PM Schedule For August-2020: S. No. Area Mech Elect C&I Total
PM Schedule For August-2020: S. No. Area Mech Elect C&I Total
Wagon tippler – In Haul wheel gripper, Out haul wheel gripper, Table
wheel gripper inspection ,C&I instruments inspection.C&I 1
1-Aug-20 CHP instruments inspection 1 1
1-Aug-20 CHP Wagon tippler – Top clamp Pad inspection 1 1
2-Aug-20 BOILER FD Fan B(Including Discharge Gate and HT Motor) 1 1
2-Aug-20 BOILER LOP A FD Fan B 1 1
2-Aug-20 BOILER LOP B FD Fan B 1 1
2-Aug-20 BOILER ID Fan B(Including I/L & O/l Gate It's Blower and HT Motor) 1 1
2-Aug-20 BOILER LOP A ID Fan B 1 1
2-Aug-20 BOILER LOP B ID Fan B 1 1
2-Aug-20 BOILER APH-B 1 1
2-Aug-20 BOILER LOP-A FOR APH-B SUP. BRG 1 1
2-Aug-20 BOILER LOP-A FOR APH-B GUIDE BRG 1 1
2-Aug-20 BOILER LOP-B FOR APH-B SUP. BRG 1 1
2-Aug-20 BOILER LOP-B FOR APH-B GUIDE BRG 1 1
2-Aug-20 BOILER APH SOOT BLOWER B 1 1
2-Aug-20 TURBINE TDBFP B LOP B 1 1
2-Aug-20 TURBINE CENTRIFUGE UNIT TDBFP A 1
2-Aug-20 TURBINE TDBFP A DRAIN OIL pump 1 1 1
2-Aug-20 TURBINE BC VAPOUR EXHAUST FAN -B 1
2-Aug-20 TURBINE Roof Extractor 1-4 & 9-12 1 1
2-Aug-20 BOP AHU -3 TG 8.5 M 1
2-Aug-20 IDCT Fan#3 and GB#3 with Motor 1 1 1
2-Aug-20 DM Cartridge Filter feed pump no.3 1
2-Aug-20 DM MB Regeneration Blower No.1 1
2-Aug-20 ETP AIR BLOWERS A & B 1 1
2-Aug-20 PT Agitator Ferric Chloride dosing tank No.2 1
2-Aug-20 PT Overhead WST Instruments 1
2-Aug-20 TURBINE UT-1A Transformer 1
2-Aug-20 TURBINE UT-1B Transformer 1
CHP 1
2-Aug-20 VGF-B ( screen + counter weight + cardial shaft + exciter + motor ) 1
CHP RBF-D ( gearbox + conveyor + plummber block + idlers + pulley +
2-Aug-20 motor + fluid coupling + safety devices ) 1
2-Aug-20 CHP Belt wieigher-3B 1
2-Aug-20 CHP JUPITAR CONTROL PANEL (BWSR) 1
2-Aug-20 AHP IM Silo Vent Fan - A & Bag House - A 1
2-Aug-20 AHP Instrument Air Compressor - A 1 1
2-Aug-20 AHP IAC Dryer - A 1 1
2-Aug-20 AHP EXHAUST FAN PUMP HOUSE -8 1
2-Aug-20 AHP Clinker Grinder - D, Sluice Feed Gate - D 1 1
2-Aug-20 Electrical USS 3.5 Meter To admin USS 1
2-Aug-20 Boiler FD FAN-B with LOS Instruments 1
2-Aug-20 BOP Field Instruments installed at Field Hostel 1
2-Aug-20 TURBINE TG BULDING POTEBLE WATER TANK 1
2-Aug-20 BOP FH POTEBLE WATER TANK AT RECEPTION 1
2-Aug-20 BOP FH POTEBLE WATER TANK ASH DYKE SIDE 1
2-Aug-20 BOP FH POTEBLE WATER TANK OPP. ASH DYKE SIDE 1
2-Aug-20 CHP SAC – Drive pinion and gear segment inspection 1
3-Aug-20 BOILER Water Wall blower (67 ~ 77) 1 1
