Doc no -
PROCEDURE FORHANDLING                           Org Date -01.04.17
              MANAGEMENT                                 Rev no - 00
                                                         Page no   - 1 of 2
                       13.0 Handling Management
     Purpose: To ensure bin/trolley condition, packing material, quantity and
     timely availability to achieve consistency in quality and delivery.
     SCOPE: It cover all Bins &Trolleys, all products available in plant.
     Responsibility:
 S
      Activity                   Responsibility                     Frequency
 N
      Bin and trolley
 1                               Plant Head/Dispatch Head           Daily
      Management
 2    Packing standards          Plant Head/ Dispatch Head          -
     Procedure:
     Bin and Trolley Management
              a. Make a list of type of bins/trolleys being used with their qty
                 (FCI/HM/01).
              b. Allocate the number to each bin/trolley and identify storage
                 space.
              c. Make the list of wear part item of each bin/trolley type.
              d. Make inspection check sheet for every bin/ trolley, and assign
                 responsibility to check Daily.
              e. Review trolley quantity, Monthly, based on the customer’s future
                 requirement and arrange trolleys accordingly.
              f. Take counter measure for repetitive problems and modify trolleys
                 accordingly & maintain record in Bin Cleaning & Disposal
                 Monitoring Report (FCI/HM/06).
     Packing standards
                    a. Make packing standard for every product being delivered to
                       customer, having details about packing material,
                       transportation mode & display (FCI/HM/15).
     Communication:
SN          Output                    To           Frequency       Record     Retenti
                                                                                1
                                                  Doc no -
          PROCEDURE FORHANDLING                   Org Date -01.04.17
               MANAGEMENT                         Rev no - 00
                                                  Page no   - 2 of 2
                                                                         on
     Bin cleaning Daily        Maintenance
 1                                            Monthly                  01years
     Check sheet.                 head
     Trolley cleaning Check    Maintenance
 2                                            Monthly                  01years
     sheet.                       head
                               Maintenance
 3   Bin calculation sheet                    Monthly                  01years
                                  head
                               Maintenance
 4   Bin summary sheet                        Monthly                  01 year
                                  head
     Bin & trolley cleaning    Maintenance
 5                                            Monthly                  01 year
     monitoring report            head
 6   Packing standards         Quality Head   Monthly                  03 years
     Trolley cleaning check    Maintenance
 7                                             Daily                   03 years
     points                       head
     Bin cleaning check        Maintenance
 8                                             Daily                   01 year
     points                       head
     Bin & Trolley cleaning    Maintenance
 9                                             Daily                   01 year
     Instruction                  head
Prepared by-                  Approved by-
Date:                         Date:                     Controlled Copy Stamp
                                                        -