C-1 C-3 C-4 C-5 C-2: Schedule of Column

The document outlines the schedule and details for various column and footing reinforcements in a construction project, specifying sizes, mixes, and reinforcement configurations. It includes information on ring details, reinforcement placement, and foundation specifications for different column types and footings. Additionally, it provides notes on design requirements and reinforcement overlaps for structural integrity.

Uploaded by

MUKESH RAJENDRA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views1 page

C-1 C-3 C-4 C-5 C-2: Schedule of Column

The document outlines the schedule and details for various column and footing reinforcements in a construction project, specifying sizes, mixes, and reinforcement configurations. It includes information on ring details, reinforcement placement, and foundation specifications for different column types and footings. Additionally, it provides notes on design requirements and reinforcement overlaps for structural integrity.

Uploaded by

MUKESH RAJENDRA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SCHEDULE OF COLUMN

RING DETAIL RING DETAIL RING DETAIL RING DETAIL RING DETAIL
SIZE 12" X 18" SIZE 12" X 18" SIZE 9" X 24" SIZE 9" X 24" SIZE 15" X 24"
1 2 2 2
MIX. M-25 1 2 MIX. M-25 1 2 MIX. M-25 1 MIX. M-25 1 2 MIX. M-25 1 2 3
1 2 1 2 1 2 1 3
FIRST FLOOR

TERRACE

8-#16 3 8-#16 3 8-#16 3 3 10-#16 3 8-#20 4


3 3 3 4
TO

REINF. REINF. REINF. REINF. REINF.


--------- 4 4 --------- 4 4 4 4 -------- 4 4 4-#16 5 5
5 5 5 5 5 6 6
RINGS AT 5 RINGS AT 5 RINGS AT 5 RINGS AT RINGS AT
h/4 #8@4"C/C h/4 #8@4"C/C h/4 #8@4"C/C h/4 #8@4"C/C 6 6 h/4 #8@4"C/C 7 7
RINGS AT #8@8"C/C RINGS AT #8@8"C/C RINGS AT #8@8"C/C RINGS AT #8@8"C/C RINGS AT #8@8"C/C
h/2 h/2 h/2 h/2 h/2
RING DETAIL RING DETAIL RING DETAIL RING DETAIL RING DETAIL
SIZE 9" X 18" SIZE 9" X 18" SIZE 9" X 24" SIZE 9" X 24" SIZE 15" X 24"
1 2 2 2
MIX. M-25 1 2 MIX. M-25 1 2 MIX. M-25 1 MIX. M-25 1 2 MIX. M-25 1 2 3
1 2 1 2 1 2 1 3
FIRST FLOOR
FOOTING

8-#16 3 4-#20 3 4-#20 3 3 4-#20 3 8-#20 4


3 3 3 4
TO

REINF. REINF. REINF. REINF. REINF.


4 4 4-#16 4 4 4-#16 4 4 6-#16 4 4 4-#16 5 5
5 5 5 5 5 6 6
RINGS AT 5 RINGS AT 5 RINGS AT 5 RINGS AT RINGS AT
#8@4"C/C #8@4"C/C #8@4"C/C #8@4"C/C 6 #8@4"C/C 7
h/4 h/4 h/4 h/4 6 h/4 7
RINGS AT #8@8"C/C RINGS AT #8@8"C/C RINGS AT #8@8"C/C RINGS AT #8@8"C/C RINGS AT #8@8"C/C
h/2 h/2 h/2 h/2 h/2

COLUMN C-1 C-2 C-3 C-4 C-5

SCHEDULE OF FOOTING
REINFORCEMENT JUNCTION
DEPTH FOUNDATION STEEL BOTTOM FOUNDATION STEEL TOP PEDESTAL STEEL
MARK LENGTH WIDTH
PARALLEL TO PARALLEL TO PARALLEL TO
(L) (B) D TD PARALLEL TO BOTH SIDE COLUMN REINFORCEMENT
SHORTER SIDE LONGER SIDE BOTH SIDE
F-1 6'-0" 6'-6" 1'-3" 2'-6" #12@6" C/C #12@6" C/C #10@7" C/C #10@6" C/C AS PER BEAM DETAIL
Ldt
F-2 6'-6" 7'-0" 1'-6" 2'-6" #12@5" C/C #12@5" C/C #10@7" C/C #10@6" C/C
F-3 8'-0" 9'-0" 1'-3" 2'-3" #12@7" C/C #12@7" C/C #10@7" C/C #10@6" C/C
U TYPE BARS
F-4 8'-0" 9'-0" 1'-6" 2'-6" #12@6" C/C #12@6" C/C #12@7" C/C #10@6" C/C Ldt = DEVELOPMENT LENGTH
IN TENSION
CF-1 AS PER LAYOUT PLAN 1'-3" 2'-6" #12@6" C/C #12@6" C/C #10@7" C/C
CF-2 AS PER LAYOUT PLAN 1'-3" 2'-0" #12@6" C/C #12@8" C/C #10@7" C/C ANCHORAGE OF BEAM BARS
NOTE: APT= AS PER TABLE IN AN EXTERNAL JOINT (DETAIL-A)

9" THICK BRICK WALL

PLINTH LEVEL PLINTH LEVEL


REINFORCEMENT OVERLAP DETAILS
PLINTH BEAM
AS PER DESIGN
BASEMENT FLOOR LEVEL BASEMENT FLOOR LEVEL STEEL COVER
10#@5"C/C 10#@5"C/C
COLUMN
10#@6"C/C 10#@6"C/C AS PER DESIGN
COLUMN FACE
SLOPE
1:6 (MAX.)
5'-6" MIN.

NATURAL GROUND LEVEL NATURAL GROUND LEVEL


LIFT PIT RINGS
FLOOR FINISH LEVEL.
10#@7" C/C B/W BOTH SIDE 10@6"C/C
10#@7" C/C B/W
BOTH SIDE AS PER TABLE LO = NOT LESSER THAN
(A) LARGER LATERAL DIMENSION,
12#@6" C/C B/W BOTH SIDE AS PER TABLE
(B) 1/6 OF CLEAR HEIGHT
SPECIAL CONFINING
1'-3"

(C) 450 MM. REINFORCEMENT PLINTH BEAM


1'-6'' min. 1'-6'' min. 1'-6'' min. 1'-6'' min. DON'T OVERLAP ALL BARS OF COLUMN AT SAME LEVEL AS PER DESIGN
1'-6'' min. 1'-6'' min.

PCC 6" THICKNESS P.C.C. (1:3:6) SPLICE WITH OFFSET CRNKED


6"

BAR IN A COLUMN (DETAIL-B)


12" THK. STONE SOLING B
3" COMPACTED SOIL 3" Ldc
P.C.C. (1:4:8)
12"

20' Ldt
3"
COMPACTED SOIL
3" 24" 3-#20+2-#16 Conti
TYPICAL FOOTING SECTION AT (F-1 TO F-4)
FOOTING SECTION AT A-A (CF-1) 1'-6"
2X2-#12 SIDE FACE 3"
REINFORCEMENT MIN.
30" TYPICAL COLUMN TRANSVERSE
STP. 4L-8"#@6" c/c REINFORCEMENT DETAIL

PCC (1:3:6)
6"
3-#20+2-#16
Conti
RB-1(24"X30")
CROSS SECTION
CON.:- M-25