Contractor Name:                                                               SAFE PLAN OF ACTION                         08A WMI-SPA-JSA Form.pdf           PROJECT NO.
___________
  Job/Task:                                                               Work Area:                                                                                         Date:
The following Tasks will include the “OSHA Big Four”:                    ✔   Falls/Elevated Work,           ✔   Struck By,     ✔   Caught In/Between, ✔ Electrical
          Steps of Task                             Hazard/Reaction to Change                                              Safe Plan                                             Resources
  TEAM MEMBERS’ SIGNATURES
  The signature of the supervisor confirms the completion of the hazard assessment and Safe Plan of Action by the crew.
  Supervisors Signature:                                                                                        Reviewed By PM/CM:____________________________________
  INSTRUCTIONS: 1. Write name of the job or task in the space provided. 2. Conduct a walk-through survey of work area. 3. Write the steps of the task in a safe sequence. 4. List all possible hazards
  involved in each step and reaction to change. 5. In the Safe Plan column, state the actions that will be taken to prevent the hazards and injury from reaction to failure. 6. In the Resources column, list
  safety equipment and tools, etc. needed to do the job. 7. Ask each team member, who helped develop and will use this SPA, to sign in the spaces provided. 8. Review the SPA at the end of the task for
  improvements. 9. PM/CM/CA will review and sign the SPA. 10. Other Foremen and Visitors review and acknowledge with initials in the lower margin potential Hazards and Controls in the work space
  NOTE: Work shall stop when conditions change, the job changes, or a deficiency in the plan is discovered, and the current SPA will be modified or a new SPA created.
  Foremen and Visitors Acknowledgement Initials: _____________________________________________________________________________________________________________________
                                               Safe Plan of Action Checklist (check all that apply)
       Review checklist while completing back page Safe Plan of Action A new SPA is required if the job scope or work conditions change.
                Required Permits                          Hazards                                                                  Safe Plan
       Confined Space                        Overhead Utilities                       Power de-energization required Insulation blankets required Wire watcher
       Critical Lift                                                                   requiredRequired clearance distance = _______Ft.  Safe work zone marked
       Hot Work                              Crane or other                            Signalman assigned  Tag lines in use  Area around crane barricaded
       Lock Out/Tag Out                            Lifting Equipment                    Lifting equipment inspected  Personnel protected from overhead load
       Soil Disturbance (Over 12”)           Underground Utilities                    Reviewed as-builts  Subsurface surveys  Received dig permit 
       Utility Clearance                                                               Required clearance distance = _______ Ft.             Safe work zone Marked
                   Required PPE                Electrical                                Lock Out/Tag Out/Try Out  Permit required?  Confirm that equipment is de-
       Hard Hat, Class C                                                               energized  Reviewed electrical safety procedures 
       Hard Hat, Class E (Elect. Protect)    Excavations                               Permits  Inspected prior to entering  Proper sloping/shoring 
       Ear Plugs/Ear Muffs                                                              Barricades provided  Access/egress provided  Protection from accumulated water
Eye Protection:                                Fire Hazard                               Hot Work Permit  Fire Extinguishers  Fire watch 
       Safety Glasses                                                                   Adjacent area protected  Unnecessary flammable material removed 
       Face Shield                           Vehicular Traffic or                      Traffic Barricades  Cones  Signs  Flagmen  Lane closure
       Chemical Goggles                            Heavy Equipment                      Communication with equipment operator 
       Welding Hood                          Noise >85 dB                             Hearing protection is required:  Ear plugs  Ear Muffs  Both
Hand Protection:                               Hand & Power Tools:                       Inspect general cond.  GFCI in use  Identified PPE required for each tool
       Cut Resistant Gloves                                                             Reviewed safety requirements in operators manual(s)  Guarding OK 
       Welders Gloves                        Hand Hazards                             List sharp tools, material, equipment: ____________________________________
       Nitrile Globes                                                                   PPE gloves, etc.  Protected sharp edges as necessary
       Surgical Gloves                       Manual Lifting                            Reviewed proper lifting tech.  Identified material requiring lifting equipment
