M   WATER SOURCE
GV
            PIPE                                       HB                                                                                                  PIPE
                                                                       20mm      CWL PIPE
                                                                                                      20mm
                                    WC            FD                                                                                                                         WC         FD
                                 LAV                                                                                                                                      LAV
                                                                                                      CWL PIPE
                                                                                              KSK
                                          GROUND FLOOR                                                                                                                     GROUND FLOOR
                1             W A T E R           L I N E      L A Y O U T                                                                           2             W A T E R      L I N E        L A Y O U T
            1   P-1   SCALE                                                      1:100M                                                          1   P-1   SCALE                                           1:100M
                                                       NOTE:                         PROJECT TITLE & LOCATION:                                                       DRAWNED & SUBMITTED BY:                        SUBMITTED TO:                          SHEET NO.
            Republic of the Philippines                       Submitted in
DAVAO ORIENTAL STATE UNIVERSITY                                   Partial
                                                                                                                                                                                                                                                              15
    A University of Excellence, Innovation, and             Fulfillment of the            CONSTRUCTION OF 2 STOREY RESIDENTIAL BUILDING                                    MARSHALL JAMES G. RAMIREZ                         ENGR. RANDY MANDABON
      Inclusion Valuing Future Generations                   Course ES 121                          NHA, DAHICAN, CITY OF MATI, DAVAO ORIENTAL                                               STUDENT                                INSTRUCTOR               P-1
                 www.dorsu.edu.ph                              (Computer
                                                              Aided Design)
                                                                                                                                   TO MAIN STREET DRAINAGE
                                                                                SEPTIC                       SEPTIC
                                                                                VAULT                        VAULT
                                                                                                                                                             CB
                                                                                                    OUTLET
             DOWN PIPE                                                                                                                                                                       DOWN PIPE
                                      WC          FD                                                                                                                                                          WC        FD
                                   LAV                                                                                                                                                                      LAV
                                                                                                                      100mm
                                                                                                                      SEWER PIPE
                                                                                              KSK
                                                                                                                                   TO MAIN STREET DRAINAGE
                                                                                                                                                             CB
                                            GROUND FLOOR
                  1      SEWER/DRAINAGE LINE LAYOUT PLAN
              1   P-2    SCALE                                                  1:100M
                                                                                                                                                                                                                   SECOND FLOOR
                                                                                                                                                                                             2       SEWER/DRAINAGE LINE LAYOUT PLAN
                                                                                                                                                                                         1    P-2   SCALE                                          1:100M
                                                       NOTE:                      PROJECT TITLE & LOCATION:                                                   DRAWNED & SUBMITTED BY:                                 SUBMITTED TO:                         SHEET NO.
            Republic of the Philippines                      Submitted in
DAVAO ORIENTAL STATE UNIVERSITY                                  Partial
                                                                                                                                                                                                                                                               16
    A University of Excellence, Innovation, and            Fulfillment of the            CONSTRUCTION OF 2 STOREY RESIDENTIAL BUILDING                              MARSHALL JAMES G. RAMIREZ                                  ENGR. RANDY MANDABON
      Inclusion Valuing Future Generations                  Course ES 121                            NHA, DAHICAN, CITY OF MATI, DAVAO ORIENTAL                                    STUDENT                                            INSTRUCTOR              P-2
                 www.dorsu.edu.ph                             (Computer
                                                             Aided Design)
                                                                                                     3800
                                                                      1600                                 1100                       1100
                                                                                                                                                                                                                                              1000
  10mm
  SP. @ 200mm O.C. B. W.                                                                                                                                                                                                                       800
  600mm X 600mm X 100mm THK
  CONCRETE COVER                          1000
              BAR HANDLE                                                                                                                                                                                                                                            50mm THK CONCRETE COVER
                                                                                                                                                                                                                1000
                                                                                                                                                                                                                              800
                                                                                                                                                                   100mm THK CHB WALL,
                                                                                                                                                                   SMOOTH PLASTER FINISH
