GW HT 100 136k User Manual en
GW HT 100 136k User Manual en
SolarGo APP SEMS Portal App SEMS Portal website Offical Website
GOODWE (China)
Franciscusdreef 42C, 3565AC Utrecht, the Netherlands 6 Dunhams Court, Dunhams Lane, Letchworth
T: +31 (0) 30 737 1140 Garden City, SG6 1WB UK
sales@goodwe.com T:+ 44 (0) 333 358 3184
service.nl@goodwe.com enquiries@goodwe.com.uk / service@goodwe.com.uk
1202, G-Square Business Park, Sector 30A, Opp. Sanpada Via Cesare Braico 61, 72100 Brindisi, Italy
Railway Stn., Vashi, Navi Mumbai- 400703 T: +39 338 879 38 81; +39 831 162 35 52
T: +91 (0) 2249746788 valter.pische@goodwe.com (sales)
sales@goodwe.com / service.in@goodwe.com operazioni@topsenergy.com; goodwe@arsimp.it (service)
Adalet Mah. Megapol Tower K: 9 No: 110 Bayraklı - Izmir Level 14, 380 St. Kilda Road, Melbourne,
T: +90 (232) 935 68 18 Victoria, 3004, Australia
info@goodwe.com.tr T: +61 (0) 3 9918 3905
service@goodwe.com.tr sales@goodwe.com / service.au@goodwe.com
Photovoltaic
Nuevo Leon, Mexico, C.P. 64290 Seocho-gu Seoul Korea (06792)
T: +52 1 81 2871 2871 T: 82 (2) 3497 1066
Grid-Tie Inverter
sales@goodwe.com / soporte.latam@goodwe.com sales@goodwe.com / Larry.Kim@goodwe.com
Rev.1.2
2020/12/28
Note: The above contact information is subject to change without notice. For details, refer to the
company's official website www.goodwe.com
1 Symbol Definition .................................................................................................... 01
8 Maintenance .................................................................................................................... 31
8.1 Clean Fan... ................................................................................................................................. 31
Recyclable • The inverter must be installed and maintained by professionals in accordance with local
standards and regulations.
• Before installing and maintaining the inverter, the DC input and AC grid must be disconnected
from the inverter, and the inverter must not be touched for at least 5 minutes after disconnec-
Danger of high voltage, avoid electric shock tion to prevent electric shock.
• The local temperature on some parts of the inverter may exceed 60°C during operation. Do not
touch it to avoid burns.
• All electrical installations must comply with local electrical standards.The inverter must only be
This side shall be upside, do not tilt connected to the grid by professionals and only after obtaining permission from the local power
supply authority.
• The inverter must be installed in a location that is out of reach of children.
Hot surface, do not touch • Appropriate anti-static measures must be taken.
• Without authorization, do not remove the upper cover, and do not touch or replace other
components except the wiring terminals, otherwise GOODWE will not be responsible for any
4
personal injury or damage to the inverter.
Stacking limit, up to 4 layers can be stacked • Ensure that the DC input voltage is less than the maximum input voltage of the inverter,
otherwise the inverter will be damaged. GOODWE will not be responsible for this damage, and
the warranty will be void.
The product must not be disposed of as ordinary waste, • PV strings generate high-voltage direct current under sunlight. This step must be done following
but must be recycled by special methods our company's instructions, otherwise it may cause some protection measures to fail and
endanger personal safety.
• Do not plug or unplug the DC and AC connectors when the inverter is operating.
Fragile items, handle with care • The IP66 requires that the machine is completely sealed. Install the machine within one day
after unpacking. Otherwise, seal off the unconnected port to protect the machine against water
and dust ingress.