3-Aug-20 BOILER DCS 1
3-Aug-20 TURBINE GENERATOR AC SEAL OIL PUMP B 1
3-Aug-20 TURBINE PHOSPHATE/ HP DOSING PUMP B 1
3-Aug-20 TURBINE Roof Extractor 5-8 & 13-14 1 1
3-Aug-20 TURBINE ACW-3 1
3-Aug-20 BOP AHU -7 TG 24 M 1
3-Aug-20 IDCT Fan#4 and GB#4 with Motor 1 1 1
3-Aug-20 DM Ultra filtration Backwash Pump No.1 1
3-Aug-20 DM Ultra filtration Backwash Pump No.2 1
3-Aug-20 DM Alkali Measuring Tank Instruments 1
3-Aug-20 BOP Plant Makeup Pump 1 & 2 (C&I Instruments including PLC) 1
CHP BCN 8B ( gearbox + conveyor + plummber block + idlers + pulley + 1
3-Aug-20 motor + scoop coupling + thruster brake) 1 1
CHP Crusher-A ( gearbox + plummber block + hammer + hydraulic pump +
3-Aug-20 motor + scoop coupling + hydraulic cylinder ) 1
3-Aug-20 CHP BF-1&2, DFDS NOZZLES cleaning 1
3-Aug-20 CHP Belt wieigher-8A 1
3-Aug-20 AHP Economiser Water Pump - A 1
3-Aug-20 AHP Seal Water Pump - A 1 1
3-Aug-20 AHP Bulker Unloading System 1
3-Aug-20 AHP EXHAUST FAN PUMP HOUSE -10 1
3-Aug-20 AHP EXHAUST FAN BATTERY ROOM-1 1
3-Aug-20 AHP EXHAUST FAN BATTERY ROOM-2 1
3-Aug-20 Boiler ID FAN-A with LOS Instruments 1
Regeneration Building - CAUSTIC TRANSFER CUM RECIRCULATION 1
3-Aug-20 CPU PUMP- "A" 1
Regeneration Building - CAUSTIC TRANSFER CUM RECIRCULATION 1
3-Aug-20 CPU PUMP -"B" 1
Regeneration Building - CAUSTIC TRANSFER CUM RECIRCULATION
3-Aug-20 CPU SYSTEM INSTRUMENT 1
3-Aug-20 AHP AHP Control Desk and HMI System 1
3-Aug-20 BOILER BOILER DRAIN PIT NEAR CST TANK 1
4-Aug-20 BOILER Coal Mill G 1 1
4-Aug-20 BOILER Coal Feeder G 1
4-Aug-20 BOILER MILL REJECT SYSTEM-G 1
4-Aug-20 BOILER MILL-G LUBE OIL PUMP-A 1 1
4-Aug-20 BOILER MILL-G LUBE OIL PUMP-B 1 1
4-Aug-20 BOILER Hot Air Gate & Hot air Damper G Mill 1
4-Aug-20 BOILER Cold Air Gate & Cold air Damper G Mill 1
4-Aug-20 BOILER LDO Gun HJ Elevation 1
4-Aug-20 BOILER Hopper Heater-B Section-1 1
4-Aug-20 BOILER Primary Air APH A&B O/L Dampers & Blower's 1
4-Aug-20 TURBINE SG DMCW PHE A &B Air Cleaning 1
4-Aug-20 TURBINE SG DMCW PHE A &B C&I 1
4-Aug-20 TURBINE CONTROL FLUID PUMP A 1
4-Aug-20 TURBINE CONTROL FLUID TANK VAPOUR EXHAUST FAN A 1
4-Aug-20 TURBINE CONTROL FLUID RECIRCULATION PUMP A 1
4-Aug-20 TURBINE CONTROL FLUID PURIFICATION SYSTEM 1
4-Aug-20 TURBINE Roof Extractor 15-18 & 23-26 1 1
4-Aug-20 BOP AHU -8 TG 24 M 1
4-Aug-20 BOP Service water pumps -2 (10GHF02AP001) 1 1
4-Aug-20 IDCT Fan#5 and GB#5 with Motor 1 1 1
4-Aug-20 DM DMF Feed pump No.3 1
