1.Quote list
Unit price Total
Project Model Stops Qty
USD USD
1 Hydraulic lift THZG002 2/2/2 1 10,500$ 10,500$
To be
Sea cost
confirmed
Total cost Ex works 10,500$
Total amount:ten thousand five hundred dollars, $:10,500
Production period 25-30days.
Price term: Ex works
Beneficiary:Husheng Lift Parts Co.,Ltd.
Bank address:1F, CHINA LIFE ONE CENTER,NO.51,TANGYAN ROAD,HIGH TECH
ZONE,XI'AN
Bank name:CHINA MERCHANTS BANK XIAN BRANCH
SWIFT:CMBCCNBS231
Account number: (USD)129907047032302
(USD)129907047032302
(EUR)129907047035202
(CNY)129907047010803
2
ADD OF BENEFICIARY:Room 1803, 18th floor, unit 1, Xinyuan center, No. 251, Lianhu
District, Xi'an City, Shaanxi Province
3
2.Hydraulic elevator technical specifications
Basic Parameters
1 floor/stops/door 2/2/2
2 Car size
3 Traveling height (mm)
4 Car Height(mm)
5 Load(kg)
6 Way in and out
7 Adaptive voltage 220V/380V
8 Speed 0.25M/S
Lifting system
Name Model Material Qty
4mm checkered
1 countertop panel 45# steel 1
plate
2 countertop frame 50×50×3 45# steel 1
3 rail frame 40×40×3 45# steel /
4 Guide rail T75 T# steel /
Φ100×15mm
5 Bushing 45# steel 2
seamless pipe
6 bearing NSK6206 6206 2/4
7 Rail guide shoe Roller guide shoe 45# steel 4
8 support tube Φ80×7.5mm 45# steel 8
9 guide beam 120×60×4mm Q235C 1
10 Auxiliary support 80×40×4mm Q235C 2
11 boot lining / / 2
12 Chain row chain 16A 2
4
High wear-
13 Steel belt 12corns resistant rubber 2
+ steel core
14 Wire ropes 8×19S+NF-8mm WUXI 4
15 Chain roller Ø120 45# steel 4
16 Governor OX-088 / 2
Hydraulic drive system
Part name Model Qty
3kw-3.75kw 50Hz
1 motor 1
Overload protection Emergency
2 hydraulic pump 1
descent
HSG70/50/1.0t
3 hydraulic cylinder 1
45#
4 High-pressure pipeline 2-12-40MPa 1
5 Hydraulic oil 32# 30L/40L
6 Coupling normal 1
Electrical control system
Part name Model Qty
1 Control System 400*500*200 1
2 Inverter 200M-004G1B-JT 1
3 Mainboard THZG-03 1
4 breaker DZ47SN2C32 1
5 Rail socket DZ47X510 1
6 switching power supply S-200-24 1
7 Insurance seat RT18-32X 2
8 control line RV0.75 RV0.1.5 RV2.5 20
5
9 relay RJ2S-C1-D24 7
10 relay JQX-13F[D]/2Z 1
11 Terminal block TB-2503 1
12 Terminal block SV2-4 50
13 U Guide rail Normal part 1
14 fuse RO15 4
15 UPS power supply VD600A 1
Other parts
Part name Model Material Qty
1 car rear wall stainless steel 304 1
2 car side wall stainless steel 304 2
3 car stainless steel 304 1
Aluminum alloy +
4 door 1.8mm 1
tempered glass
5 Light curtain 917B71 154 2
6
3.Equipment installation method
If you install a traction elevator, you must install a shaft (you can choose our
supporting shaft, or use metal frame or concrete to build the shaft in advance);
If a hydraulic elevator is installed, there is no mandatory requirement, and it
can be installed with or without a shaft.
The aluminum alloy integrated shaft of our company is independently
designed and improved. It takes up less space in the shaft and retains the high
utilization rate of the shaft to the greatest extent. The material is 2.2mm thick
aluminum profile, which has good rigidity and is easy to install. The hoistway is
equipped with a hall door, and the functions include: invisible door closer (can
automatically close the door), hall door electronic lock (when any hall door is
open, the equipment cannot operate; when the equipment is running, all hall
doors are electronically locked; the equipment stops station, the hall door of the
floor where the car stops can be opened, and the rest of the hall doors are locked
to ensure maximum safety), and the function of power on when the door is
opened and power off when the door is closed.
7
4. Sample photo
8
5. Drawing
After client confirmed more details of project, we
make drawing