       Rubber Gloves                                                                    Hand protection required  Back support belts 
       Elect. Insulated Gloves               Ladders                                   Inspect general cond. before use  Ladder inspected within last quarter 
       Arm Sleeves                                                                      Ladder tied off or held  Proper angle and placement  Reviewed ladder safety
Foot Protection:                               Scaffolds                                Inspect general condition before useTags in place Properly secured 
       Sturdy Work Boots                                                               Toe boards used  Footings adequate  Materials properly stored on scaffold
       Safety Toe Boots                      Slips, Trips Falls                        Inspect for trip hazards  Hazards marked  Tools & material properly stored
       Rubber Boots                                                                     Extension cords properly secured  Work zone free of debris 
       Rubber Boot Covers                    Pinch Points                             List potential pinch points: _________________________________________________
                                                                                                                        fitting the pipe together, man lift, moving material
       Dielectric Footwear                                                              Working near operating equipment  Hand/Body positioning
Respiratory. Protection:                             Working w/ Chemicals                 The task creates potential for direct contact with hazardous chemicals.
                                                                                          Reviewed MSDS hazards and precautions  Have proper containers and labels.
       Dust Mask                                                                        Have identified proper PPE (respirators, clothing, gloves, etc.)
       Air Purifying Respirator              Heat Stress Potential                     Heat stress monitoring (>85o) Liquids available  Cool down periods
       Supplied Air Respirator                                                          Sun Screen  Reviewed Heat Stress symptoms 
       SCBA                                  Cold Stress Potential                     Proper clothing (i.e.. gloves, coat, coveralls)  Wind chill <32o
       Emergency Escape Respirator                                                      Reviewed Cold Stress symptoms  Warm up periods 
                                                     Environmental                        Air emissions  Water discharge  Hazardous wastes  Other wastes 
Special Clothing:
                                                                                          Pollution prévention Waste minimisation
        Tyvek ®                               Natural or Site Hazards                  Weather Terrain Adjacent operations or processes Biological hazards
       Poly Coated Tyvek ®                                                             Animals/reptiles/insects hazards
       Fire Resistant Coveralls              Adjacent Work/Processes                  Notified them of our presents Other workers adjacent, above, or below.
        Rain Suit                                    and/or co occupancy                Coordinated with adjacent work supervisor/customer operator Can work safely
       Safety Vest                                                                      Caution barricade tape required Danger barricade tape required Rigid
                                               Barricades/covers                        railing required
Fall Protection:                                                                          Covers over opening Warning signs required
 Double Lanyard Required                                                    SANITATION / FOOD SAFETY FOR CONSTRUCTION
 Anchorage Point Avalable                             Pre-Construction Risk Assessment completed per Contractor Work Rules
      Additional Anchorage Connector Needed             Requirements of Food Safety for Construction & Major Maintenance Activities are included and adopted for the work
      e.g. Cross Arm Strap, etc.                       Segregate construction from open product and other activities within the facility
    Retractable Device Needed                        Atomizing dust or water
    Horizontal Life Line System Req’d.               Microbiological Risk
    Fall Clearance Distance Adequate                 Equipment / material being transported thru facility
    Fall Rescue/Retrieval Plan Set Up                Waste contained
                                                      Work done on potable water meets applicable codes
                                                      Hollow areas sealed / no niches
  Y   Does project affect Combustible Dust             Wood not mobilized into the construction area
  N   system?                                          Pipe and conduit mobilized into the construction area is clean (ID & OD) and capped
                                                      Construction materials have appropriate packaging
      Design reviewed & approved by                    Sanitizing Protocol
      GE Technical Services                            Personal Hygiene
                                                 
                                                                                       82