4-Aug-20 DM Ro Block-2 Instruments 1
4-Aug-20 ETP Lime Dosing Pump No.1- ETP 1 1
4-Aug-20 ETP Lime Dosing Pump No.2 - ETP 1 1
CHP BCN 1A ( gearbox + conveyor + plummber block + idlers + pulley +
4-Aug-20 motor + scoop coupling + safety devices ) 1
CHP RBF-B ( gearbox + conveyor + plummber block + idlers + pulley + 1
4-Aug-20 motor + fluid coupling + safety devices ) 1 1
4-Aug-20 CHP BCN-7, DFDS NOZZLES cleaning 1
4-Aug-20 CHP Battery 1 1
4-Aug-20 CHP Belt wieigher-8B 1
4-Aug-20 AHP Instrument Air Compressor - A 1
4-Aug-20 AHP Buffer Hopper Tower - 4 1
4-Aug-20 AHP ESP Pass - B MHV's 1
4-Aug-20 AHP PLC backup 1
4-Aug-20 AHP EXHAUST FAN HCSD MCC -1 1
4-Aug-20 AHP BA Overflow Pump -B 1 1
4-Aug-20 Boiler ID FAN-B with LOS Instruments 1
MILL-G,Feeder-G,PLOS-G,MRS-G,CAG-G,CAD-G,HAG-G,HAD-G with
4-Aug-20 Boiler inst. 1
4-Aug-20 BOILER BOILER DRAIN PIT BEHIND BOILER LIFT 1
1
4-Aug-20 CHP SAC- Stool foundation inspection & Electrical cable tray ( Igus) 1
5-Aug-20 BOILER LDO Gun AB Elevation 1
5-Aug-20 BOILER Secondary Air APH A & B O/L Dampers & Blower s 1
5-Aug-20 TURBINE PRIMARY WATER PHE A & B Air Cleaning 1
5-Aug-20 TURBINE SEAL OIL VACCUM PUMP-A 1
5-Aug-20 TURBINE CONTROL FLUID COOLER A 1
5-Aug-20 TURBINE GEN H2 DRYER B 1 1
5-Aug-20 TURBINE Roof Extractor 19-22 & 27-30 1 1
5-Aug-20 BOP AHU -9 TG 24 M 1
5-Aug-20 IDCT Fan#6 and GB#6 with Motor 1 1 1
5-Aug-20 DM Mixer Alkali Dosing Tank 1
5-Aug-20 ETP Coagulent Dosing Pump No.2- ETP 1 1
5-Aug-20 PT PT PLANT PLC & PA System 1
5-Aug-20 SWITCHYARD DCDB -220 V 1
5-Aug-20 SWITCHYARD DCDB -48 V 1
5-Aug-20 CHP BCN-3B scoop motor, radiator fan motor & LCP 1
5-Aug-20 CHP BCN-3A&B, DFDS NOZZLES cleaning 1
5-Aug-20 CHP Belt wieigher-7D 1
5-Aug-20 AHP ESP Fluidising Blower - B 1 1
5-Aug-20 AHP Economizer Water Pump - B 1 1
5-Aug-20 AHP IM Silo Vent Fan - B & Bag House - B 1 1
5-Aug-20 BOP Transformer Yard Sump Pump-A 1 1 1
1
5-Aug-20 CPU Regeneration Building- CAUSTIC PREPARATIN TANK AGITATOR 1
5-Aug-20 ESP ESP-A PASS SIDE DRAIN PIT 1
SAC- Hydraulic power pack inspection, hydraulic motors inspection 1
5-Aug-20 CHP and cleaning, 1 1
6-Aug-20 BOILER Water Wall blower (78 ~ 88) 1 1
6-Aug-20 BOILER GDRM-C & CERM C & EERM C 1
6-Aug-20 BOILER SCAPH B-I/L & O/L Dampers 1
6-Aug-20 TURBINE TG DMCW Pump C 1 1
6-Aug-20 TURBINE SEAL OIL PHE A & PHE B Air Cleaning 1
6-Aug-20 RWPH Raw Water Pump -B 1 1 1
6-Aug-20 BOP ESP AHU-4 1
6-Aug-20 IDCT Fan#7 and GB#7 with Motor 1 1 1