                                                                                                                                                                                                                                                                   100mm THK CHB WALL
                                                                                                    PLAN
                                                                                                                                                                                                                                            PLAN
                                                                                                     3800
                                                                     1600                                1100                        1100
                                                                                                                                                                                                                                                                  50mm THK CONCRETE COVER
100mm THK CONCRETE COVER
                                                                                                                                                                                                                              100
                                                           CO        MH                                     MH                         MH
                                                                                                                                                                                                                                                                  EVERY TWO LAYERS OF CHB
                                                                                                                                                                                                                       1100
                                                                   AIR SPACE                           AIR SPACE                    AIR SPACE
                                   INLET                                                                                                                                                                                                                          @ 600mm O.C
                                                                                                                                                                     OUTLET
                                                                                                                                                                                                                              100
     100mm THK CHB WALL,
     SMOOTH PLASTER FINISH                                                                                                                                                                                                                                        100mm THK CHB WALL
                                                                                                                                                            1500
                                                                                                                                                            1700
                                                                                                                                                                                                                                                                  50mm THK CONCRETE BASE
                                                                                                                                                                                                                                                                  50mm THK GRAVEL BED
     EVERY 3 LAYERS OF CHB
                                                                   DIGESTIVE                            LEACHING                   LEACHING
                                                                   CHAMBER                              CHAMBER                    CHAMBER
                                                                                                                                                                                                                                          SECTION
      SP. @ 0.60m O.C.
                                                                   SLUDGE PIT                                                                                                                                     2             CATCH BASIN DETAIL
                                                                                                                                                                                                             1         P-3      SCALE                                           NTS
  SP. @ 200mm O.C.B.W.                                                                                                                                                         100mm THK GRAVEL BASE
                                                                                          SECTION
                                                                           1            SEPTIC VAULT DETAIL
                                                                       1   P-3          SCALE                                            NTS
                                                                       NOTE:                         PROJECT TITLE & LOCATION:                                                DRAWNED & SUBMITTED BY:                               SUBMITTED TO:                                       SHEET NO.
                             Republic of the Philippines                         Submitted in
              DAVAO ORIENTAL STATE UNIVERSITY                                        Partial
                                                                                                                                                                                                                                                                                            17
                     A University of Excellence, Innovation, and               Fulfillment of the      CONSTRUCTION OF 2 STOREY RESIDENTIAL BUILDING                                MARSHALL JAMES G. RAMIREZ                                ENGR. RANDY MANDABON
                       Inclusion Valuing Future Generations                     Course ES 121                       NHA, DAHICAN, CITY OF MATI, DAVAO ORIENTAL                                     STUDENT                                           INSTRUCTOR                             P-3
                                  www.dorsu.edu.ph                                (Computer
                                                                                 Aided Design)
                                                                                                                                    Soil, Waste, Drain and Vent Pipes
GENERAL PLUMBING NOTES
                                                                                                                             1.     INSTALL ALL PLUMBING WORKS IN CONFORMITY WITH ALL PROVISIONS OF THE LATEST EDITION OF THE
                                                                                                                                    PHILIPPINE PLUMBING CODE AND APPLICABLE REQUIREMENTS OF EXISTING LOCAL CODES.                      LEGENDS AND SYMBOLS
           REQUIREMENTS OF THE PHILIPPINE NATIONAL PLUMBING CODE AND THE RULES AND
     REGULATIONS OF THE EXISTING LOCAL CODES AND ORDINANCES. NOTHING CONTAINED IN THE                                         2.    EXCAVATE TO REQUIRED DEPTHS AND GRADES ALL EXCAVATIONS REQUIRED FOR THE INSTALLATION OF                      SYMBOL      DESCRIPTION
     DRAWING SHALL BE CONSTRUED AND CONFLICT WITH THE NATIONAL AND LOCAL ORDINANCE                                                  PLUMBING AND DRAINAGE SYSTEM. WHEN ROCK IS ENCOUNTERED, EXTEND EXCAVATION TO A DEPTH OF
                                                                                                                                                                                                                                                  FAU        FAUCET
     OR LAW GOVERNING THE IMPLEMENTATION OF THE PLUMBING WORKS.                                                                     150mm BELOW THE PIPE BOTTOM.
