0% found this document useful (0 votes)
28 views46 pages

Engineering 2.0

The document outlines the engineering schedule for various tasks and personnel across different days of the week, detailing shifts for mechanics, electricians, and other specialists. It includes a daily program with specific tasks, locations, and time allocations, as well as checklists for time-consuming activities. The schedule is structured to ensure efficient management of resources and tasks throughout the week.

Uploaded by

neno309
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views46 pages

Engineering 2.0

The document outlines the engineering schedule for various tasks and personnel across different days of the week, detailing shifts for mechanics, electricians, and other specialists. It includes a daily program with specific tasks, locations, and time allocations, as well as checklists for time-consuming activities. The schedule is structured to ensure efficient management of resources and tasks throughout the week.

Uploaded by

neno309
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 46

Engineering

Schedule
Monday Tuesday Wednesday Thursday

AM 2 2 2 2
PM 1 1 2 1
Night 1 1 1 1

Mid-Shift 1 1 1 1

5 5 6 5

Chief 1 1 1 1
Sup. (Mechanic) 1 1
Mechanic 1 1 1 1
Plumber 1 1
Electrician 1 1 1
Carpenter 1 1
Telemont 1 1 1 1

5 5 6 5

Chief MID MID MID MID


Sup. (Mechanic) PM PM
Mechanic AM AM AM AM
Plumber PM PM
Electrician PM PM Night Night
Carpenter Night Night
Telemont AM AM AM AM

5 5 6 6

Monday Tuesday Wednesday Thursday


AM 2 4 4 4
PM 0 0 0 0
Night 0 0 0 0

Mid-Shift 0 0 0 0

Landscaper 1 1 1 1
Gardener 1 1 1
Gardener 1 1 1
Gardener 1 1 1 1

2 4 4 4

Landscaper AM AM AM AM
Gardener AM AM AM
Gardener AM AM AM
Gardener AM AM AM AM

2 4 4 4

Monday Tuesday Wednesday Thursday


7 9 10 10
Friday Saturday Sunday

2 1 1 12
2 1 1 9
1 1 1 7

1 1 1 7

6 4 4

1 5
1 1 1 5
1 5
1 1 1 5
1 1 5
1 1 1 5
1 5

6 4 4

MID
PM MID MID
AM
PM AM AM
PM
Night Night Night
AM

6 3 4

Friday Saturday Sunday


4 2 0
0 0 0
0 0 0

0 0 0

1
1 1
1 1
1

4 2 0

AM
AM AM
AM AM
AM

4 2 0

Friday Saturday Sunday


10 5 4
Engineering
Daily Program

Task

START

Take Robot from Pool

Detailed Check Sea Water Pump


Detailed Check Water Maker
Detailed Fresh Water Pumps
Detailed Htydrant Pumps
Detailed Sprinkler System

Black Barrel
WWS Plant
Compressor
Grease Separator

Chemicals
Measurements
Cleaning Systems

BREAK

KK1
KK2
KK3
KK5
KK4
MultiSplit System

Buffer (Extra Time)


FINISH

START

Visual Check Sea Water Pump


Visual Check Water Maker
Visual Check Generator
Visual Fresh Water Pumps
Visual Htydrant Pumps
Visual Sprinkler System
Visual Check Kitchen Boiler

Visual Check Black Barrel


Visual Check WWS Plant
Visual Check Compressor
Visual Check Grease Separator

Visual Check Chemicals


Visual Check Measurements
Visual Check Cleaning Systems

Steam Room
Check Walk-In Fridges
Visual Check Kitchen Hood

WEEKLY TASK

BREAK

Check Buggies (Batteries + Tiers + Connec


Install Tripo on the Pier

WEEKLY TASK

Buffer (Extra Time)

FINISH

START
Put Robot in Pool

Deep Clean WorkShop


Deep Clean Pool Pump Room
Deep Clean AirCon Room
Deep Clean Pump Room
Deep Clean Pool Pits
Deep Clean KK4 Room
Deep Clean Water Maker
Deep Clean Outside Water Maker

Charging of all Buggies


Clean Parking Area (only buggies and teleh

BREAK

Clean and organize tools


Daily Inventory
Prepare list of used materials that day

WEEKLY TASK

MONTHLY TASK

Buffer (Extra Time)

FINISH
Monday

Location Shift Speciality Hour (Starting/ Finishng)

