0% found this document useful (0 votes)
27 views2 pages

12 Resource Details

The document lists various resources along with their IDs, names, primary roles, and default units of measurement for usage. Resources include equipment like drill machines and pumps, as well as personnel such as engineers and workers. Each resource has a specified daily usage rate, indicating the quantity or time allocated for each resource per day.

Uploaded by

chill Gossips
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views2 pages

12 Resource Details

The document lists various resources along with their IDs, names, primary roles, and default units of measurement for usage. Resources include equipment like drill machines and pumps, as well as personnel such as engineers and workers. Each resource has a specified daily usage rate, indicating the quantity or time allocated for each resource per day.

Uploaded by

chill Gossips
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

RS-01 Resource Details

Resource ID Resource Name Primary Role Default Units /


Time

PR01 Birsa Temple 1Day/Day


R-27 Grouting Injector 1Day/Day
R-26 Drill Machine 1Day/Day
R-25 Pump 1Day/Day
R-24 LED light 8un/Day
R-23 Reinforcement 8tons/Day
R-22 Stone dust 8m3/Day
R-20 Ceiling Fan 8un/Day
R-19 Metal Box 8un/Day
R-18 Aluminium Wire 8m/Day
R-17 GI Pipe 8m/Day
R-16 Nayak Junior Engineer 1Day/Day
R-14 Distemper 8kg/Day
R-13 Putty 8kg/Day
R-12 Magan Workers 1Day/Day
R-11 Pritam Workers 1Day/Day
R-10 Ramlal Workers 1Day/Day
R-9 Arnav Mehta Assistant General Manager 1Day/Day
R Cement 8bags/Day
R-21 Aggregate 8tons/Day
R-1 MS Sheet 8tons/Day
R-15 MS Grill 8tons/Day
R-2 Brick 8No/Day
R-3 Sand 8m3/Day
R-4 Amit Kr Raut Assistant manager 1Day/Day
R-5 Excavator 1Day/Day
R-6 Rohan Supervisors 1Day/Day

© Primavera Systems, Inc. Page 1 of 2


RS-01 Resource Details

Resource ID Resource Name Primary Role Default Units /


Time

R-7 Paint 8l/Day


R-8 Sobhit Supervisors 1Day/Day

Total ---

© Primavera Systems, Inc. Page 2 of 2

You might also like