• If the solar inverter is not to be used immediately, please ensure that the storage environment
Avoid humidity meets the following requirements:
1. Do not remove the outer package;
2. Recommended storage temperature: -40℃~70℃; recommended storage humidity: 0%~100%
See operating instructions (no condensation);
3. Stored in a clean and dry place and protected from dust and water vapor;
4. Maximum 4 layers stacked allowed;
After power off, wait 5 minutes to ensure that the machine is fully
5. Regular check is required. If any rodent bites are found, replace the packing materials
discharged immediately.
5min
6. After a long-term storage, the inverter needs to be inspected and tested by professionals
before putting into use.
CE mark
7. During a long-term storage, the inverter has to be covered with a rainproof cloth to prevent
the package from corrosion.
01 02
3 Product Introduction
Supported grid structure:
The grid structures supported by HT series 100K/110K/120K are TN-S, TN-C, TN-C-S, TT, IT, as
GW136K-HTH PE PE
PE PE PE PE PE
A B C D
Communication
If an isolation transformer is not used on the output side of the inverter to connect to Inverter Back hanger terminal
Positive/Negative DC
connector [1] Bluetooth[2]
the power grid, neither the PV+ nor the PV- input terminal of the inverter can be
connected to the ground.
Item Type Notes
04
Text materials[4]
03
[1] DC connector*: 20 pairs for 100kw, 24 pairs for 110kw&120kw&136kw. GW100K-HT Bottom view
[2] Optional module.
[3] The number of accessories is subject to change without notice.
[4] Text materials*: Include manuals.
After opening the package, check the product to confirm whether it is consistent with the
No. Name Description
specifications of the inverter you purchased. The appearance of the product is shown in the
diagram. The layout of the inverter ports of different powers will differ. Used to safely disconnect the DC input as required. When the
input and output meet the requirements, the inverter will run
Left view Front view(without LCD) Right view automatically. Turning the DC switch to the "OFF" position
1 DC switch
8 will immediately cut off the DC input. You need to turn the DC
10
10 switch to the "ON" position before starting the inverter.
7
7 2 DC terminal Used to connect PV strings.
5
8
Used to connect the communication module so that the
6 3 Communication module inverter can use the corresponding communication method.
9
11
10 10 4 RS485 communication port Used to connect data monitoring and other equipment.
1 2 1 3 4 5
05 06
4 Equipment Installation 4.3 Inverter Installation
4.3.1 Wall Installation Procedure:
4.1 Installation Instructions
• The installation height shall be parallel to the line of sight for easy operation and maintenance. Step 1: Use the back hanger for Step 2: Use the expansion screws in the
• The inverter must be installed away from flammable and explosive materials. positioning. Drill holes in the wall with a accessory pack to fix the back plate on
• The inverter must be installed in a place with high signal strength to ensure that there is no diameter of 13mm and a depth of 65mm. the wall.
strong electromagnetic interference or obstructions locally. The spacing of the holes is shown in the
diagram below. 889mm
• The parameter labels and warning signs must be clearly visible after the inverter is installed.
• The installation location of the inverter shall avoid sunlight, rain, and snow.
255mm
Oblong hole 12x18
Avoid sunlight Avoid rain Avoid snow Sunlight Rain Snow Expansion tube Back hanger Screw
Minimum 10°
More than 500mm Step 4:
Method 1: Installers hold the handles and hang the inverter on the back hanger.
• To ensure good heat dissipation and easy disassembly, the minimum clearance around the inverter
must not be less than the following values, as shown in the diagram below.
>600mm
>50mm
>600mm
07 08
4.3.2 Bracket Installation Procedures: 4.4 Electrical Installation
4.4.1 AC Terminal Connection
1. Measure the voltage and frequency of the grid-tie connection point to confirm that it meets the
grid-tie specifications of the inverter.
Step 1: Use the back hanger for Step 2: Use the expansion screws in the
2. It is recommended to add a circuit breaker or fuse on the AC side, whose specification shall be
positioning. Drill holes in the wall with a accessory pack to fix the back plate on
more than 1.25 times the rated current of the AC output.
diameter of 13mm and a depth of 65mm. the wall.