                                                                                                                                                                                                                                                  KSK        KITCHEN SINK
2.   REFER TO ALL ELECTRICAL, STRUCTURAL AND ARCHITECTURAL PLANS AND SPECIFICATIONS                                           3.    LAY WATER SUPPLY PIPES AND SEWER IN SEPARATE TRENCHES
                                                                                                                                                                                                                                                  WC         WATER CLOSET
     AND INVESTIGATE ALL POSSIBLE INTERFERENCES AND CONDITIONS AFFECTING PLUMBING
     WORKS.                                                                                                                         Joint Fittings                                                                                                CV         CHECK VALVE
                                                                                                                                                                                                                                                  GV         GATE VALVE
3.   IT IS NOT INTENDED THAT DRAWINGS SHALL SHOW EVERY PIPE FITTING, VALVE AND OTHER                                         1.     MAKE ALL JOINTS WATER TIGHT. FOR JOINING PIPES, USE THE FOLLOWING:
     APPURTENANCES . FURNISH AND INSTALL IF NECESSARY, ALL ITEMS WHETHER SPECIFICALLY                                                                                                                                                             FD         FLOOR DRAIN
     MENTIONED OR NOT, OR INDICATED IN THE DRAWINGS, TO COMPLETE THE SYSTEM IN                                                      a. CEMENT PIPES
                                                                                                                                                                                                                                                  LAV        LAVATORY
     ACCORDANCE WITH THE BEST PRACTICE OF THE PLUMBING TRADE AND TO THE ENTIRE                                                        GROUT WITH CEMENT , MIX ALL AROUND THE JOINTS IN A CONSISTENT MANNER. DO NOT ALLOW GROUT
     SATISFACTION OF THE SANITARY ENGINEER.                                                                                           TO BULGE INSIDE PIPE INTERIORS.                                                                             HB         HOSE BIBB. CWL
                                                                                                                                                                                                                                                  CO         CLEAN OUT
4.   PERFORM ALL LABOR IN A FIRST CLASS AND NEAT WORKMANSHIP BY SPECIALIST SKILLED IN                                               b.uPVC PIPES
     THEIR TRADES. SUCH SPECIALISTS AND THEIR WORK SHALL BE TO THE ENTIRE SATISFACTION                                               USE APPROPRIATE COUPLINGS AND GLUE AT JOINTS.                                                                M          WATER METER
     OF THE SANITARY ENGINEER.                                                                                                                                                                                                                    CB         CATCH BASIN
                                                                                                                                    c.FUSIO THERM/FUSION WELD PIPES
     Basic Materials                                                                                                                 USE APPROPRIATE FUSION WELD MACHINES AT JOINTS.                                                              DS         DOWN SPOUT
1.   PROVIDE MATERIALS THAT ARE NEW AND AND IN CONFORMITY WITH THE MATERIAL                                                         Cleanouts
                                                                                                                                                                                                                                           2     LEGENDS AND SYMBOLS
     SPECIFICATIONS AS REQUIRED BY THE ARCHITECT/SANITARY ENGINEER IN-CHARGE.                                                                                                                                                          1   P-4   S C A L E               N T S
                                                                                                                             1.     FOR CLEANOUTS STEAMING FROM CAST IRON BELL AND SPIGOT PIPES OR uPVC SUBSTITUTES THEREOF,
2.   FOR THE OTHER REQUIRED MISCELLANEOUS MATERIALS NOT SPECIFICALLY MENTIONED,                                                     PROVIDE WITH LONG QUARTER BEND OR ONE OR TWO EIGHT BENDS EXTENDED TO AN EASILY
     PROVIDE THE BEST OF ITS KIND.                                                                                                  ACCESSIBLE PLACE AND GENERALLY WHERE INDICATED IN THE DRAWING.
3.   SUBMIT SAMPLES OF MATERIALS FOR APPROVAL AS REQUIRED BY THE ARCHITECT/SANITARY                                                 Traps
     ENGINEER IN-CHARGE.