6:30

6:30

Beach AM Mechanic + Electrician 6:55


Staff House AM Mechanic + Electrician
Pump Room AM Mechanic + Electrician
Pump Room AM Mechanic + Electrician
Pump Room AM Mechanic + Electrician 8:40

Staff House AM Mechanic + Electrician 8:40


Staff House AM Mechanic + Electrician
Staff House AM Mechanic + Electrician
Gym+ Economical Entrance AM Mechanic + Electrician 10:15

Pool Pump Room AM Mechanic + Electrician 10:15


Pool Pump Room AM Mechanic + Electrician
Pool Pump Room AM Mechanic + Electrician 11:30

Canteen AM Mechanic + Electrician

Pool Deck Pit + AIRCON Room AM Mechanic + Electrician 12:00


Pool Deck Pit + AIRCON Room AM Mechanic + Electrician
Pool Deck Pit + AIRCON Room AM Mechanic + Electrician
Kamena AM Mechanic + Electrician
BOH Atrium AM Mechanic + Electrician
Top of Staff House AM Mechanic + Electrician 14:15
14:30

14:30

Beach PM Electrician 14:30


Staff House PM Electrician
Staff House PM Electrician
Pump Room PM Electrician
Pump Room PM Electrician
Pump Room PM Electrician
Pump Room PM Electrician 15:15

Staff House PM Electrician 15:15


Staff House PM Electrician
Staff House PM Electrician
Gym+ Economical Entrance PM Electrician 15:35

Pool Pump Room PM Electrician 15:35


Pool Pump Room PM Electrician
Pool Pump Room PM Electrician 15:50

Atrium PM Electrician 15:50


Main Kitchen PM Electrician
Kitchen Ramp PM Electrician 16:30

Canteen PM Electrician

Staff House PM Electrician 19:15


Pier PM Electrician 20:00

22:30

22:30
Pool Night Carpenter 22:30

WorkShop Night Carpenter 22:55


Pool Pump Room Night Carpenter
AirCon Room Night Carpenter
Pump Room Night Carpenter
Pool Deck Night Carpenter
BOH Atrium Night Carpenter
Staff House Night Carpenter
Staff House Night Carpenter 0:55

Staff House Night Carpenter 0:55


Staff House Night Carpenter 1:55

Canteen Night Carpenter

WorkShop Night Carpenter 2:25


WorkShop Night Carpenter
WorkShop Night Carpenter 3:40

6:30
Time Consuming To Do

0:25

0:45 Checklist
0:30 Checklist
0:10 Checklist
0:10 Checklist
0:10 Checklist

0:15 Checklist
0:45 Checklist
0:15 Checklist
0:20 Checklist

0:30 Checklist
0:30 Checklist
0:15 Checklist

0:30

0:15 Checklist
0:15 Checklist
0:15 Checklist
0:15 Checklist
0:15 Checklist
1:00 Checklist

0:15
8:00

0:05 Checklist
0:05 Checklist
0:15 Checklist
0:05 Checklist
0:05 Checklist
0:05 Checklist
0:05 Checklist

0:05 Checklist
0:05 Checklist
0:05 Checklist
0:05 Checklist

0:05 Checklist
0:05 Checklist
0:05 Checklist

0:10 Checklist
0:15 Checklist
0:15 Checklist

2:15

0:30

0:25
0:20

2:15

0:15

8:00
0:25 Checklist

0:15 Checklist
0:15 Checklist
0:15 Checklist
0:15 Checklist
0:15 Checklist
0:15 Checklist
0:15 Checklist
0:15 Checklist

0:20 Checklist
0:40 Checklist

0:30

0:30 Checklist
0:30 Checklist
0:15 Checklist

0:00

2:35

0:15

8:00
TUESDAY

Task Location Shift

START

Take Robot from Pool

Detailed Check Sea Water Pump Beach AM


Detailed Check Water Maker Staff House AM
Detailed Fresh Water Pumps Pump Room AM
Detailed Htydrant Pumps Pump Room AM
Detailed Sprinkler System Pump Room AM

Black Barrel Staff House AM


WWS Plant Staff House AM
Compressor Staff House AM
Grease Separator Gym+ Economical Entrance AM