3. The PE wire (ground wire) of the inverter must be reliably grounded.
The spacing of the holes is shown in the 4. Disconnect the circuit breaker or fuse of the inverter and the grid-tie connection point.
diagram below. 889mm 5. It is recommended to use copper wire. If you need to use aluminium wire, consult the inverter
manufacturer.
6. Follow the steps below to connect the utility service and the inverter.
Note: Do not connect copper blocks with aluminum wires. Otherwise electrochemical
255mm
S
a b c d
SPE
D D
A2 D+3mm Specification: M12 Specification: M8
Heat shrink tube
Size: a≤45mm, Size: c≤30mm,
13.0mm≤b≤15.5mm 8.4mm≤d≤11.0mm
OT terminal
09 10
Step 7: Tighten the screws and place firefighting mud before installing the cover.
Step 4: Remove cover of the AC junction Step 5: Place half of the crimping module in
box with a M5 hex wrench. the cap of the AC junction box, while the
other half in the box.
Step 6: Connect AC cables to the terminal block, and settle the AC cables to the designated
crimping module.
L1
L1/L2/L3/N
L2
(M12)Tightening
L3
Torque
N
25~30 N.m
PE (M8)
PE Tightening
Torque
7~9 N.m
11 12
4.4.2 AC circuit breaker and leakage current protection device
To ensure that the inverter can be safely and reliably disconnected from the grid, install a circuit Step 2: Take the DC terminal from the accessory pack, turn the nut to remove it, and take
breaker for the inverter as a protection device. out the waterproof rubber ring.
Inverter model Max. Output Current (A) Recommended circuit breaker specifications Positive
Note: Multiple inverters are not allowed to share one circuit breaker.
The internal leakage current detection device of the inverter can detect the external leakage Step 3: Insert the stripped DC cable through the nut and waterproof rubber ring.
current in real time. When the leakage current exceeds the limit value, the inverter is quickly
disconnected from the grid. If leakage current protection device is installed externally, the action Positive
current of a single inverter shall be 1000mA or higher.
2. Ensure that the PV string polarity matches the DC connector, otherwise the inverter will be
damaged.
3. Ensure that the maximum open circuit voltage of each PV string is not higher than the
maximum input voltage of the inverter under any circumstances. Step 4: Connect the lead part of the DC cable to the metal DC terminal and crimp it with a
4. The DC connector provided by our company must be used. special DC terminal tool.
5. The positive and negative poles of the PV string must not be connected to the PE wire (ground Crimp
wire), otherwise the inverter will be damaged. MC4 and QC4.10 series
6. The unused PV terminal must be reliably sealed off with waterproof plugs. Positive
There are four types of DC connector - DEVALAN series, MC4 series, AMPHENOL H4 series, QC4.10
series.
Negative
13 14
4.4.4 External Ground Terminal Connection
Step 5: Insert the crimped DC cable into the DC terminal, then insert the waterproof rubber According to EN50178 requirements, the inverter must have a protective ground connection. The
ring into the DC terminal and tighten the nut. user must connect this terminal to a protective ground wire while installing the equipment. Follow
the steps below to complete the ground connection.
Positive
Step 1: Select the appropriate cable and strip the outer sheath of the wire to an appropriate
length. For the right length, refer to the ground terminal in the accessory pack.
Negative L1 A
No. Name Description
B A Ground terminal M8
B Yellow-green line
C C Cross-sectional area
Step 2: Insert the stripped wire into the terminal, and then crimp it with pliers.
Step 6: Connect the wired DC terminals to the inverter as shown in the diagram.
Step 3:
To improve the corrosion resistance of the ground terminal after the grounding cable is
installed, it is recommended to apply silica gel to the terminal as anti-corrosion treatment.
15 16
4.5 Communication Installation Step 2: Choose RS485 shielded twisted pair wire and strip it as shown in the diagram below,
then connect the terminal and crimp it tightly.
