It No Description Unit Quantity RATE AMOUNT
SPECIFICATION AND BILL OF QUANTITIES
TOILET
MEASUREMENT CERTIFICATE NO 2
A. SUB STRUCTURE
1 Excavation and Earth Works ................ Birr
2 Concrete Works .................................
Birr
3 Masonry Works ..................................
Birr
Total A .......... Birr
B. SUPER STRUCTURE
1 Concrete Works ................................Birr
2 Blockwork……………….………………… Birr
3 Roofing ………………………………………Birr
4 Carpentry and Joinery……………… Birr
5 Metal work …………………………… Birr
7 Finishing ………………………………… Birr
9 Painting…………………………………… Birr
10 Sanitary Installation………………… Birr
Total B ………………. Birr
Total A +B for one unit………………..Birr
SPECIFICATION&BILL OF
UNIT QNT RATE AMOUNT
QUANTITY of toilet
1.01 clear the Site to remove the top
soil to an average depth of 20cm.
m2 92.00
1.02 Bulk excavation to reduce levels
to a depth of 50cm starting from
reduced G.L.(P.Q.)
m3 37.00
1.03 Trench excavtion for msonary
foundation to a debth of 100cm
m3 21.50
1.04 Pit excavation for footing to a
debth of 150cm
m3 31.00
1.05 Dito but to a debth of 4m (size
170cm*170cm
m3 60.00
1.06 Excavation for septic tank to a
depth of 4m starting from
m3 160.00
reduced G.L.( size 5m*8m )
1.07 Back fill with selected material
and compact at a layer of 20cm :
A / around foundation wall
m3 25.00
B/ around Septic tank wall
m3 42.00
C/ Around footing pad
m3 88.00
1.08 Cart away excavated material as
per the instruction of the Engineer
m3
328.00
25cm thick basaltic or equivalent
stone hard core well rolled ,
m2 28.00
consolideted and blinded with
TOTAL
crushed stone CARRIED TO SUMMARY…
2. CONCRETE WORKS
2.01 50 mm C-5 lean concrete,
minimum cement content 150
kg/m3 Under,
a) under masonary m2 15.00
b) footing pad m2 12.00
c) botom slab
m2 28.00
2.02 C-25 Reinforced concrete,
minimum cement content of 320
kg/m3 filled in to form work and
vibrated around Steel
reinforcement (formwork and
reinforcement measured
separately)
a) footing pad
m3 3.50
b) botom slab 15cm thick m3 4.20
c) In footing column m3 1.65
d) In Ground floor beams.
m3 1.30
e) In 20mm floor slab m 3
5.60
f) 100MM thick mass concrete
floor . m2 10.00
f) 100MM thick sheer wall
concrete for septic tank partition
wall use ø10mm . m2 28.00
2.03 Provide, cut and fix in position
sawn Zigba wood or steel
formwork which ever appropriate
a) footing pad m2 1.50
b) botom slab 15cm thick m2 4.50
c) In footing column m2 32.00
d) In Ground floor beams. m2 9.50
e) To floor slab . m2 32.50
f)for sheer wall m2 56.00
2.04 Mild steel reinforcement according
to structural drawings. Price
includes cutting, bending, placing
in position and tying wire.
a) dia 14 mm deformed bar kg 225.00
b) dia 12 mm deformed bar kg 138.00
c) dia 10 mm deformed bar kg 985.00
d) dia 6 mm plain bar kg 78.00
TOTAL CARRIED TO SUMMARY…
3. MASONRY & H C B WORKS
3.01 An average 60cm thick hard
trachytic or eqivalent stone
massonry foundation wall for
septic tank bedded in cement sand
mortar(1:3).below G L m3 48.00
3.02 50cm thick hard trachytic or
eqivalent stone massonry
foundation wall bedded in cement
sand mortar(1:3).below G. L m3 8.90
3.03
Dito but above G.L.
m3 5.30
TOTAL CARRIED TO SUMMARY…
B-SUPER STRUCTURE
C-25 1. CONCRETE
Reinforced WORKS
concrete,
1.01 minimum cement content of 320
kg/m3 filled in to form work and
vibrated around Steel
reinforcement (formwork and
reinforcement measured
separately)
a) In elevation columns m3 0.96
b) In top tie beams m3 0.61
c)In rotto stand : size 3.2*3.2*.2m m3 1.92
1.02 Provide, cut and fix in position
sawn Zigba wood or steel
formwork which ever appropriate.