6-Aug-20 PT Polyelectrolyte Dosing Pump No.2 1 1
6-Aug-20 PT Flash Mixing Chamber Instruments 1
6-Aug-20 DM ETP MCC 1
CHP BCN 4A ( gearbox + conveyor + plummber block + idlers + pulley +
6-Aug-20 motor + scoop coupling + thruster brake) 1
CHP BCN 6A ( gearbox + conveyor + plummber block + idlers + pulley +
6-Aug-20 motor + scoop coupling + thruster brake) 1
CHP RBF-C ( gearbox + conveyor + plummber block + idlers + pulley + 1
6-Aug-20 motor + fluid coupling + safety devices ) 1 1
CHP 1
6-Aug-20 Flap gate-1 ( plummber block + cylinder + dumper gate + motor ) 1
BWSR-Long travel ( gearbox, auto lubrication system + rail inspection
CHP + gear motor + travel motor (1-16) + brake coil + lubrication motor + 1
6-Aug-20 all instruments ) 1
6-Aug-20 AHP ESP Fluidising Blower - B 1
6-Aug-20 AHP BA LP Pump - A 1 1
6-Aug-20 AHP EXHAUST FAN HCSD MCC -2 1
6-Aug-20 AHP EXHAUST FAN PMCC 1&2-1 1
6-Aug-20 AHP Vacuum Pump - E 1 1
6-Aug-20 AHP Bottom Ash Hopper sump Pump - B 1 1
6-Aug-20 BOP Transformer Yard Sump Pump-B 1 1 1
6-Aug-20 TURBINE Roof Extractor 31-34 & 39-42 1 1
6-Aug-20 CPU Regeneration Building- CAUSTIC MEASURING TANK AGITATOR 1 1
6-Aug-20 AHP ASH DYKE LEVEL SWITCH-1 1
1
6-Aug-20 CHP Wagon tippler – Drive arrangements inspection and lubrications 1
CHP Crusher-A scoop motor, radiator fan, oil circulation motor & LCP+
9-Aug-20 scoop instruments 1
CHP BWSR-Intermediate conveyor ( gearbox + pulley + idlers + belt + 1
9-Aug-20 motor + thruster break + all safety equipment ) 1 1
9-Aug-20 CHP BCN-8A&B, DFDS NOZZLES cleaning 1
9-Aug-20 CHP LDB-3 1
9-Aug-20 AHP ACDB HCSD MCC ROOM/PLC 1
9-Aug-20 AHP Clinker Grinder - C, Sluice Feed Gate - C & Hydroejector - C. 1
9-Aug-20 AHP Buffer Hopper Tower - 5 1
9-Aug-20 AHP ESP Pass - C MHV's 1
9-Aug-20 AHP Main silo PLC 1
9-Aug-20 AHP LIGHTING PANEL HCSD VFD ROOM 1
9-Aug-20 Boiler APH-A & SOOT BLOWER-A WITH SB & GB LOS INST. 1
9-Aug-20 CHP Primary Coal Sampler-2 1
9-Aug-20 CHP Reject Screw Conveyor-2 1 1
9-Aug-20 CHP Coal Sampler Slide Gate-2 1 1
9-Aug-20 CPU CPU TG 0 METER - CPU AIR BLOWER- "A" 1 1
9-Aug-20 CPU CPU TG 0 METER - CPU AIR BLOWER- "B" 1 1
9-Aug-20 CPU CPU TG 0 METER - CPU AIR BLOWER SYSTEM INSTRUMENT 1
9-Aug-20 CHP JNT-4 DRAIN PIT 1
9-Aug-20 BOP FH POTEBLE WATER TANK AT RECEPTION 1
9-Aug-20 BOP FH POTEBLE WATER TANK ASH DYKE SIDE 1
9-Aug-20 BOP FH POTEBLE WATER TANK OPP. ASH DYKE SIDE 1
1
9-Aug-20 CHP Wagon tippler - Endring gear segment inspection and lubrication.