4.5.1 RS485 communication 6.5mm
This function is only applicable to RS485 models.
The RS485 port of the inverter is used to connect to the data collector, and the total length of the
connecting cable must not exceed 1000m.
25mm
The communication cable must be separated from other power lines to avoid communication
interference.
The RS485 wiring method is shown in the diagram.
Router
PC terminal Step 3: Insert the RS485 shielded twisted pair cable through the communication terminal
RS485 RS485 RS485 LAN as shown in the diagram below, and connect it to the corresponding port according to the
wiring sequence. Then assemble the terminals and tighten them.
If multiple inverters are connected together and they are connected to the data logger, the
maximum number of inverters connected in the daisy chain is 60.
Complete the RS485 communication connection according to the following steps.
Step 1: Take the communication terminal from the accessory pack and disassemble it as
Step 4: Connect the communication terminal
shown in the diagram.
Waterproof rubber ring to the inverter COM2.
Nut
17 18
4.5.2 WiFi Communication 4.5.4 Cloud Monitoring
This function is only applicable to inverters with WiFi communication function. The installation After the communication configuration is completed, scan the QR code on the back of this
method of WiFi communication module is shown in the diagram below. manual or visit www.sems.com.cn. Download the goodwe.cloudview APP and complete the
Note: The communication module must be aligned and inserted vertically into the communica- registration to use the cloud monitoring function.
tion terminal, otherwise the communication module and communication terminal may be
4.6 Romote Shutdown
damaged.
Control
room
1≤N≤20
Step1:Insert the romote shutdown shielded twisted pair cable through the communica-
tion terminal as shown in the diagram below, and connect it to the corresponding port
according to the wiring sequence. Then assemble the terminals and tighten them.
After the installation, confirm whether the indicator on the module is on.
If the indicator is off, the module needs to be unplugged and installed again.
To remove the module, the operator needs to use the unlocking tool supplied. The
module will be damaged if this tool is not used.
Step2:Connect the romote shutdown terminal
Note: If the monitor is not connected, the signal strength may be too low.
to the inverter COM3 interface and tighten.
4.5.3 PLC 2.0 Communication
Note: 1. PLC 2.0 communication is only applicable if the output is connected to a transformer;
2. PLC 2.0 communication requires SCB3000 communication box.
3. Refer to the SCB3000 manual for PLC wiring methods.
19 20
5 Operating Instructions 5.2 Description of Display Screen and Buttons
If the LCD displays“GW100K-HT Power = XXXXX watts”,press and hold for 2s to enter the first
Model with display level menu“China's max voltage”.In the second level menu, select the appropriate safety
regulation country according to the installation location, and wait 10s after selecting the country.
The machine will display“Setting up...”.Complete the setup, then a message will appear:
21 22
(5) Menu Introduction set by short pressing the button. To switch to the next digit, long press for 2 seconds. If you
*After the machine is powered on, the default display is the first level menu. entered the second level screen without making any changes, and did not press the button
*The status display is the first menu of the first level menu, which displays the current status of within 20 seconds, the display backlight will go off and you will automatically return to the status
the machine: The initial state of power-on shows "Waiting for power generation". If it enters the display menu of the first level menu. If you make changes, enter the“Setting up..." screen, then
power generation state, it displays the "Grid-tie power generation". If the machine is faulty, the it will display“Setting is completed successfully”or“Setup failed". Finally, the machine will
failure information is displayed automatically return to the status display menu of the first level menu.
*Set shadow MPPT function.
*Short press the button once to enter the input voltage display menu, which is used to display Short press the button once to enter the shadow MPPT function menu, long press for 2 seconds
the PV voltage in "V". to turn the shadow MPPT function on or off.
*Short press the button once to enter the input current display menu, which is used to display Display of“Shadow mode OFF Power =XXXXX watts" indicates the Off state. Display of
the PV current in "A". “Shadow mode ON Power =XXXXX watts" indicates the On state.