a) In elevation columns m2 1.70
b) In top tie beams m2 1.50
c)In rotto stand : size 3.2*3.2*.2m m2 12.40
1.03 Mild steel reinforcement according
to structural drawings. Price
includes cutting, bending, placing
in position and tying wire .
a) dia 6 mm plain bar kg 135.00
b) dia.12mm deformed bar kg 276.00
c) 6Ø dia.14mm deformed bar for water
stand use 6 Ø14 for column & Ø12 for stand
slab
kg 273.00
TOTAL CARRIED TO SUMMARY…
2. BLOCK WORK
2.01
200mm thick Class B HCB(cover of
RC column) which can satisfy the
designed strength , bedded in
cement sand mortar (1:3).Price
shall include mortar bed .
m2 125.44
2.03
Ditto but 15cm HCB
m2 85.00
TOTAL CARRIED TO SUMMARY…
3. ROOFING
3.01 Roof cover in G30 C.I.S nailed to
Zigba purlins,Price shall include
ridge cover and roof measured in
horizontal projection.. m2 76.00
3.02 G-28 galvanized flat metal sheet
gutter with development length 60
cm also apply 2 coats of oil paint ml 21.00
3.03
supply & fix down pipe made of
PVC size f110dm price include all
acceceries &work. ml 30.00
TOTAL CARRIED TO SUMMARY…
4. CARPENTRY & JOINERY
4.01 Supply, assemble and mount Φ
100mm eucalyptus wooden
upper ,Lower ,vertical &horizontal
truss members as per the detail
drawing. Price shall include anti ml 205.00
4.02 Supply and fix 50x70 mm Zigba
wood purlin as per the detail
drawing . Price shall include anti
termite treatment and all other
necessary accessories. ml 118.00
4.03 Supply and fix fascia board
250x25mm. Price includes one
coat primer and two coats of oil
paint and other necessary activity
needed to complete the work.
ml 28.00
4.04 Supply and fix chip wood ceilings
as per the engineers approval.
Price shall include 40 x 50 mm
Zigba wood battens with c/c
spacing of 600 mm both ways,
middle and corner list, and all
other necessary accessories. m2 54.00
TOTAL CARRIED TO SUMMARY…
5. METAL WORK
5.10 Metal windows and doors
manufactured from 38X1mm LTZ
frame profile and 0.8 mm thick
ribbed sheet all as per the
engineers approval and window
door schedule. Unit price shall
include: 6mm thick clear glass for
louvers, louver blade & NACO
louver holder , two coats of anti
rust and three coats of synthetic
enamel paint, approved quality
cylindrical lock, hinges, manila and
any other accessories to complete
5.01 DOORS & WINDOWS
D1 size: 960x2100mm No 2.00
D2 size: 700x2100mm No 10.00
W1 size: 700x280mm No 2.00
W2 size: 700x2050mm No 2.00
W3 size: 710 *1180mm No 2.00
TOTAL CARRIED TO SUMMARY…
7. FINISHING
7.01 Apply three coats of plastering in
cement sand mortar (1:3). Price
shall include pre-cleaning and
preparation of the surface.
a) To internal wall surface m2 250.00
b) Ditto but for septic tank wall
m2 56.00
c) Ditto but for septic tank
masonery wall m2 88.00
d) Apply three coats of plastering
in cement sand mortar externaly. m2 87.00
7.02 50 mm thick smooth finished
cement sand screed(1:3) floor
finish .All as per engineers
instruction. Price shall include
cementsand screed skirting as per
the drawing. m2 54.00
TOTAL CARRIED TO SUMMARY…
6. Glazing
Supply and fix 4 mm thick clear
glass glazing as per the detail
8.5
drawing. Price shall include
approved quality of putty. m²
9. PAINTING
9.01 Apply three coats of plastic paint
to internal plastered wall surface. m² 250.00
9.02 Ditto but to external pointed wall
surface. m² 56.00
Ditto but to fcia board surface. m² 7.00
TOTAL CARRIED TO SUMMARY…
10. SANITARY INSTALLATION
SANITARY FIXTURES & FITTINGS
10.01 Supply & fix Tabor ceramic hand
wash basins made from white
vitreous china complete with
concealed fixing bracket, plugs,
chains smell traps, flexible pipe
cold water taps, adapters, etc.
Size 405*500 mm No. 6.00
10.2
Supply and fix wash down water
closet made of white vitreous china
with plastic seat and cover
including low flush cistern and stop
cock on the water supply line
complete with all accessories.