9-Aug-20 CHP SAC – Guide wheel, Rail wheel, Table inspection 1
10-Aug-20 TURBINE TURBINE VACUUM PUMP B 1
10-Aug-20 TURBINE NAOH DOSING SYSTEM 1
10-Aug-20 TURBINE 220 V Battery Bank-2 1
10-Aug-20 BOP LDO FORWARDING SKID 1
10-Aug-20 BOP TG Air Washer Building Ventilation Fan5 1
10-Aug-20 BOP ESP Building Ventilation Fan 1 1
10-Aug-20 IDCT Fan#11 and GB#11 with Motor 1 1 1
10-Aug-20 DM DM Water transfer Pump No.2 1
10-Aug-20 DM Alkali Storage Tank Instruments 1
10-Aug-20 ETP Acid Dosing Pump No.2 -ETP 1 1
10-Aug-20 BTG UAT-1A 1
BOP ESP AC Chiller A with Condensate pump -A, Chilled water pump -A, 1
14-Aug-20 ESP Cooling tower A
14-Aug-20 IDCT Fan#4A and GB#4A with Motor 1 1 1
14-Aug-20 DM DMF Feed pump No.1 1
14-Aug-20 ETP CWT PLC RIO Panel & PA System 1
14-Aug-20 ETP Coagulent Dosing Tank Mixer - ETP 1
14-Aug-20 PT Klari Tube Settler Bridge Drive 1
14-Aug-20 PT CLARIFIED WATER TRANSFER PUMP 1 1 1
CHP Dribble feeder-A ( gearbox + conveyor + plummber block + idlers +
14-Aug-20 pulley + motor ) 1
CHP W/T Sump pump motor-1 & 2 + slurry pump + LCP + level switch + 1
14-Aug-20 pipe line 1 1
14-Aug-20 CHP Metal detector-1 1
14-Aug-20 CHP LDB-5 1
14-Aug-20 AHP ESP Fluidising Blower Heater - A 1
14-Aug-20 AHP Buffer Hopper Tower - 6 1 1
14-Aug-20 AHP ESP Pass - D MHV's 1
14-Aug-20 AHP AC of PLC CONTROL ROOM (Main and Intermediate Silo) 1
14-Aug-20 AHP LIGHTING PANEL ESP AREA 1
14-Aug-20 AHP Clinker Grinder - F, Sluice Feed Gate - F 1 1
14-Aug-20 AHP AHP UPS and Battery System 1
14-Aug-20 AHP AHP Main Control Room PLC 1
14-Aug-20 AHP AHP Intermediate Silo Control Room PLC 1
14-Aug-20 AHP AHP ABEL Pump A & B PLC 1
14-Aug-20 CHP Bottle Sampler Collector 1
Regeneration Building - SEPARATION CATION REGENERATION VESSEL
14-Aug-20 CPU INSTRUMENT 1
Ash Dyke Recovery Pump and Ash Dyke Sepage Sump Pump
14-Aug-20 AHP Instruments 1
Weigh Bridges # 1&2 1
14-Aug-20 Weigh Bridge (Calibration, Cleaning, JB Inspection etc) 1 1
14-Aug-20 TURBINE AIR SEPERATOR TANK AT VAC P/P-2 1
1
14-Aug-20 CHP Wagon tippler – Tippler table inspection & Load cell inspection 1
15-Aug-20 BOILER Scanner Air Fan Ac 1 1
15-Aug-20 BOILER APH-A 1 1
15-Aug-20 BOILER LOP- A FOR APH-A Sup. BRG 1 1
15-Aug-20 BOILER LOP-A FOR APH-A GUIDE BRG 1 1
15-Aug-20 BOILER LOP- B FOR APH-A Sup. BRG 1 1
15-Aug-20 BOILER LOP-B FOR APH-A GUIDE BRG 1 1
15-Aug-20 BOILER APH SOOT BLOWER A 1 1
15-Aug-20 BOILER Water Wall blower (1 ~ 11) 1 1
15-Aug-20 BOILER Boiler ECW tank pump-1A 1 1
15-Aug-20 BOILER UPS ( MAIN PLANT) 1
15-Aug-20 TURBINE ACW-1 1
15-Aug-20 BOP Make Up pump A 1
15-Aug-20 FIRE FIGHTING FOPH Foam Pump-1 (Motor Driven) 1
BOP ESP AC Chiller B with Condensate pump -B, Chilled water pump -B, 1
15-Aug-20 ESP Cooling tower B
15-Aug-20 IDCT Fan#5A and GB#5A with Motor 1 1 1
15-Aug-20 DM DMF Backwash pump No.1 1
15-Aug-20 DM Clarifier water transfer Pump No.1 1
15-Aug-20 DM Antiscalent dosing pump No.1 1
15-Aug-20 DM Degasser Air Blower No.1 1 1
