!
                                 -100.00%
                                 #DIV/0!
                            -    -100.00%
                                 -100.00%
                                 -100.00%
                                 -100.00%
                                 #DIV/0!
                                 #DIV/0!
                            -    -100.00%
O BE INSERTED MANUALLY AS PER
NLY TOTAL TO RECOGNISE BELOW
                                 #DIV/0!
                                 #DIV/0!
                                 -100.00%
                        650.00   #DIV/0!
                      9,150.00    0.00%
                     12,000.00   #DIV/0!
                                 #DIV/0!
                                 #DIV/0!
                                        #DIV/0!
                                        #DIV/0!
                         1,400.00        0.00%
                                        #DIV/0!
                      60,000.00         #DIV/0!
                     185,000.00         #DIV/0!
                                        #DIV/0!
                      33,000.00          0.00%
                                        #DIV/0!
                     301,200.00         570.08%
                         2,250.00
SPEEDFREIGHT LTD
      COSTS PAID IN MUR
          B3 - LOCAL CHARGES        SUB TOTAL BEFORE
                                                         INSURANCE        TOTAL COST
                 (MUR)                 INSURANCE
                   MUR                    MUR              MUR                MUR
                    Rs44,950.00         Rs1,167,691.66       Rs1,715.57      Rs1,169,407.23
                                                                          Total Checked
                                                   Unit Price        TOTAL VALUE
         VOLUME                  WEIGHT
           LTRS              GRAMMS/KGS/TONS         USD                 USD
                                          50.00             360.00        1,080,000.00
                                          25.00              80.00             2,000.00
                                                                                     -
                                                                                     -
                                                                                     -
                                                                                     -
                                                                                     -
                                                                                     -
                                                                                     -
                                                                                     -
                   0.00                   75.00            440.00        1,082,000.00
                                                                         Error
COSTS PAID IN MUR
    B3 - LOCAL CHARGES       SUB TOTAL BEFORE
                                                  INSURANCE          TOTAL COST
           (MUR)                INSURANCE
          MUR                      MUR               MUR                 MUR
            Rs301,200.00         Rs1,194,800.00        Rs2,250.00       Rs1,197,050.00
                                                                     Total Checked
                                                   Unit Price           TOTAL
         VOLUME                  WEIGHT
           LTRS              GRAMMS/KGS/TONS         USD                 USD
                         0                  50             360.00        1,080,000.00
                         0                  25              80.00            2,000.00
                         0                   0                  -                  -
                         0                   0                  -                  -
                         0                   0                  -                  -
  0        0       -             -
  0        0       -             -
  0        0       -             -
  0        0       -             -
  0        0       -             -
0.00   75.00   440.00   1,082,000.00
                        Error
IMENT OF COROI
Error
A - FOREIGN FREIGHT          TOTAL C&F VALUE
                                                      B1 - LOCAL CHARGES
                                                              (FCY)
       USD               USD             MUR                MUR
          2,400.00    1,082,400.00    49,779,034.80           24,926.31
          1,200.00        3,200.00       147,166.40           12,463.15
                 -              -                -                    -
                 -              -                -                    -
                 -              -                -                    -
                 -              -                -                    -
                 -              -                -                    -
                 -              -                -                    -
                 -              -                -                    -
                 -              -                -                    -
           3,600.00   1,085,600.00    49,926,201.20            37,389.46
    Reconciled           Error            Error           Reconciled
       Error
A - FOREIGN FREIGHT          TOTAL C&F VALUE
                                                      B1 - LOCAL CHARGES
                                                              (FCY)
       USD               USD             MUR                MUR
                  -   1,080,000.00    48,254,400.00                  -
                  -     2,000.00          89,360.00                  -
                  -       0.00                 0.00                  -
                  -       0.00                 0.00                  -
                  -       0.00                 0.00                  -
              -       0.00                  0.00                 -
              -       0.00                  0.00                 -
              -       0.00                  0.00                 -
              -       0.00                  0.00                 -
              -       0.00                  0.00                 -
             0.00   1,082,000.00   48,343,760.00                0.00
Reconciled             Error          Error        Reconciled
                                             SUB TOTAL
                             B3 - LOCAL
B2 - LOCAL DUTIES                             BEFORE         INSURANCE
                           CHARGES (MUR)
                                            INSURANCE
%             MUR              MUR                             MUR
                                                MUR
0%                             29,966.67    49,833,927.78        1,710.51
0%                             14,983.33       174,612.89             5.06
0%                                      -             0.00              -
0%                                      -             0.00              -
0%                                      -             0.00              -
0%                                      -             0.00              -
0%                                      -             0.00              -
0%                                      -             0.00              -
0%                                      -             0.00              -
0%                                      -             0.00              -
                    0.00        44,950.00   50,008,540.66         1,715.57
           Reconciled        Reconciled         Error        Reconciled
                                             SUB TOTAL
                             B3 - LOCAL
B2 - LOCAL DUTIES                             BEFORE         INSURANCE
                           CHARGES (MUR)
                                            INSURANCE
%             MUR              MUR                             MUR
                                                MUR
0%                            200,800.00    48,455,200.00        2,245.84
0%                            100,400.00       189,760.00            4.16
0%                                    -              0.00              -
0%                                    -              0.00              -
0%                                    -              0.00              -
0%                                   -            0.00                   -
0%                                   -            0.00                   -
0%                                   -            0.00                   -
0%                                   -            0.00                   -
0%                                   -            0.00                   -
     0.00            0.00   301,200.00   48,644,960.00       2,250.00
            Reconciled      Reconciled       Error          Reconciled
                                                                303,450.00
                                                         6791.62936436885
TOTAL COST        COST PER UNIT OF SALES          VAT TYPE
               BASIS OF
  MUR                              MUR
               MEASURE
49,835,638.28 QUANTITY              16,611.88 TAXABLE - 15%
   174,617.94 QUANTITY               6,984.72 TAXABLE - 15%
         0.00                            #N/A
         0.00                            #N/A
         0.00                            #N/A
         0.00                            #N/A
         0.00                            #N/A
         0.00                            #N/A
         0.00                            #N/A
         0.00                            #N/A
50,010,256.23
   Error
TOTAL COST        COST PER UNIT OF SALES          VAT TYPE
               BASIS OF
  MUR                              MUR
               MEASURE
48,457,445.84 QUANTITY              16,152.48
   189,764.16 QUANTITY               7,590.57
         0.00                            #N/A
         0.00                            #N/A
         0.00                            #N/A
          0.00   #N/A
          0.00   #N/A
          0.00   #N/A
          0.00   #N/A
          0.00   #N/A
48,647,210.00
    Error
MARK UP        SELLING PRICE PER UNIT OF
                      MEASURE
  %
                MUR      ROUNDED
               24,700.00  24,700.00
                6,984.72   7,000.00
                    #N/A       #N/A
                    #N/A       #N/A
                    #N/A       #N/A
                    #N/A       #N/A
                    #N/A       #N/A
                    #N/A       #N/A
                    #N/A       #N/A
                    #N/A       #N/A
MARK UP        SELLING PRICE PER UNIT OF   MARK UP
                      MEASURE              VAR %
  %
                 MUR
                            ROUNDED
      52.92%   24,700.00     24,700.00 #DIV/0!