*Short press the button once to enter the utility voltage display menu, which is used to display (6) Normal power-on and display on operation screen
the mains voltage in "V". *When the input voltage is greater than the turn-on voltage, the machine starts to run, and the
*Short press the button once to enter the output current display menu, which is used to display yellow light comes on first. After a few seconds, the screen starts to display the following
the output current in "A". information:
*Short press the button once to enter the utility frequency display menu, which is used to display “Grid loss Power =XXXXX watts”. If there is utility power at this time, it will display
the mains frequency in "Hertz". “Detection timing **sec power = 0 watts". At this time, ** seconds are decremented. When
the number is reduced to 0, the relay action will be heard, and then "grid-tie power generation"
*Check failure code will be displayed, and the current machine power will be displayed in the second row.
Short press the button once to enter the failure history display menu, which is used to display the
fault information of the machine, and long press for 2 seconds to enter the second level menu to
view the five latest fault messages: Error message, failure time (190520 15: 00). To exit the
second-level menu, do not press the button for 20 seconds. The display backlight will go off, and
the machine will automatically return to the status display menu of the first-level menu.
*Check model
Short press the button once to enter the "Model Name" display menu and display the model
name.
*Time setting
Short press the button once to enter the system time setting menu, which is used to set the
current time of the machine, and enter the second level menu by long pressing the button for 2
seconds:
“2000-00-00 00:00”,the first and second digits remain unchanged by default. The third and
fourth digits are used to set the year (setting range 2000~2099). The fifth and sixth digits are used
to set the month. The seventh and eighth digits are used to set the date. The ninth and tenth
digits are used to set the hours, the eleventh and twelfth digits to set the minutes. Each digit is
23 24
5.3 Failure Information
First level menu Second level menu
Grid-tie power generation Long press for 2s
50Hz grid voltage
Power = XXXXX watts
The error message in the following table will be displayed on the screen when the abnormal
Short press
Daily power generation: Long press for 2s
Locked
situation occurs:
0.0 kWh
Short press
W: 16 S: 0
Total power generation: Long press for 2s
C: 0
0.0 kWh
Short press
Error Message Description
Serial No.:
Internal Communication Failure
Input voltage: Long press for 2s
Short press
Setting is completed successfully Relay Fail Relay Check Failure
Output current (A): Long press for 2s Wait
50Hz GridDefault Setting up...
Isolation Failure
Wait
Isolation Fail
Error history Long press for 2s 2000-00-00 00:00
Power = XXXXX watts Long press for 2s
Setting is completed successfully
Vac Failure
Short press Wait
Vac Fail
······ Setting up...
GW100K-HT Long press for 2s
Setup failed
Long press for 2s
Power = XXXXX watts
ExFan Fail
Short press 2000-00-00 00:00
Software version: Wi/L restarted successfully
V1.XX.XX.XX
Signal strength: 0% W/L restart Long press for 2s Wi/L reload failed InFan Fail
DC Bus High
Power = XXXXX watts Power = XXXXX watts
DC Bus High
Wait
Short press Unregulated
W/L reload Long press for 2s Short press Short press to select
Ground I Failure
"leading" or "lagging"
Gnd I Fail
Power = XXXXX watts Wait
Lagging 0.95 Setting is completed successfully
Short press Setting up...
Utility Loss
Short press to select 8 or 9 Wait Setup failed
Utility Loss
Power factor adjustment Long press for 2s Lagging 0.95
Power = XXXXX watts
Short press Short press to select 0 ~ 9 Wait
Long press for 2s Set power limit Short press to select 0 ~ 1 Wait
Ref-V Chek Fail
Shadow mode OFF Shadow mode ON
GFCI Device Failure
XXX%
GFCI Failure
Power = XXXXX watts Power = XXXXX watts
Short press Short press Long press for 2s
Setting is completed successfully
Set power limit Short press to select 0 ~ 1 Wait
Setting up...
