0% found this document useful (0 votes)
26 views10 pages

FTR11 Merged

The document contains detailed architectural and structural plans for a building project, including site development, floor plans, and reinforcement schedules. It specifies dimensions, materials, and construction methods for various components such as slabs, beams, and footings. The area of the site is noted as 270 square meters.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views10 pages

FTR11 Merged

The document contains detailed architectural and structural plans for a building project, including site development, floor plans, and reinforcement schedules. It specifies dimensions, materials, and construction methods for various components such as slabs, beams, and footings. The area of the site is noted as 270 square meters.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

PAYAO

MAH
PAN PHILIPPINE HIGHWAY

A
RLIK
Area: 270 sq. m
AH
IGH
WAY

VICINITY MAP SITE DEVELOPMENT PLAN


NOT TO SCALE
Area: 270 sq. m

SITE DEVELOPMENT PLAN


VICINITY MAP
NOT TO SCALE
GROUND FLOOR PLAN
2ND-3RD TYPICAL FLOOR PLAN
ROOF DECK PLAN
ROOFING PLAN
0.012 m Ø VERTICAL BARS
4'' CHB wall @ 0.50 m O.C.
SLAB SCHEDULE:
0.012 m Ø HORIZONTAL BARS
EVERY 3 LAYERS OF CHB
REINFORCEMENT
FIN. GRADE LINE
NAME THICKNESS TYPE SHORT PERIOD LONG PERIOD

@ SUPPORT (L/4) @ MIDSPAN (L/2) @SUPPORT (L/4) @ MIDSPAN (L/2)

0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.2m 0.012m Ø BB @ 0.2m 0.012m Ø BB @ 0.25m 0.5m


S-1 0.25m Two way Slab 0.012m Ø BB @ 0.2m 0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.25m 0.012m Ø BB @ 0.2m

0.25m 0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.2m 0.012m Ø BB @ 0.2m 0.012m Ø BB @ 0.25m DEPTH
S-2 One way Slab 0.012m Ø BB @ 0.2m 0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.25m 0.012m Ø BB @ 0.2m

0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.2m 0.012m Ø BB @ 0.2m 0.003-0.012 m Ø CONTINUOUS BARS


0.25m 0.012m Ø BB @ 0.25m
S-3 Two way Slab 0.012m Ø BB @ 0.2m 0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.25m 0.01m Ø LATERAL TIES @ 0.40m O.C.
0.012m Ø BB @ 0.2m
0.2m
0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.2m 0.012m Ø BB @ 0.2m 0.012m Ø BB @ 0.25m
S-4 0.25m Two way Slab
0.012m Ø BB @ 0.2m 0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.25m 0.012m Ø BB @ 0.2m

0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.2m 0.012m Ø BB @ 0.2m 0.012m Ø BB @ 0.25m


0.25m Two way Slab
S-5 0.012m Ø BB @ 0.2m 0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.25m 0.012m Ø BB @ 0.2m 0.075 m SAND GRAVEL

0.25m Two way Slab 0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.2m 0.012m Ø BB @ 0.2m 0.012m Ø BB @ 0.25m WALL FOOTING 1 DETAIL (INSIDE WALL)
S-6 0.012m Ø BB @ 0.2m 0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.25m 0.012m Ø BB @ 0.2m

0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.2m 0.012m Ø BB @ 0.2m


0.25m Two way Slab 0.012m Ø BB @ 0.25m
S-7 0.012m Ø BB @ 0.2m 0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.25m 0.012m Ø BB @ 0.2m

0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.2m 0.012m Ø BB @ 0.2m 0.012m Ø BB @ 0.25m


0.25m Two way Slab
S-8 0.012m Ø BB @ 0.2m 0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.25m 0.012m Ø BB @ 0.2m

0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.2m 0.012m Ø BB @ 0.2m 0.012m Ø BB @ 0.25m


S-9 0.25m Two way Slab
0.012m Ø BB @ 0.2m 0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.25m 0.012m Ø BB @ 0.2m

0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.2m 0.012m Ø BB @ 0.2m 0.012m Ø BB @ 0.25m


S - 10 0.25m Two way Slab
0.012m Ø BB @ 0.2m 0.012m Ø TB @ 0.15m 0.012m Ø BB @ 0.25m 0.012m Ø BB @ 0.2m

S - 11 0.25m Two way Slab 0.012m Ø TB @ 0.15m


0.012m Ø BB @ 0.2m
0.012m Ø BB @ 0.2m
0.012m Ø TB @ 0.15m
0.012m Ø BB @ 0.2m
0.012m Ø BB @ 0.25m
0.012m Ø BB @ 0.25m
0.012m Ø BB @ 0.2m
section f1-c1
STIRRUPS
Y X
TOP BAR (TB)
COLUMN WIDTH COLUMN WIDTH

TOP BARS TOP BARS

STIRRUPS STIRRUPS
h h

BOTTOM BARS BOTTOM BARS

BOTTOM BAR (BB)


d d

BEAM SCHEDULE REINFORCEMENT BEAM SECTION Y-Y @ SUPPORT BEAM SECTION X-X
@ MIDSPAN
Y X

WIDTH (m) DEPTH (m) @ SUPPORT @ MIDSPAN TYPICAL DETAIL OF BEAM


NAME STIRRUPS

0.002-0.016m Ø TB 0.002-0.016m Ø TB
0.012m Ø STIRRUPS 1@ 0.05m
FTB 1 4m 0.25 mm 4 @ 0.1m, REST @ 0.3m

0.002-0.016m Ø TB 0.002-0.016m Ø TB COLUMN SCHEDULE:

0.4m

0.005-0.016m Ø TB 0.002-0.016m Ø TB 0.35m

0.012m Ø STIRRUPS 1@ 0.05m


0.4m
B1 4m 0.25m 3 @ 0.1m, REST @ 0.2m 0.35m

0.003-0.016m Ø BB 0.006-0.016m Ø BB

0.016-0.016m Ø MAIN BAR 0.012-0.016m Ø MAIN BAR


0.004-0.012mm Ø TIES SPACED @ 0.003-0.012m Ø TIES SPACED @
0.2m @ Y-REGION 0.075 m @ Y-REGION
0.3m @ REST 0.3 m @ REST

FOOTING SCHEDULE:

DIMENSIONS
REINFORCEMENT
STRUCTURAL PLAN
NAME DEPTH
LENGHT WIDTH THICKNESS

F1 1m 1m 5m 2.5m 25 pcs-0.012m Ø REBAR, BOTHWAYS, B.B.


FOUNDATION PLAN
2nd-3RD FRAMING PLAN
ROOF DECK FRAMING PLAN