Supply and fix toilet paper holder
with metal roller 150x150x25mm
complete with fastening screws. No 6.00
Supply & fix Tabor ceramic soap
10.3
holders
Supply & fix complete
enamaled with
castfixing
iron
accessories
shower try completed withcrome No. 6.00
10.04 plated arm valve and adjustable
shower head No 4.00
10.5
Supply and fix crystal glass mirror
where appropriate including
chrome plated brass mirrors, clips
and screws. Size 500x400 No 4.00
10.6 Supply and install Galvanized
Steel Pipes for cold water
distribution to all sanitary fixtures
according to the drawing
complete with the necessary
pieces such as tees, bends,unions,
etc. The unit price shall include all
necessary assistance to the
installation works such as supports
for horizontal & vertical pipes,
chiseling of walls, slabs, beams,
floors, etc. and closing them with
concrete or cement mortar to
normal condition. The installation
shall be tested at a pressure of 10
kg/scm at the expense of the
contractor.
a) Diameter 15 mm m.l 85.00
b) Diameter
Supply & 20fix mm
Gate Valves of m.l 45.00
10.7 approved quality complete with
unions, hand wheels etc.
a)Diameter 15 mm No. 18.00
b)Diameter 20 mm No. 4.00
Supply & fix 10,000Lt(10
10.8 m3)ROTTO water tanker with all
acessaries N0 1.00
Supply and install soil, waste
10.9 and vent pipe in horizontal
branches and vertical stacks
made of rigid plastic pipes
(PVC) of approved standard
including the necessary
fittings such as bends, Y,T
clean outs, increasing and
reducing pipes with tight
joints as shown on the
drawing. All horizontal branch
pipes shall be laid in a slope
of 2%. Unit price shall include
all the necessary masonry
assistance such as chiseling of
walls, slabs, beams, floors,
etc. And closing them with
concrete or cement mortar. No 6.00
10.1 Supply and fix floor drains
made of enameled cast iron
with smell trap complete with
all the accessories. Dia
50mm. No 13.00
Supply and fix vent caps
made of rigid PVC to be
connected to the roof terminal
of vent pipe.Dia 50mm
Supply and install rigid plastic
pipes (PVC) of approved
standard including the
necessary fittings
a) 50mm ml 35.00
b) 75mm ml 25.00
TOTAL CARRIED TO SUMMARY…
11. ELECTRICAL INSTALLATION
All distribution boards, breakers,
switches, accessories etc, should
be genuine legrand, ABB, siemens
or approved equivalents complying
with IEC standards distribution
boards, should be made of sheet
metal (PVC Boards) and have
separate neutral and ground bus
bars/phase bars. All units in the
distribution boards should be
labeled to give the reference and
duty of the unit.
11.01 Flush mounted main distribution
MDB in sheet steel enclosure with
lockable door. Bus bar rating of
32A/1Ph, Earthling lead and with
all its accessories and enough
ample space for future expansion
consisting
1pc m.c.b of:-
of 25A/1ph
5pcs m.c.b of 16A/1ph
4pcs m.c.b of 10A/1ph
No 1.00
11.02 Flush mounted main distribution
CMDB in sheet steel enclosure
with lockable door. Bus bar rating
of 50A/3ph, Earthling lead and
with all its accessories and
enough ample space for future
expansion consisting of:-
1pcs m.c.b of 25A/1ph
2pcs m.c.b of 16A/1ph
3pcs m.c.b of 10A/1ph No 1.00
LIGHT POINT
11.02 Surface mounted light point fed
through PVC insulated copper
conductor of 2x2.5 sg.mm inside
No
PVC conduit of 13mm diameter
including junction boxes with
covers, insulating screw caps etc. 16.00
LIGHTING FITTINGS
11.3 Philips TMX 204 1 x 36W IC No 6.00
11.4 RZB 56120.00X + RZB 05-5615 +
No
60W Lamp 10.00
SOCKET OUTLETS
Socket outlet of 16A/1ph,
11.5 LEGRANDE 74131 + frame 10921,
fed through PVC sheathed flexible
wire of 3x2.5 Sq.mm inside DLT No
Trunking LEGRAND 10412
80x50mm. All for surface 6.00
mounting.
EARTHING SYSTEM
11.6 Base copper wire of 16 Sq.mm ML 20.00
TOTAL CARRIED TO SUMMARY..............
GRAND TOTAL