WIR Format

The document is an Inspection Request (IR) form used by contractors to request inspections for various construction aspects, including structural, electrical, and plumbing works. It outlines the necessary details such as inspection dates, relevant drawings, and required approvals from associated divisions and consultants. The form emphasizes the importance of compliance with specifications and the contractor's obligations regardless of inspection outcomes.

Uploaded by

harkanwarsingh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
166 views1 page

WIR Format

The document is an Inspection Request (IR) form used by contractors to request inspections for various construction aspects, including structural, electrical, and plumbing works. It outlines the necessary details such as inspection dates, relevant drawings, and required approvals from associated divisions and consultants. The form emphasizes the importance of compliance with specifications and the contractor's obligations regardless of inspection outcomes.

Uploaded by

harkanwarsingh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

INSPECTION REQUEST (IR)

Contract No: IR Submission Date:

From M/s. IR Ref: Rev:


Mu-IR & MRIR Ref No.
Preceding IR Ref No:

IR Details
Structure Electrical Fire fighting Lifts
Masonry / Plaster Mechanical Landscaping Survey
Architectural Plumbing Earthworks and Sewers Others:_________

IR Subject:
Block & Location of Inspection :
Specifications Reference/ Relevant Drawings :
Description of works to be Inspected (attached highlighted copy of the relevant drawing)

Inspection Date : Scheduled Inspection Date & Time:


Submitted by : Date: Time :
Received by : Date: Time :

Clearance from associated divisions of Contractor:


Position Comments Signature Date & Time
Civil
Survey
Electrical
Plumbing
HVAC
Fire fighting
Any other (Specify)
Confirmation of QA / QC Inspection
Confirmation of coordination and compliance with specifications, approved drawings, Method Statement and Quality Control plan
Note : If "No" Recorded Below any deviation from the QA/QC requirement, specifications, approved drawings, method
Yes No statement and contract document
.
Comments:

Non Conformity and /or reference to attached Non Conformity report (NCR) NCR # _______________ Date:

Signed by Contractor's QA/QC Engineer __________________________ Date:

Consultants Inspection :
Comments:

(A) Approved

Consultant Name : Position: (B) Approved with comments

Signature : Date & time : (C) Rejected

Project Manager Review and Comments

Title: Signature: Date&Time:

1) A completed IR by Contractor to be Submitted to Project Manager by 48 hrs Prior to the planned time of Inspection.
2) Internal QA/QC Team to insure all compliance and signoff prior to Actual Inspection.
3) Consultant to Inspect if required and return to Project Manager Immediately.
4) Inspecting Checking and approval by the Consultant and Project Manager shall not relieve the contractor from his any obligations to perform the work
in accordance with the contract documents and Local Authorities regulations.

Sheet: 1 of 1