Tangkad Billing No. 2

The document outlines the proposed realigned Bill of Quantities (BOQ) for the installation of roughing-ins in Sierra Valley Tower 2, detailing labor costs and material quantities for various floors. It includes a breakdown of costs for general requirements, installation of materials, fabrication of fittings, and guidewiring, with completion percentages for each item. The grand total for the project is ₱500,000.00, with a total accomplishment to date of ₱341,924.30.

Uploaded by

Wellmarck alipao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views1 page

Tangkad Billing No. 2

The document outlines the proposed realigned Bill of Quantities (BOQ) for the installation of roughing-ins in Sierra Valley Tower 2, detailing labor costs and material quantities for various floors. It includes a breakdown of costs for general requirements, installation of materials, fabrication of fittings, and guidewiring, with completion percentages for each item. The grand total for the project is ₱500,000.00, with a total accomplishment to date of ₱341,924.30.

Uploaded by

Wellmarck alipao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project : SIERRA VALLEY

Subject : Installation of Roughing-Ins for Typical Floors


Date : October 19, 2023
PROPOSED REALIGNED BOQ
SIERRA VALLEY TOWER 2 PFI EVALUATION PB-003
Unit Cost PREVIOUS THIS PERIOD TO DATE
Item Particulars Qty Unit Amount Php
Labor ACCOMPLISHMENT ACCOMPLISHMENT ACCOMPLISHMENT
% AMOUNT % AMOUNT % AMOUNT
I. General Requirments
1 Quarters & Utilities 1 lot ₱ 32,000.00 ₱ 32,000.00 70% ₱ 22,400.00 - 70% ₱ 22,400.00
2 Christmas Incentive/Benefits 1 lot ₱ 40,000.00 ₱ 40,000.00 30% ₱ 12,000.00 30% 12,000.00 60% ₱ 24,000.00
Sub-Total A ₱ 72,000.00 ₱ 72,000.00 48% ₱ 34,400.00 17% 12,000.00 64% ₱ 46,400.00
5th Floor
I. Installation of Roughing-Ins Materials
1 15mmØ PVC Pipe 1450 lgt. ₱ 35.50 ₱ 51,475.00 100% ₱ 51,475.00 0% ₱ - 100% ₱ 51,475.00
2 20mmØ PVC Pipe 100 lgt. ₱ 53.06 ₱ 5,306.00 100% ₱ 5,306.00 0% ₱ - 100% ₱ 5,306.00
3 15mmØ IMC Pipe 116 lgt. ₱ 71.50 ₱ 8,294.00 100% ₱ 8,294.00 0% ₱ - 100% ₱ 8,294.00
4 Junction Box 275 pcs. ₱ 13.00 ₱ 3,575.00 100% ₱ 3,575.00 0% ₱ - 100% ₱ 3,575.00
5 Square Box 48 pcs. ₱ 23.00 ₱ 1,104.00 100% ₱ 1,104.00 0% ₱ - 100% ₱ 1,104.00
Sub-Total I ₱ 69,754.00 ₱ 69,754.00 ₱ - ₱ 69,754.00
II. Fabrication of PVC Fittings,Elbow & Boxes 1 lot ₱ 25,000.00 ₱ 25,000.00 100% ₱ 25,000.00 0% ₱ - 100% ₱ 25,000.00
Pouring Guard 1 lot ₱ 5,000.00 ₱ 5,000.00 100% ₱ 5,000.00 0% ₱ - 100% ₱ 5,000.00
Sub-Total II ₱ 30,000.00 ₱ 30,000.00 ₱ - ₱ 30,000.00
III. Guidewiring
1 Inside Units 1 lot ₱ 5,000.00 ₱ 5,000.00 - -