                                                                                                                             1.     EXCEPT FOR THE PRESENCE OF GREASE INTERCEPTOR AND OTHER DEVICES WHERE TRAP IS AN
4.   CONFORM ALL APPLICABLE PIPES AND MATERIALS FOR VARIOUS SERVICES TO THE STANDARDS                                               INTEGRAL PART OF THE DESIGN, EQUIP WITH A TRAP EVERY FIXTURE WHERE INDICATED IN THE
     OUTLINED BELOW.                                                                                                                DRAWING.
     Plumbing Fixtures                                                                                                        2.    SET EACH TRAP AS CLOSE AS POSSIBLE TO THE FIXTURE SERVED AND RENDER LEVEL WITH RESPECT TO
                                                                                                                                    THEIR WATER SEAL.
1.   INSTALL ALL PLUMBING FIXTURES FREE AND OPEN IN A MANNER TO ACCESS FOR CLEANING,
     FURNISH WITH BRACKET,S, CLEATS, PLATES AND ANCHORS REQUIRED TO SUPPORT       THE                                               Others
     FIXTURE RIGIDLY IN PLACE.
                                                                                                                             1.     PIPE SHALL BE INSTALLED AS INDICATED. ANY RELOCATION REQUIRED FOR PROPER EXECUTION OF
2.                                                                             1
     VEER AWAY AT A SUFFICIENT DISTANCE, BUT NOT LESS THAN INCH (12.7mm), ALL SERVICE
                                                                               2
                                                                                                                                    OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF THE SANITARY ENGINEER IN-CHARGE.
     PIPES, VALVES AND FITTINGS FROM SURFACES AND LOCATIONS WHICH MAY REQUIRE FINISH
     COAT OR COVERING.                                                                                                        2.    PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH AND INVERT
                                                                                                                                    ELEVATIONS.
3.   EXTEND THE PIPING TO ALL FIXTURES, OUTLETS AND EQUIPMENT FROM REQUIRED GATE
     VALVES INSTALLED IN EACH BRANCH NEAR RISERS.                                                                             3.    ALL FIXTURES SHALL BE VENTED UNLESS OTHERWISE INDICATED.
     Shut-offs                                                                            4. AIR CHAMBER: ALL INDIVIDUAL BRANCHES TO THE FIXTURE OR GROUP OF FIXTURES AND/OR EQUIPMENT
1.   PROVIDE ENTIRE SYSTEM WITH VALVES SO LOCATED THAT THE SYSTEM OR PORTIONS OF IT           SHALL BE PROVIDED WITH AIR CHAMBER WITH CAPPED VERTICAL PIP EXTENSION OR DIMENSIONS.
     CAN BE OPERATED, REPAIRED AND REPLACED AS WELL AS AFFORDING COMPLETE CONTROL OF
     THE WATER SUPPLY TO EACH GROUP FIXTURES. WHEN REQUIRED, PROVIDE ALSO PRESSURE        5. WHERE BRACH CURVES MORE THAN ONE FIXTURE INCREASE SIZE OF BRANCH PROPORTIONATELY.
     REDUCING VALVES.                                                      GENERAL NOTES AND SPECIFICATION
                                                                                                    1
                                                                                                1   P-4   S C A L E                          N T S
                                                                       NOTE:                            PROJECT TITLE & LOCATION:                                         DRAWNED & SUBMITTED BY:                      SUBMITTED TO:                                       SHEET NO.
                                 Republic of the Philippines                 Submitted in
                 DAVAO ORIENTAL STATE UNIVERSITY                                 Partial
                                                                                                                                                                                                                                                                                 18
                         A University of Excellence, Innovation, and       Fulfillment of the             CONSTRUCTION OF 2 STOREY RESIDENTIAL BUILDING                         MARSHALL JAMES G. RAMIREZ                        ENGR. RANDY MANDABON
                           Inclusion Valuing Future Generations             Course ES 121                              NHA, DAHICAN, CITY OF MATI, DAVAO ORIENTAL                              STUDENT                                 INSTRUCTOR                                P-4
                                      www.dorsu.edu.ph                        (Computer
                                                                             Aided Design)