      -7.98%    6,984.72      7,000.00 #DIV/0!
        #N/A        #N/A          #N/A
        #N/A        #N/A          #N/A
        #N/A        #N/A          #N/A
#N/A   #N/A   #N/A
#N/A   #N/A   #N/A
#N/A   #N/A   #N/A
#N/A   #N/A   #N/A
#N/A   #N/A   #N/A
COPY QUOTE.ETC
1 DEPARTMENTS
  AGR
  CHE
  CHR
  CLN
  PES
  SCHR
  SGAR
  SCLN
2 INCOTERMS
  EXWORKS
  FCA        Rehaz to
  FOB         insert
  CFR       definitions
  CIF
3 FOREX
  USD
  SEK
  RND
  MUR
  JPY
  EUR
4 % DUTY
            0%
            5%
           10%
           15%
           30%
5 INVOICE
  N/A
  QUOTATION
  PRO FORMA
6 MODE OF SHIPMENT
  SEA FREIGHT
  AIR FREIGHT
  COURRIER
7 GROUPAGE
  YES
 NO
8 UNIT OF MEASURE
  LTRS
  EACH
  TONS
  GRAMMS
  PACKETS
  KGS
6 COSTS APPORTIONMENT
  VALUE
  QUANTITY
  VOLUME
  WEIGHT
7 BASIS OF UNIT CALCULATION
  QUANTITY
  VOLUME
  WEIGHT
8 VAT TYPE
  TAXABLE - 15%
  ZERO RATED - 0%
  EXEMPT
                            EXWORKS                              FCA
                    Is an international trade   The Free Carrier (FCA) Incoterms
                    term that describes         2020 Rule pushes the responsibility
                    when a seller makes a       of delivering the goods to the buyers
                    product available at a      nominated premises onto the seller,
                    designated location, and    so they have to organise shipping
                    the buyer of the product    and various export documents,
Definition          must cover all costs        contrary to Ex Works.
                    from warehouse to
                    warehouse
                    All overseas costs from     All overseas & local costs, duties &
COSTS TO CONSIDER   supplier's warehouse to     taxes (except transport from
OVER AND ABOVE      buyer's warehouse+all       Supplier's warehouse till our
SUPPLIERS           local charges including     nominated FFWDR)
QUOTE/INVOICE       duties & taxes
                                                 GROUP 1= Incoterms that apply to any mode of transpo
         CPT                        CIP                                   DAT
Incoterms CPT is      In Carriage and Insurance Delivered At Terminal means, that the
short for "Carriage Paid To (CIP), the seller       seller of a product delivers it to a previously
Paid To." Under CPT assumes all risk until the      specified terminal. Until then he has to
incoterm , the seller goods are delivered to the    shoulder the full costs and the risk of
clears the goods and first carrier at the place of  transport. The means of transport are not
arranges carriage to shipment—not the place of      specified by DAT. "Terminal" describes the
the named place of destination. Once the goods destination that buyer and seller must agree
destination.          are delivered to the first    upon. That can be not only an airfreight
                      carrier, the buyer is         terminal, but a train terminal, a wharf or a
                      responsible for all risks.    warehouse as well.
Local charges,     Local charges, duties & taxes Freight-Local charges, duties & taxes
duties & taxes
ny mode of transport
                        DAP                                 DDP
         Under the Delivered At           DDP Incoterms® (or Delivered Duty
         Place (DAP) Incoterms rules, Paid shipping) means that the seller
         the seller is responsible for    bears all the costs and risks involved
         delivery of the goods, ready for in bringing the goods to the place of
         unloading, at the named place destination and has an obligation to
         of destination. The seller       clear the goods not only for export
         assumes all risks involved up but also for import, to pay any duty
         to unloading. Unloading is at    for both export and import and to
         the buyer's risk and cost.       carry out all customs ...
         Local charges                   None
                FOB                   CFR   CIF
“Free on board” is what FOB
stands for. It is a designation
which indicated that the liability
and ownership of the goods
have been transferred from a
seller to a buyer. This means
that if the goods get damaged
or destroyed during the
shipping, the seller is not liable.
Freight & local charges