CURRICULUM VITAE
NAME :- DIPANKAR MONDAL
POSITION :- SENIOR SURVEY ENGINEER
PH NO- 8116770048,8900012185
MAIL ID:- dipankar.engineer1@outlook.com
Profile
A Professional Survey Engineer with more than 5 years of experience in India.
Always willing to innovate the new things which can be improve the existing
technology. Always able to produce best result in pressure situation, good team
player & excellent communication skill to reach out team, client & to make out
best output with less resources & manpower.
Sector Of Expertise – Surveying work in Infrastructure & Highway Projects,
(5+Years Experience)
Education
Diploma In Survey Engineering ( July 2016 – June 2019)
West Bengal Survey Institute,(W.B.S.C.T.E.V.S.E.D)(76%)
12TH
Boinchi B.L.M.Free Institution(W.B.C.H.S.E) (69%)
10th
Boinchi B.L.M.Free Institution (W.B.B.S.E) (52%)
Technical Skills
Total Station – Trimble,Leica 07 plus, Leica 06,Sokkia CX,FX--Models,
Topcon
Level Machine- Auto Level,Digital Level
Software Used- AutoCad , Trimble Business Centre(TBC),Road Estimator,Surfer,
Autolisps, SW DTM ,Google Earth, Excel , Word,Power point Etc.
Employment-
Survey Engineer (September 2024 to Till Date)
KSSR Infra Projects Pvt Ltd
Construction of new BG line including S&T works & general electrical services
between Lokapur (excl) – Yadwad (incl) from Km. 39/000 to Km. 60/000 (21 Km)
in Bagalkot-Kudachi new line project.
Client- South Western Railway
Responsibilities-
Traversing work in Coordinate method & use of Auto level for level Traverse.
Maintaining all setting out & as built data of piling, pile cap alignment, pier &
pier cap alignment, pedestal & bearing setting out ,Erection work setting out &
as built data, utility survey works. Taking acceptances & approval from the
clients before starting the work & maintain 100% quality with zero
accident.Earthwork Quantity Calculation for Sub-Contractor Billing,Topography
work, taking ngl .Taking ogl, Centerline marking,Preparing bed of embankment
,Subgrade, Blanket, as per typical cross section, Layout marking of all structures.
Preparing grade sheet of all layers ,Using AutoCAD for Setout of
co-ordinate,preparing L section & cross sections .
Senior Surveyor (December 2022 – September 2024)
HG Infra Engineering Limited
Development of an Access-Controlled Six lane Expressway from Meerut to
Prayagraj"Ganga Expressway" Group-II From Km.137+600 (Village:Nagla
Barah,Distt:Badaun) To Km.289+300,(Village: Ubariya khurd,Distt:Hardoi) Design
Length=151.700 Km.
Client –UP Expressway Industrial Development Authority
Responsibilities-
Traversing by distance co-ordinate method, traversing data calculation & error
distribution, Site Calibration by Trimble SCS900 And Preparation of Design for Trimble
Sensor Grader by Trimble Business Center(TBC), ROW marking ,TBM traversing,
Preparation of Setting out Data for all types of structure like Major
Bridge,FOB,ROB,MNB,VUP,Box Culverts, Drain etc By AutoCad. Topography work, Taking
NGL ,Taking OGL, Centerline Marking, Setting out of all types of structures (Sub
Structure & Super Structure) Pile,Pile Cap,Pier,Pier Cap,Pedestal &
Bearing,MNB,VUP,Erection.Maintaining all setting out & as built data.Taking
acceptances & approval from the clients before starting the work & maintain 100%
quality with zero accident.Preparations of all layer FRL sheet and tolerance sheet for
highway.
Surveyor (September 2021-November 2022)
NKG Infrastructure Limited
IISER Berhampur Campus With Proposed Road,Odisha
Client – Central Public Work Department (CPWD)
Responsibilities-
Traversing by distance co ordinate method, traversing data calculation & error
distribution,tbm traversing, topography work, Taking NGL .Taking ogl,
Centerline, Outer edge & Inner edge marking of Carriageway ,Preparing bed of
Embankment ,Subgrade, Granular Sub Base, Wet Mix Macadem, DBM,BC as per
typical cross section, Layout marking of all structures,Highway Preparing grade
sheet of all layers ,Using AutoCAD for finding co-ordinate, Total Station Data
import & export to excel to AutoCAD & preparing L section & cross sections .
Preparing KMZ/KML files using Global mapper & Google earth pro.
Survey Engineer (March 2021 to Auguest 2021)
R.B Ghodke Infrastructure Pvt Ltd
1-Improvement of Road from Washim to Pusad road km 242+200 to
298+249(Section of SH 51 Washim to Pusad Shivaji Chowk) In District of Washim
& YavatmalYavatmal, Maharashtra (EPC-5).
2-Construction of Approaches to Road Over Bridge(R.O.B) on Changefal
Mathargaon Khamgaon Road. at RailwayCH. 545/13-14 level crossing No. J.K6
(S.H.222) District -Buldhana
Client- PWD Yavatmal, Maharashtra
Responsibilities-
Traversing work in angle distance method & use of digital level for level
Traverse. Maintaining all setting out & as built data of piling, pile cap alignment,
pier & pier cap alignment, pedestal & bearing setting out ,Erection work setting
out & as built data, utility survey works. Taking acceptances & approval from
the clients before starting the work & maintain 100% quality with zero
accident.,TBM traversing, topography work, taking ngl .Taking ogl, Centerline,
outer edge & inner edge marking of carriageway ,Preparing bed of embankment
,Subgrade, Granular sub base, Wet mix macadem, BC as per typical cross
section, Layout marking of all structures,Highway Preparing grade sheet of all
layers ,Using AutoCAD for finding co-ordinate, Total Station Data import &
export to excel to AutoCAD & preparing L section & cross sections .
Assistant Surveyor
Sushee Infra & Mining Limited( February 2020 to March 2021)
Hunli - Anini Road Project NH 313 (92.500 to 120.000) 2-Laining on EPC Basis in
the state of Arunachal Pradesh under SARDP-NE
Client- NHIDCL
Responsibilities
Center line marking,layout marking of culvdert,retaining wall,minor & major
bridges ,row marking, toe marking ,subgrade,gsb,wmm,bc top levelling work &
inner & outer edge marking.Fixing gradient & camber as per drawing for bed
preparation ,after approval from client for tough hilly terrain, highway
supervision etc.
Assistant Survey Engineer
ATCON India Limited ( April 2019 to January 2020)
Up-gradation to two lane with paved shoulder /four lane configuration for the
work From km. 109+790 to km. 163+050 of Nilajphata to Bhandara Section
(length 53.26 kms.) of NH -247 in the state of Maharashtra on EPC Mode.
Client- NHPWD
Responsibilities
Center line marking, TBM traversing, topography work, taking ngl .Taking ogl
layout marking of culvdert,retaining wall,HPC ,MNB ,ROW marking, toe
marking ,Subgrade,GSB,DLC,PQC levelling work.
Personal Details
Dipankar Mondal
C/o – Khokan Mondal
Gender – Male
D.O.B - 04/02/1998
Boinchigram Saradapally, Boinchigram,Pandua,Hooghly,712135,WB
Declaration -I do hereby would like to state that all the above
details are true to my knowledge.
Date – 09.10.2024
Place- Lokapur,Karnataka Dipankar Mondal
Signature