Chemicals Pool Pump Room AM


Measurements Pool Pump Room AM
Cleaning Systems Pool Pump Room AM

BREAK Canteen AM

KK1 Pool Deck Pit + AIRCON Room AM


KK2 Pool Deck Pit + AIRCON Room AM
KK3 Pool Deck Pit + AIRCON Room AM
KK5 Kamena AM
KK4 BOH Atrium AM
MultiSplit System Top of Staff House AM

Buffer (Extra Time)


FINISH

START

Visual Check Sea Water Pump Beach PM


Visual Check Water Maker Staff House PM
Visual Check Generator Staff House PM
Visual Fresh Water Pumps Pump Room PM
Visual Htydrant Pumps Pump Room PM
Visual Sprinkler System Pump Room PM
Visual Check Kitchen Boiler Pump Room PM

Visual Check Black Barrel Staff House PM


Visual Check WWS Plant Staff House PM
Visual Check Compressor Staff House PM
Visual Check Grease Separator Gym+ Economical Entrance PM

Visual Check Chemicals Pool Pump Room PM


Visual Check Measurements Pool Pump Room PM
Visual Check Cleaning Systems Pool Pump Room PM

Steam Room Atrium PM


Check Walk-In Fridges Main Kitchen PM
Visual Check Kitchen Hood Kitchen Ramp PM

WEEKLY TASK

BREAK Canteen PM

Check Buggies (Batteries + Tiers + Connec Staff House PM


Install Tripo on the Pier Pier PM

WEEKLY TASK

Buffer (Extra Time)

FINISH

START
Put Robot in Pool Pool Night

Deep Clean WorkShop WorkShop Night


Deep Clean Pool Pump Room Pool Pump Room Night
Deep Clean AirCon Room AirCon Room Night
Deep Clean Pump Room Pump Room Night
Deep Clean Pool Pits Pool Deck Night
Deep Clean KK4 Room BOH Atrium Night
Deep Clean Water Maker Staff House Night
Deep Clean Outside Water Maker Staff House Night

Charging of all Buggies Staff House Night


Clean Parking Area (only buggies and teleh Staff House Night

BREAK Canteen Night

Clean and organize tools WorkShop Night


Daily Inventory WorkShop Night
Prepare list of used materials that day WorkShop Night

WEEKLY TASK

MONTHLY TASK

Buffer (Extra Time)

FINISH
ESDAY

Speciality Hour (Starting/ Finishng)


Time Consuming To Do

6:30

6:30 0:25

Mechanic + Electrician 6:55 0:45 Checklist


Mechanic + Electrician 0:30 Checklist
Mechanic + Electrician 0:10 Checklist
Mechanic + Electrician 0:10 Checklist
Mechanic + Electrician 8:40 0:10 Checklist

Mechanic + Electrician 8:40 0:15 Checklist


Mechanic + Electrician 0:45 Checklist
Mechanic + Electrician 0:15 Checklist
Mechanic + Electrician 10:15 0:20 Checklist

Mechanic + Electrician 10:15 0:30 Checklist


Mechanic + Electrician 0:30 Checklist
Mechanic + Electrician 11:30 0:15 Checklist

Mechanic + Electrician 0:30

Mechanic + Electrician 12:00 0:15 Checklist


Mechanic + Electrician 0:15 Checklist
Mechanic + Electrician 0:15 Checklist
Mechanic + Electrician 0:15 Checklist
Mechanic + Electrician 0:15 Checklist
Mechanic + Electrician 14:15 1:00 Checklist

0:15
14:30 8:00

14:30

Electrician 14:30 0:05 Checklist


Electrician 0:05 Checklist
Electrician 0:15 Checklist
Electrician 0:05 Checklist
Electrician 0:05 Checklist
Electrician 0:05 Checklist
Electrician 15:15 0:05 Checklist

Electrician 15:15 0:05 Checklist


Electrician 0:05 Checklist
Electrician 0:05 Checklist
Electrician 15:35 0:05 Checklist

Electrician 15:35 0:05 Checklist


Electrician 0:05 Checklist
Electrician 15:50 0:05 Checklist

Electrician 15:50 0:10 Checklist


Electrician 0:15 Checklist
Electrician 16:30 0:15 Checklist

2:15

Electrician 0:30

Electrician 19:15 0:25


Electrician 20:00 0:20

2:15

0:15

22:30 8:00

22:30
Carpenter 22:30 0:25 Checklist

Carpenter 22:55 0:15 Checklist


Carpenter 0:15 Checklist
Carpenter 0:15 Checklist
Carpenter 0:15 Checklist
Carpenter 0:15 Checklist
Carpenter 0:15 Checklist
Carpenter 0:15 Checklist
Carpenter 0:55 0:15 Checklist