XX%
Setup failed
Long press for 2s Long press for 2s
Power limit OFF Power limit ON
Power = XXXXX watts Power = XXXXX watts Set power limit Short press to select 0 ~ 9 Wait
XX%
Short press
Long press for 2s
Set power limit
Short press to select 0 ~ 2 Wait
XXX% Set address: XXX
Short press Long press for 2s Setting is completed successfully
Short press to select 0 ~ 9 Wait
Set address: XXX Setting up...
Set Modbus address Long press for 2s
Long press for 2s Setup failed
Power = XXXXX watts
Short press to select 0 ~ 9 Wait
Set address: XXX
Long press for 2s
Long press for 2s
Low voltage ride through ON Low voltage ride through OFF
Power = XXXXX watts Power = XXXXX watts Wait
Star shape
Short press Setting is completed successfully
Short press Setting up...
Wait Setup failed
Grid type Long press 2s to enter
Triangle
Power = XXXXX watts Initial password: 1111
25 26
6 Frequently Asked Questions Type Display Troubleshooting
Under normal conditions, the inverter requires no maintenance. If the inverter cannot work
normally, refer to the following instructions:
• When a problem occurs, the red light on the operation panel will light up, and relevant Relay Check Failure
information will be displayed on the APP. See the table below for details, and the content in
brackets provides the interpretation.
27 28
7 Technical Data Interpretation of overvoltage levels:
Overvoltage level I: Connect the product to a circuit with measures to limit instantaneous
7.1 Product Specifications overvoltage to a relatively low level.
Overvoltage level II: Energy-consuming equipment powered by fixed power distribution devices.
Technical Data GW100K-HT GW110K-HT GW120K-HT GW136K-HTH
DC input parameters Such equipment includes appliances, portable tools and other household and
Maximum DC input power (kW) 150 165 180 205 similar loads. If there are special requirements for the reliability and applicability
Maximum DC input voltage (V) 1100 1100 1100 1100
of such equipment, overvoltage level III shall be adopted.
MPPT operating voltage range (V) 180~1000 180~1000 180~1000 180~1000
Minimum start-up voltage (V) 200 200 200 200 Overvoltage level III: The reliability and applicability of equipment in fixed power distribution
Rated input voltage (V) 600 600 600 750 installations must meet special requirements, including switching appliances in
Maximum input current (A) 10*30 12*30 12*30 12*30
Maximum short-circuit current (A) 10*45 12*45 12*45 12*45
fixed power distribution devices and industrial equipment permanently connect-
No. of MPP Trackers 10 12 12 12 ed to fixed power distribution devices.
No. of Input Strings per Tracker 2 2 2 2 Overvoltage level IV: The equipment used in the power supply of the power distribution device,
AC output data
Rated output power (kW) 100 110 120 136 including measuring instruments and prepositioned overcurrent protection equipment, etc.
