0% found this document useful (0 votes)
27 views1 page

Mep Check List

The document is a MEP checklist for the Al Moosa Building project dated November 19, 2024, prepared by salesman Arun Aravind. It lists various items including smoke detectors, exit lights, heat detectors, thermostats, and AC units along with their quantities and locations. Notably, there are no sprinklers listed, and a note specifies the finished floor level to slab level as 3.2 meters.

Uploaded by

Abubakkar Siddiq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views1 page

Mep Check List

The document is a MEP checklist for the Al Moosa Building project dated November 19, 2024, prepared by salesman Arun Aravind. It lists various items including smoke detectors, exit lights, heat detectors, thermostats, and AC units along with their quantities and locations. Notably, there are no sprinklers listed, and a note specifies the finished floor level to slab level as 3.2 meters.

Uploaded by

Abubakkar Siddiq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT OFFICE NO.

M 05 - AL MOOSA BUILDING @ KARAMA DATE : 19/11/2024


SALESMAN ARUN ARAVIND WBI
MEP CHECK LIST
SI. NO ITEMS QTY LOCATION
1 SMOKE DETECTOR 7 ALL ROOM
2 EXIT LIGHT 1 MAIN DOOR
3 SPRINKLER 0 -
4 HEAT DETECTOR 1 PANTRY
5 THERMOSTAT (DX UNIT -MIDEA) 1 OFFICE RM
6 AC - DX UNIT (MIDEA) 1 TOILET / PANTRY

NOTE : FFL TO SLAP LEVEL - 3.2

You might also like