Carpenter 0:55 0:20 Checklist


Carpenter 1:55 0:40 Checklist

Carpenter 0:30

Carpenter 2:25 0:30 Checklist


Carpenter 0:30 Checklist
Carpenter 3:40 0:15 Checklist

0:00

2:35

0:15

6:30 8:00
Task Location Shift

START

Take Robot from Pool

Detailed Check Sea Water Pump Beach AM


Detailed Check Water Maker Staff House AM
Detailed Fresh Water Pumps Pump Room AM
Detailed Htydrant Pumps Pump Room AM
Detailed Sprinkler System Pump Room AM

Black Barrel Staff House AM


WWS Plant Staff House AM
Compressor Staff House AM
Grease Separator Gym+ Economical Entrance AM

Chemicals Pool Pump Room AM


Measurements Pool Pump Room AM
Cleaning Systems Pool Pump Room AM

BREAK Canteen AM

KK1 Pool Deck Pit + AIRCON Room AM


KK2 Pool Deck Pit + AIRCON Room AM
KK3 Pool Deck Pit + AIRCON Room AM
KK5 Kamena AM
KK4 BOH Atrium AM
MultiSplit System Top of Staff House AM

Buffer (Extra Time)


FINISH

START

Visual Check Sea Water Pump Beach PM


Visual Check Water Maker Staff House PM
Visual Check Generator Staff House PM
Visual Fresh Water Pumps Pump Room PM
Visual Htydrant Pumps Pump Room PM
Visual Sprinkler System Pump Room PM
Visual Check Kitchen Boiler Pump Room PM

Visual Check Black Barrel Staff House PM


Visual Check WWS Plant Staff House PM
Visual Check Compressor Staff House PM
Visual Check Grease Separator Gym+ Economical Entrance PM

Visual Check Chemicals Pool Pump Room PM


Visual Check Measurements Pool Pump Room PM
Visual Check Cleaning Systems Pool Pump Room PM

Steam Room Atrium PM


Check Walk-In Fridges Main Kitchen PM
Visual Check Kitchen Hood Kitchen Ramp PM

WEEKLY TASK

BREAK Canteen PM

Check Buggies (Batteries + Tiers + Connec Staff House PM


Install Tripo on the Pier Pier PM

WEEKLY TASK

Buffer (Extra Time)

FINISH

START
Put Robot in Pool Pool Night

Deep Clean WorkShop WorkShop Night


Deep Clean Pool Pump Room Pool Pump Room Night
Deep Clean AirCon Room AirCon Room Night
Deep Clean Pump Room Pump Room Night
Deep Clean Pool Pits Pool Deck Night
Deep Clean KK4 Room BOH Atrium Night
Deep Clean Water Maker Staff House Night
Deep Clean Outside Water Maker Staff House Night

Charging of all Buggies Staff House Night


Clean Parking Area (only buggies and teleh Staff House Night

BREAK Canteen Night

Clean and organize tools WorkShop Night


Daily Inventory WorkShop Night
Prepare list of used materials that day WorkShop Night

WEEKLY TASK

MONTHLY TASK

Buffer (Extra Time)

FINISH
WEDNESDAY

Speciality Hour (Starting/ Finishng)


Time Consuming To Do

6:30

6:30 0:25

Mechanic + Electrician 6:55 0:45 Checklist


Mechanic + Electrician 0:30 Checklist
Mechanic + Electrician 0:10 Checklist
Mechanic + Electrician 0:10 Checklist
Mechanic + Electrician 8:40 0:10 Checklist

Mechanic + Electrician 8:40 0:15 Checklist


Mechanic + Electrician 0:45 Checklist
Mechanic + Electrician 0:15 Checklist
Mechanic + Electrician 10:15 0:20 Checklist

Mechanic + Electrician 10:15 0:30 Checklist


Mechanic + Electrician 0:30 Checklist
Mechanic + Electrician 11:30 0:15 Checklist