Maximum output power (kW) 110 121 132 150
Maximum apparent power (kVA) 110 121 132 150
Interpretation of humid places
Rated output voltage (V) 400, 3L/N/PE or 3L/PE 400, 3L/N/PE or 3L/PE 400, 3L/N/PE or 3L/PE 500, 3L/PE
Output frequency (Hz) 50/60 50/60 50/60 50/60
Level
Maximum output current (A) 167 175.5 191.3 173.2 Environmental
Power factor ~1 (0.8 leading�0.8 lagging adjustable)
<3% <3%
Parameters 3K3 4K2 4K4H
Output THDi (@rated output) <3% <3%
Efficiency
Temperature range 0°C~+40℃ -33°C~+40℃ -20°C~+55℃
Maximum conversion efficiency 98.6% 99.0%
European efficiency 98.3% 98.5% Humidity range 5% to 85% 15% to 100% 4% to 100%
Protection
String current monitoring Integrated
Internal humidity detection Integrated
Interpretation of environmental levels:
Residual current monitoring Integrated
Insulation resistance detection Integrated Outdoor inverter: The ambient air temperature range is -25°C~+60℃, suitable for pollution level 3
Anti-islanding protection Integrated environment;
Input reverse protection Integrated
Indoor type II inverter: The ambient air temperature range is -25°C~+40℃, suitable for pollution
DC surge protection Type II (Type I optional)
AC surge protection Type II (Type I optional) level 3 environment;
Output overcurrent protection Integrated Indoor type I inverter: The ambient air temperature range is 0°C~+40℃, suitable for pollution
Output short circuit protection Integrated
Output overvoltage protection
level 2 environment;
Integrated
AFCI DC arc protection Optional
PID recovery Optional Interpretation of pollution levels
AC terminal overtemperature protection Optional
Emergency quick shutdown Optional
Pollution level 1: No pollution or only dry non-conductive pollution;
General Data Pollution level 2: Usually there is only non-conductive pollution, but there may be temporary
Operating temperature (℃) -30~60
conductive pollution caused by condensation;
Relative humidity 0~100%
Operating altitude (m) ≤4000 Pollution level 3: There is conductive pollution, or non-conductive pollution becomes conductive
Cooling method Intelligent forced air cooling pollution due to condensation;
Interface LED (Standard), LCD (Optional), Bluetooth+APP
Pollution level 4: There is persistent conductive pollution, such as pollution caused by conduc-
Communication RS485 or PLC or WiFi
Weight (kg) 93.5 98.5 98.5 98.5 tive dust or rain and snow.
Dimensions (width x height x thickness mm) 1005*676*340
Degree of protection IP66
Night loss (W) <2
Topology Transformerless
Certification & Standards
Grid-tie standard
Safety standard
EMC standard
29 30
7.2 Schematic Diagram of Main Circuit 8 Product Maintenance
The main circuit of GW100K-HT is shown in the following diagram:
Regular maintenance of the inverter will ensure its service life and best efficiency.
Note: Before carrying out any maintenance, turn off the AC circuit breaker, disconnect the DC
PV1
+ MPPT
circuit breaker, and wait 5 minutes until the residual voltage is released.
➖ Circuit 1
+
PV2 MPPT
······
······
······
2. Wait 5 minutes until the residual voltage is released and the fan stops running;
+
PV10 MPPT PE
➖ Circuit 10 AC SPD
DC Switch DC SPD
3. Remove the fan net;
Current #4 DC Bus AC Relays
Monitoring
PV1 ➖+ MPPT
Circuit 1
PV2 ➖
+
MPPT
Circuit 2
L1
PV3 ➖
+ MPPT
Circuit 3
DC Switch DC Output L2
#1 EMI DC/AC LC
Inverter EMI
Filter Filter Filter
L3
······
······
······
······
PV10 + MPPT
Circuit 10 N
➖
PV11➖ MPPT
+
Circuit 11
PV12+ MPPT PE
➖
Circuit 12 AC SPD
DC Switch DC SPD
Current #4 Current AC Relays
Monitoring Monitoring
PV2 ➖
+
MPPT
Circuit 2
L1
······
······
L3
······
PV10 + MPPT
PV11➖ MPPT
+
Circuit 11
PV12+
➖
MPPT
Circuit 12 AC SPD
PE
• turn the DC switch on and off 10 times a year.
DC Switch DC SPD
Operating the switch regularly can clean up the device and extend its service life.
Current #4 Current AC Relays
Monitoring Monitoring
Note: Turn off the AC breaker first, and then turn off the DC switch.
31 32
Startup sequence
Shutdown sequence
If the startup and shutdown sequences given above are not followed strictly, the
inverter may be damaged.
3. Check whether the waterproof covers for RS485, WiFi and other ports are sealed correctly.
33 34