15-Aug-20 DM PLC,OWS & PA System 1
CHP BCN-1A scoop motor + radiator fan motor + LCP + all scoop
15-Aug-20 instruments 1 1
CHP Apron feeder-B ( hydraulic power pack + pan plate + idlers + chain
drive + hydraulic take up unit + screw jack + spocet pulley + hydraulic
15-Aug-20 motor + oil circulation motor + oil cooler fan ) 1
CHP Dribble feeder-B ( gearbox + conveyor + plummber block + idlers +
15-Aug-20 pulley + motor ) 1
BOP TG-Chiller -A with Chiiled water Pump -A, Condenser water Pump-A, 1
16-Aug-20 Cooling Tower fan-A-1
16-Aug-20 BOP INST. AIR COMP-1A 1
16-Aug-20 IDCT Fan#6A and GB#6A with Motor 1 1 1
16-Aug-20 DM Mixed Bed Feed Pump No.1 1
16-Aug-20 DM UPS & Battery 1
16-Aug-20 ETP Plant gardening pump - 1 1 1
16-Aug-20 ETP ETP PLC RIO Panel & PA System 1
16-Aug-20 SWITCHYARD ACDB- 415 V 1
16-Aug-20 SWITCHYARD MLDB- 415 V 1
CHP 1
16-Aug-20 Flap gate-3 ( plummber block + cylinder + dumper gate + motor ) 1
CHP 1
16-Aug-20 Flap gate-6 ( plummber block + cylinder + dumper gate + motor ) 1
Wagon tippler – In Haul wheel gripper, Out haul wheel gripper, Table
wheel gripper inspection ,C&I instruments inspection.C&I 1
16-Aug-20 CHP instruments inspection 1 1
17-Aug-20 BOILER FD Fan A (Including Discharge Gate and HT Motor) 1
17-Aug-20 BOILER LOP A FD Fan A 1
17-Aug-20 BOILER LOP B FD Fan A 1
17-Aug-20 BOILER LRSB (127 ~ 133 ) 1 1
17-Aug-20 BOILER EERM B (SECTION-2) 1
17-Aug-20 TURBINE TDBFP A (Includes GOV/TSI/TUBINE/FEED PUMP) 1 1
17-Aug-20 TURBINE TDBFP A LOP A 1 1
17-Aug-20 TURBINE TDBFP-A EOP 1 1
17-Aug-20 TURBINE TDBFP A JOP 1 1
17-Aug-20 TURBINE CENTRIFUGE UNIT TDBFP A 1 1
17-Aug-20 BOP LDO Unloading Pump A incuding assoiciated valves 1
BOP TG-Chiller -B with Chiiled water Pump -B, Condenser water Pump-B, 1
17-Aug-20 Cooling Tower fan-A-2
17-Aug-20 IDCT Fan#7A and GB#7A with Motor 1 1 1
17-Aug-20 DM UF Alkali dosing pump No.1(CEB) 1
17-Aug-20 DM Acid Measuring Tank Instruments 1
17-Aug-20 ETP Coagulent Dosing Pump No.1 -ETP 1 1
CHP Apron feeder-A ( hydraulic power pack + pan plate + idlers + chain 1
drive + hydraulic take up unit + screw jack + spocet pulley + hydraulic
28-Aug-20 motor + oil circulation motor + oil cooler fan ) 1 1
28-Aug-20 CHP LDB-2 1
28-Aug-20 AHP Dewatering Bin - A 1
28-Aug-20 AHP Eco Flushihng Apparatus 4&3 1
28-Aug-20 AHP 415V MAIN SILO SWITCHBOARD 1
28-Aug-20 AHP HCSD water Pump -B 1 1 1
28-Aug-20 AHP Transport Air compressor -A 1 1 1
29-Aug-20 Boiler Mill Reject System Silo 1 & 2 instruments, PJT & common C&I System 1
29-Aug-20 AHP AHP UPS and Battery System 1
29-Aug-20 AHP AHP Main Control Room PLC 1
29-Aug-20 AHP AHP Intermediate Silo Control Room PLC 1
29-Aug-20 AHP AHP ABEL Pump A & B PLC 1
AHP Main Control Room & Intermediate Silo PLC Electronic Earth Pit
29-Aug-20 AHP treatment 1
29-Aug-20 AHP AHP Main Silo Electronic Earth Pit treatment 1
29-Aug-20 Boiler PA FAN-A with LOS Instruments 1
29-Aug-20 CHP Bottle Sampler Collector 1 1