Mechanic + Electrician 0:30

Mechanic + Electrician 12:00 0:15 Checklist


Mechanic + Electrician 0:15 Checklist
Mechanic + Electrician 0:15 Checklist
Mechanic + Electrician 0:15 Checklist
Mechanic + Electrician 0:15 Checklist
Mechanic + Electrician 14:15 1:00 Checklist

0:15
14:30 8:00

14:30

Plumber 14:30 0:05 Checklist


Plumber 0:05 Checklist
Plumber 0:15 Checklist
Plumber 0:05 Checklist
Plumber 0:05 Checklist
Plumber 0:05 Checklist
Plumber 15:15 0:05 Checklist

Plumber 15:15 0:05 Checklist


Plumber 0:05 Checklist
Plumber 0:05 Checklist
Plumber 15:35 0:05 Checklist

Plumber 15:35 0:05 Checklist


Plumber 0:05 Checklist
Plumber 15:50 0:05 Checklist

Plumber 15:50 0:10 Checklist


Plumber 0:15 Checklist
Plumber 16:30 0:15 Checklist

2:15

Plumber 0:30

Plumber 19:15 0:25


Plumber 20:00 0:20

2:15

0:15

22:30 8:00

22:30
Carpenter 22:30 0:25 Checklist

Carpenter 22:55 0:15 Checklist


Carpenter 0:15 Checklist
Carpenter 0:15 Checklist
Carpenter 0:15 Checklist
Carpenter 0:15 Checklist
Carpenter 0:15 Checklist
Carpenter 0:15 Checklist
Carpenter 0:55 0:15 Checklist

Carpenter 0:55 0:20 Checklist


Carpenter 1:55 0:40 Checklist

Carpenter 0:30

Carpenter 2:25 0:30 Checklist


Carpenter 0:30 Checklist
Carpenter 3:40 0:15 Checklist

0:00

2:35

0:15

6:30 8:00
Task Location Shift Speciality
Hour (Starting/ Finishng)
Time Consuming

/
START 14:30

Check Documenttion 14:30 2:00


/
To Do Task

START

Take Robot from Pool

Detailed Check Sea Water Pump


Detailed Check Water Maker
Detailed Fresh Water Pumps
Detailed Htydrant Pumps
Detailed Sprinkler System

Black Barrel
WWS Plant
Compressor
Grease Separator

Chemicals
Measurements
Cleaning Systems

BREAK

KK1
KK2
KK3
KK5
KK4
MultiSplit System

Buffer (Extra Time)


FINISH

START

Visual Check Sea Water Pump


Visual Check Water Maker
Visual Check Generator
Visual Fresh Water Pumps
Visual Htydrant Pumps
Visual Sprinkler System
Visual Check Kitchen Boiler

Visual Check Black Barrel


Visual Check WWS Plant
Visual Check Compressor
Visual Check Grease Separator

Visual Check Chemicals


Visual Check Measurements
Visual Check Cleaning Systems

Steam Room
Check Walk-In Fridges
Visual Check Kitchen Hood

WEEKLY TASK

BREAK

Check Buggies (Batteries + Tiers + Connec


Install Tripo on the Pier

WEEKLY TASK

Buffer (Extra Time)

FINISH

START
Put Robot in Pool

Deep Clean WorkShop


Deep Clean Pool Pump Room
Deep Clean AirCon Room
Deep Clean Pump Room
Deep Clean Pool Pits
Deep Clean KK4 Room
Deep Clean Water Maker
Deep Clean Outside Water Maker

Charging of all Buggies


Clean Parking Area (only buggies and teleh

BREAK

Clean and organize tools


Daily Inventory
Prepare list of used materials that day

WEEKLY TASK

MONTHLY TASK

Buffer (Extra Time)

FINISH
THURSDAY

Location Shift Speciality Hour (Starting/ Finishng)

6:30

6:30

Beach AM Mechanic + Electrician 6:55


Staff House AM Mechanic + Electrician
Pump Room AM Mechanic + Electrician
Pump Room AM Mechanic + Electrician
Pump Room AM Mechanic + Electrician 8:40

Staff House AM Mechanic + Electrician 8:40


Staff House AM Mechanic + Electrician
Staff House AM Mechanic + Electrician
Gym+ Economical Entrance AM Mechanic + Electrician 10:15

