0% found this document useful (0 votes)
276 views2 pages

Asjc Fdas Matrix 1

The document outlines the operational sequence for the fire detection and alarm system at the AMAIA Steps Junction-Clara Building. It details the activation and deactivation procedures for various alarms, elevators, and fans, as well as the locations of smoke detectors and manual pull stations. Additionally, it includes a legend for activation times and system inputs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
276 views2 pages

Asjc Fdas Matrix 1

The document outlines the operational sequence for the fire detection and alarm system at the AMAIA Steps Junction-Clara Building. It details the activation and deactivation procedures for various alarms, elevators, and fans, as well as the locations of smoke detectors and manual pull stations. Additionally, it includes a legend for activation times and system inputs.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

AMAIA STEPS JUNCTION-CLARA BUILDING

Activate Lift Pressurization


Activate Supervisory Alarm

Activate Supervisory Alarm

Activate Alternate Elevator

De-activate General Alarm

De-activate Positive Alarm


Activate Fire Alarm buzzer

Activate Fire Alarm Horn

Activate SPF & LPF when


Floor, 1 Down (optional)
Activate Fire Alarm Base

Elevator Recall 1st Floor


De-activate Designated
Activate General Alarm
Activate Positive Alarm
Activate Trouble Alarm

Activate Trouble Alarm

De-activate Fire Alarm

Sequence 2 UP, Active

Sequence 2 UP, Active


De-activate Fire Alarm

De-activate Fire Alarm

De-activate Alternate
Activate Designated
Elevator Recall GF
Activate Fire Alarm

Pressurization Fan

Pressurization Fan

Pressurization Fan

Elevator Recall GF
indicator on FACP

indicator on FACP

indicator on FACP

indicator on FACP
SYSTEM OUTPUT

De-activate Stair

SD duct is active
Recall 2nd Floor
buzzer on FACP

buzzer on FACP

buzzer on FACP

De-activate Lift
Activate Stair
Horn Strobe

Sounder
on FACP
FIRE DETECTION AND ALARM SYSTEM SEQUENCE OF

Strobe

Fan
OPERATION MATRIX

SYSTEM INPUTS LOCATION A B C D E F G H I J K L M N O P Q R S U V X Y Z


1 Smoke Detectors (Adressable) Ground Flr; LVSG RM/Telco
Rm/EE Rm/Elevator Lobby
2 Smoke Detectors (Conventional) 2nd - 12th Floor; Hallway/EE
Rm/Aux. Rm
3 Manual Pull Station (Addressable) Ground Floor

4 Manual Pull Station (Addressable) 2nd - 12th Floor

5 Smoke Detectors (Conventional) 2nd - 12th Residential Floor (Units)

6 Smoke Detectors (Conventional) Roofdeck SPF Room

7 Smoke Detectors (Addressable) Within 2nd - 12th Floor; Hallway


3mtrs at Fire exit
8 Duct Smoke Detectors (Addressable) Roofdeck (LPF,SPF)

9 Water Flow Switch 2nd - 12th Floor;

10 Water Flow Switch Ground Floor

11 Tamper Switch Ground - 12th Floor

12 FACP AC power failure GF Elevator Lobby

13 FACP low battery GF Elevator Lobby

14 FACP Open Circuit GF Elevator Lobby

15 FACP General Alarm (Drill) GF Elevator Lobby

16 FACP Reset GF Elevator Lobby

17 FACP Ack/Panel Silence GF Elevator Lobby

18 Override Switch GF Elevator Lobby

A B C D E F G H I J K L M N P R S U V X Y Z
LEGEND:

Prepared by: - Activated in 0 Seconds


MAGNAXA - Activated in 15 Seconds
- Activated in 180 Seconds

You might also like