29-Aug-20 CPU Regeneration Building-ACID DOSING PUMP - "A" 1
29-Aug-20 CPU Regeneration Building-ACID DOSING PUMP - "B" 1
29-Aug-20 CPU Regeneration Building-ACID DOSING SYSTEM INSTRUMENT 1
29-Aug-20 TURBINE Condensate Transfer Pump A 1 1
Ash Dyke Recovery Pump and Ash Dyke Sepage Sump Pump
29-Aug-20 AHP Instruments 1
1
29-Aug-20 CHP Wagon tippler – Tippler table inspection & Load cell inspection 1
29-Aug-20 CHP Wagon tippler – Top clamp Pad inspection 1 1
30-Aug-20 BOILER PA Fan B (Including Discharge Gate and HT Motor) 1
30-Aug-20 BOILER LOP A PA Fan B 1
30-Aug-20 BOILER LOP B PA Fan B 1
30-Aug-20 BOILER Water Wall blower (56 ~ 66) 1
30-Aug-20 BOILER LIE-20,21,22,23,24,25,26,SG-01 1
30-Aug-20 TURBINE CONDENSATE EXTRACTION PUMP B 1
30-Aug-20 TURBINE LP BYPASS PUMP A 1
30-Aug-20 TURBINE ACW Self Cleaning STRAINER-1 1
30-Aug-20 BOP AHU -1 TG 8.5 M 1
30-Aug-20 BOP INST. AIR COMP-1B 1 1 1
30-Aug-20 IDCT Fan#1 & GB#1 with Motor 1 1 1
30-Aug-20 DM Clarifier water transfer Pump No.2 1 1
30-Aug-20 DM Antiscalent dosing pump No.2 1
30-Aug-20 PT DWPE Dosing Tank Instruments 1
30-Aug-20 CHP BCN-8A scoop motor, radiator fan motor & LCP 1
CHP BWSR-Automatic rail clamp ( manual break + hydraulic break + motor 1
30-Aug-20 + all instrument equipment ) 1 1
Wagon tippler – In Haul wheel gripper, Out haul wheel gripper, Table
wheel gripper inspection ,C&I instruments inspection.C&I 1
31-Aug-20 CHP instruments inspection 1 1
Date Coal recipt Coal Consup LDO Coal total 3A 3B 8A 8B
5/21/2020
5/22/2020 0
5/23/2020
5/24/2020
5/25/2020
5/26/2020
5/27/2020
5/28/2020
5/29/2020
5/30/2020
5/31/2020
6/1/2020
6/2/2020
6/3/2020
6/4/2020
6/5/2020
6/6/2020
6/7/2020
6/8/2020
6/9/2020
6/10/2020
6/11/2020
6/12/2020
6/13/2020
6/14/2020
6/15/2020
6/16/2020
Date Coal recipt Coal Consup LDO Coal total 3A 3B 8A 8B
6/17/2020
6/18/2020
6/19/2020
6/20/2020
6/21/2020
6/22/2020
6/23/2020
6/24/2020
6/25/2020
6/26/2020
6/27/2020
6/28/2020
6/29/2020
6/30/2020
7/1/2020
7/2/2020
7/3/2020
7/4/2020
7/5/2020
7/6/2020
7/7/2020
7/8/2020
7/9/2020
7/10/2020
7/11/2020
7/12/2020
7/13/2020
Date Coal recipt Coal Consup LDO Coal total 3A 3B 8A 8B
7/14/2020
7/15/2020
7/16/2020
7/17/2020
7/18/2020
7/19/2020
7/20/2020
7/21/2020
7/22/2020
7/23/2020
7/24/2020
7/25/2020
7/26/2020
7/27/2020
7/28/2020
7/29/2020
7/30/2020
7/31/2020
8/1/2020
8/2/2020
8/3/2020
8/4/2020
8/5/2020
8/6/2020
8/7/2020
8/8/2020
8/9/2020
Date Coal recipt Coal Consup LDO Coal total 3A 3B 8A 8B
8/10/2020
8/11/2020
8/12/2020
8/13/2020
8/14/2020
8/15/2020
8/16/2020
8/17/2020
8/18/2020
8/19/2020
8/20/2020
8/21/2020
8/22/2020
8/23/2020
8/24/2020
8/25/2020
8/26/2020
8/27/2020
8/28/2020
8/29/2020
8/30/2020
8/31/2020
9/1/2020
9/2/2020
9/3/2020
9/4/2020
9/5/2020
Date Coal recipt Coal Consup LDO Coal total 3A 3B 8A 8B
9/6/2020
9/7/2020
9/8/2020
9/9/2020
9/10/2020
9/11/2020
9/12/2020
9/13/2020
9/14/2020
9/15/2020
9/16/2020
9/17/2020
9/18/2020
9/19/2020
9/20/2020
9/21/2020
9/22/2020
9/23/2020
9/24/2020