Pool Pump Room AM Mechanic + Electrician 10:15


Pool Pump Room AM Mechanic + Electrician
Pool Pump Room AM Mechanic + Electrician 11:30

Canteen AM Mechanic + Electrician

Pool Deck Pit + AIRCON Room AM Mechanic + Electrician 12:00


Pool Deck Pit + AIRCON Room AM Mechanic + Electrician
Pool Deck Pit + AIRCON Room AM Mechanic + Electrician
Kamena AM Mechanic + Electrician
BOH Atrium AM Mechanic + Electrician
Top of Staff House AM Mechanic + Electrician 14:15
14:30

14:30

Beach PM Electrician 14:30


Staff House PM Electrician
Staff House PM Electrician
Pump Room PM Electrician
Pump Room PM Electrician
Pump Room PM Electrician
Pump Room PM Electrician 15:15

Staff House PM Electrician 15:15


Staff House PM Electrician
Staff House PM Electrician
Gym+ Economical Entrance PM Electrician 15:35

Pool Pump Room PM Electrician 15:35


Pool Pump Room PM Electrician
Pool Pump Room PM Electrician 15:50

Atrium PM Electrician 15:50


Main Kitchen PM Electrician
Kitchen Ramp PM Electrician 16:30

Canteen PM Electrician

Staff House PM Electrician 19:15


Pier PM Electrician 20:00

22:30

22:30
Pool Night Carpenter 22:30

WorkShop Night Carpenter 22:55


Pool Pump Room Night Carpenter
AirCon Room Night Carpenter
Pump Room Night Carpenter
Pool Deck Night Carpenter
BOH Atrium Night Carpenter
Staff House Night Carpenter
Staff House Night Carpenter 0:55

Staff House Night Carpenter 0:55


Staff House Night Carpenter 1:55

Canteen Night Carpenter

WorkShop Night Carpenter 2:25


WorkShop Night Carpenter
WorkShop Night Carpenter 3:40

6:30
Time Consuming To Do Task

START

0:25 Take Robot from Pool

0:45 Checklist Detailed Check Sea Water Pump


0:30 Checklist Detailed Check Water Maker
0:10 Checklist Detailed Fresh Water Pumps
0:10 Checklist Detailed Htydrant Pumps
0:10 Checklist Detailed Sprinkler System

0:15 Checklist Black Barrel


0:45 Checklist WWS Plant
0:15 Checklist Compressor
0:20 Checklist Grease Separator

0:30 Checklist Chemicals


0:30 Checklist Measurements
0:15 Checklist Cleaning Systems

0:30 BREAK

0:15 Checklist KK1


0:15 Checklist KK2
0:15 Checklist KK3
0:15 Checklist KK5
0:15 Checklist KK4
1:00 Checklist MultiSplit System

0:15 Buffer (Extra Time)


8:00 FINISH

START

0:05 Checklist Visual Check Sea Water Pump


0:05 Checklist Visual Check Water Maker
0:15 Checklist Visual Check Generator
0:05 Checklist Visual Fresh Water Pumps
0:05 Checklist Visual Htydrant Pumps
0:05 Checklist Visual Sprinkler System
0:05 Checklist Visual Check Kitchen Boiler

0:05 Checklist Visual Check Black Barrel


0:05 Checklist Visual Check WWS Plant
0:05 Checklist Visual Check Compressor
0:05 Checklist Visual Check Grease Separator

0:05 Checklist Visual Check Chemicals


0:05 Checklist Visual Check Measurements
0:05 Checklist Visual Check Cleaning Systems

0:10 Checklist Steam Room


0:15 Checklist Check Walk-In Fridges
0:15 Checklist Visual Check Kitchen Hood

2:15 WEEKLY TASK

0:30 BREAK

0:25 Check Buggies (Batteries + Tiers + Connec


0:20 Install Tripo on the Pier

2:15 WEEKLY TASK

0:15 Buffer (Extra Time)

8:00 FINISH

START
0:25 Checklist Put Robot in Pool

0:15 Checklist Deep Clean WorkShop


0:15 Checklist Deep Clean Pool Pump Room
0:15 Checklist Deep Clean AirCon Room
0:15 Checklist Deep Clean Pump Room
0:15 Checklist Deep Clean Pool Pits
0:15 Checklist Deep Clean KK4 Room
0:15 Checklist Deep Clean Water Maker
0:15 Checklist Deep Clean Outside Water Maker