2 Common Areas ( Hallway,Stair,EE. Room,Aux. Room & Utility Room )


1 lot ₱ 2,246.00 ₱ 2,246.00 - -
Sub-Total III ₱ 7,246.00 - -
SUB-TOTAL B ₱ 107,000.00 93% ₱ 99,754.00 0% ₱ - 93% ₱ 99,754.00
6Th Floor
I. Installation of Roughing-Ins Materials
1 15mmØ PVC Pipe 1450 lgt. ₱ 35.50 ₱ 51,475.00 100% ₱ 51,475.00 0% ₱ - 100% ₱ 51,475.00
2 20mmØ PVC Pipe 100 lgt. ₱ 53.06 ₱ 5,306.00 100% ₱ 5,306.00 0% ₱ - 100% ₱ 5,306.00
3 15mmØ IMC Pipe 116 lgt. ₱ 71.50 ₱ 8,294.00 100% ₱ 8,294.00 0% ₱ - 100% ₱ 8,294.00
4 Junction Box 275 pcs. ₱ 13.00 ₱ 3,575.00 100% ₱ 3,575.00 0% ₱ - 100% ₱ 3,575.00
5 Square Box 48 pcs. ₱ 23.00 ₱ 1,104.00 100% ₱ 1,104.00 0% ₱ - 100% ₱ 1,104.00
Sub-Total I ₱ 69,754.00 ₱ 69,754.00 ₱ - ₱ 69,754.00
II. Fabrication of PVC Fittings,Elbow & Boxes 1 lot ₱ 25,000.00 ₱ 25,000.00 100% ₱ 25,000.00 0% ₱ - 100% ₱ 25,000.00
Pouring Guard 1 lot ₱ 5,000.00 ₱ 5,000.00 100% ₱ 5,000.00 0% ₱ - 100% ₱ 5,000.00
Sub-Total II ₱ 30,000.00 ₱ 30,000.00 ₱ - ₱ 30,000.00
III. Guidewiring
1 Inside Units 1 lot ₱ 5,000.00 ₱ 5,000.00 - -

2 Common Areas ( Hallway,Stair,EE. Room,Aux. Room & Utility Room )


1 lot ₱ 2,246.00 ₱ 2,246.00 - -
Sub-Total III ₱ 7,246.00 - -
SUB-TOTAL C ₱ 107,000.00 93% 99,754.00 0% ₱ - 93% ₱ 99,754.00
7Th Floor
I. Installation of Roughing-Ins Materials
1 15mmØ PVC Pipe 1450 lgt. ₱ 35.50 ₱ 51,475.00 95% 48,901.25 48,901.25
2 20mmØ PVC Pipe 100 lgt. ₱ 53.06 ₱ 5,306.00 95% 5,040.70 5,040.70
3 15mmØ IMC Pipe 116 lgt. ₱ 71.50 ₱ 8,294.00 95% 7,879.30 7,879.30
4 Junction Box 275 pcs. ₱ 13.00 ₱ 3,575.00 95% 3,396.25 3,396.25
5 Square Box 48 pcs. ₱ 23.00 ₱ 1,104.00 95% 1,048.80 1,048.80
Sub-Total I ₱ 69,754.00 66,266.30 66,266.30
II. Fabrication of PVC Fittings,Elbow & Boxes 1 lot ₱ 25,000.00 ₱ 25,000.00 100% 25,000.00 25,000.00
Pouring Guard 1 lot ₱ 5,000.00 ₱ 5,000.00 95% 4,750.00 4,750.00
Sub-Total II ₱ 30,000.00 29,750.00 29,750.00
III. Guidewiring
1 Inside Units 1 lot ₱ 5,000.00 ₱ 5,000.00 - -

2 Common Areas ( Hallway,Stair,EE. Room,Aux. Room & Utility Room )


1 lot ₱ 2,246.00 ₱ 2,246.00 - -
Sub-Total III ₱ 7,246.00 - -
SUB-TOTAL D ₱ 107,000.00 90% 96,016.30 90% 96,016.30
8Th Floor
I. Installation of Roughing-Ins Materials
1 15mmØ PVC Pipe 1450 lgt. ₱ 35.50 ₱ 51,475.00 - -
2 20mmØ PVC Pipe 100 lgt. ₱ 53.06 ₱ 5,306.00 - -
3 15mmØ IMC Pipe 116 lgt. ₱ 71.50 ₱ 8,294.00 - -
4 Junction Box 275 pcs. ₱ 13.00 ₱ 3,575.00 - -
5 Square Box 48 pcs. ₱ 23.00 ₱ 1,104.00 - -
Sub-Total I ₱ 69,754.00 - -
II. Fabrication of PVC Fittings,Elbow & Boxes 1 lot ₱ 25,000.00 ₱ 25,000.00 - -
Pouring Guard 1 lot ₱ 5,000.00 ₱ 5,000.00 - -
Sub-Total II ₱ 30,000.00 - -
III. Guidewiring
1 Inside Units 1 lot ₱ 5,000.00 ₱ 5,000.00 - -
2 Common Areas ( Hallway,Stair,EE. Room,Aux. Room & Utility Room )
1 lot ₱ 2,246.00 ₱ 2,246.00 - -
Sub-Total III ₱ 7,246.00 - -
SUB-TOTAL E ₱ 107,000.00 - -
GRAND TOTAL ₱ 500,000.00 47% ₱ 233,908.00 22% 108,016.30 68% 341,924.30

EVALUATED BY:

BENSON JIRO POSADAS ARNEL BESORIO LOURENCE LABID


PROJECT ENGINEER FOREMAN SUB-CONTRACTOR