0:20 Checklist Charging of all Buggies


0:40 Checklist Clean Parking Area (only buggies and teleh

0:30 BREAK

0:30 Checklist Clean and organize tools


0:30 Checklist Daily Inventory
0:15 Checklist Prepare list of used materials that day

0:00 WEEKLY TASK

2:35 MONTHLY TASK

0:15 Buffer (Extra Time)

8:00 FINISH
FRIDAY

Location Shift Speciality Hour (Starting/ Finishng)

6:30

6:30

Beach AM Mechanic + Electrician 6:55


Staff House AM Mechanic + Electrician
Pump Room AM Mechanic + Electrician
Pump Room AM Mechanic + Electrician
Pump Room AM Mechanic + Electrician 8:40

Staff House AM Mechanic + Electrician 8:40


Staff House AM Mechanic + Electrician
Staff House AM Mechanic + Electrician
Gym+ Economical Entrance AM Mechanic + Electrician 10:15

Pool Pump Room AM Mechanic + Electrician 10:15


Pool Pump Room AM Mechanic + Electrician
Pool Pump Room AM Mechanic + Electrician 11:30

Canteen AM Mechanic + Electrician

Pool Deck Pit + AIRCON Room AM Mechanic + Electrician 12:00


Pool Deck Pit + AIRCON Room AM Mechanic + Electrician
Pool Deck Pit + AIRCON Room AM Mechanic + Electrician
Kamena AM Mechanic + Electrician
BOH Atrium AM Mechanic + Electrician
Top of Staff House AM Mechanic + Electrician 14:15
14:30

14:30

Beach PM Electrician 14:30


Staff House PM Electrician
Staff House PM Electrician
Pump Room PM Electrician
Pump Room PM Electrician
Pump Room PM Electrician
Pump Room PM Electrician 15:15

Staff House PM Electrician 15:15


Staff House PM Electrician
Staff House PM Electrician
Gym+ Economical Entrance PM Electrician 15:35

Pool Pump Room PM Electrician 15:35


Pool Pump Room PM Electrician
Pool Pump Room PM Electrician 15:50

Atrium PM Electrician 15:50


Main Kitchen PM Electrician
Kitchen Ramp PM Electrician 16:30

Canteen PM Electrician

Staff House PM Electrician 19:15


Pier PM Electrician 20:00

22:30

22:30
Pool Night Carpenter 22:30

WorkShop Night Carpenter 22:55


Pool Pump Room Night Carpenter
AirCon Room Night Carpenter
Pump Room Night Carpenter
Pool Deck Night Carpenter
BOH Atrium Night Carpenter
Staff House Night Carpenter
Staff House Night Carpenter 0:55

Staff House Night Carpenter 0:55


Staff House Night Carpenter 1:55

Canteen Night Carpenter

WorkShop Night Carpenter 2:25


WorkShop Night Carpenter
WorkShop Night Carpenter 3:40

6:30
Time Consuming To Do

0:25

0:45 Checklist
0:30 Checklist
0:10 Checklist
0:10 Checklist
0:10 Checklist

0:15 Checklist
0:45 Checklist
0:15 Checklist
0:20 Checklist

0:30 Checklist
0:30 Checklist
0:15 Checklist

0:30

0:15 Checklist
0:15 Checklist
0:15 Checklist
0:15 Checklist
0:15 Checklist
1:00 Checklist

0:15
8:00

0:05 Checklist
0:05 Checklist
0:15 Checklist
0:05 Checklist
0:05 Checklist
0:05 Checklist
0:05 Checklist

0:05 Checklist
0:05 Checklist
0:05 Checklist
0:05 Checklist

0:05 Checklist
0:05 Checklist
0:05 Checklist

0:10 Checklist
0:15 Checklist
0:15 Checklist

2:15

0:30

0:25
0:20

2:15

0:15

8:00
0:25 Checklist

0:15 Checklist
0:15 Checklist
0:15 Checklist
0:15 Checklist
0:15 Checklist
0:15 Checklist
0:15 Checklist
0:15 Checklist

0:20 Checklist
0:40 Checklist

0:30

0:30 Checklist
0:30 Checklist
0:15 Checklist

0:00

2:35

0:15

8:00
Engineering
Weekly Program
Engineering
Monthly Program
Engineering
Yearly Program