Page 1 of 7
Union Territory of Jammu and Kashmir
                            OFFICE OF THE EXECUTIVE ENGINEER RURAL ENGINEERING WING ANANTNAG
                    E-TENDER NOTICE NO 110 OF 2024-25 DATED 19-11-2024
                                  SHORT TERM NOTICE
 For and on behalf of the Lt. Governor, Union Territory of J and K e-tenders (IN SINGLE COVER SYSTEM) are invited on
 percentage rate basis from approved and eligible Contractors registered with J and K U.T Govt., CPWD, Railway and other U.T
 /Central Government works for the following works. -
s no         name of the work         es t i m   earnest          c o st o f     c la s s o f       time         panchayat         major
                                      a t ed /    m o n ey        tender        c o n tr a c t       for           h a l qa        h ea d
                                       adv.       (in rs)         docume                         c o mp l e t
                                       c o st     (2% of             n ts                            ion
                                       ( r s.    a d v er t i s
                                         in      e d co s t )
                                      lacs)
       1.    C/O BADMINTON COURT       1.45      2%                 200        dee/registrat      30 days       SADOORA A         district
                AT GUNDIJAFFAR                                                 ion certificate                                    capex
            SADOORA A BLOCK VESSU                                              byddc/compe                                        budget
                                                                               tent authority
       2.      C/O BOREWELL AT         2.15      2%                 200        dee/registrat      30 days       DAMJAN            district
            SESMAN DAMJAN BLOCK                                                ion certificate                                    capex
                    VESSU                                                      byddc/compe                                        budget
                                                                               tent authority
       3.     C/O BORE WELL NLO        2.43      2%                 200        dee/registrat      30 days       BUMTHAN           district
            KHURSHEED AHMAD MIR                                                ion certificate                                    capex
              AT BUMTHAN BLOCK                                                 byddc/compe                                        budget
                     VESSU                                                     tent authority
       4.     C/O XING CHAMBTAL        2.82      2%                 200        dee/registrat      30 days       BUMTHAN           district
            LADH NEAR STADIUM AT                                               ion certificate                                    capex
            BUMTHAN BLOCK VESSU                                                byddc/compe                                        budget
                                                                               tent authority
       5.       C/O FENCING AT         2.44      2%                 200        dee/registrat      30 days       MALPORA           district
            GRAVEYARD WARD NO 07                                               ion certificate                                    capex
             MALPORA BLOCK VESSU                                               byddc/compe                                        budget
                                                                               tent authority
       6.       C/O FENCING OF         2.26      2%                 200        dee/registrat      30 days       BUMTHAN           district
            PLAYFIELD AT LASSIPORA                                             ion certificate                                    capex
                 BLOCK VESSU                                                   byddc/compe                                        budget
                                                                               tent authority
       7.     C/O P/B NHO NAZIR        0.97      2%                 200        dee/registrat      30 days       BUMTHAN           district
              AHMAD ALLIE AND                                                  ion certificate                                    capex
             OTHERS BLOCK VESSU                                                byddc/compe                                        budget
                                                                               tent authority
       8.   C/O ROAD FROM CHINAR       1.45      2%                 200        dee/registrat      30 days       DAMJAN            district
            TO GH NABI AND OTHERS                                              ion certificate                                    capex
             DAMJAN BLOCK VESSU                                                      by                                           budget
                                                                                ddc/compete                                       (apdp)
                                                                                nt authority
       9.       C/O TILE LANE AT       2.94      2%                 200        dee/registrat      30 days       LG PORA B         district
               DIFFERENT SPOTS AT                                              ion certificate                                    capex
                TAKIYA LG PORA B                                               byddc/compe                                        budget
                  BLOCK VESSU                                                  tent authority
       10.      C/O TILE LANE AT       1.52      2%                 200        dee/registrat      30 days       VESSU             district
                DIFFERENT SPOTS                                                ion certificate                                    capex
                 CHINAR COLONY                                                 byddc/compe                                        budget
              INCLUDING TILE PATH                                              tent authority
              MASJID SHARIF BLOCK
                      VESSU
       1 1 . C/O TILE LANE FROM HO     0.98      2%                 200        dee/registrat      30 days       DAMJAN            district
             MOHD SHABAN KHANDAY                                               ion certificate                                    capex
             TO H/O MOHD AMIN ITOO                                             byddc/compe                                        budget
              DAMJAN BLOCK VESSU                                               tent authority
                                                                                                                            1|Page
                                                                                                                  Page 2 of 7
12.        C/O FOOT BRIDGE          31.47      2%            1100           Aee/bee        120 days    KADPORA               district
      THOKERPORA TO KUMAR                                                                                                    capex
        MOHALLA AT NALLAH                                                                                                    budget
      ARIPAT KADPORA BLOCK
               ACHABAL
13.      C/O TILE LANE FROM         1.45       2%             200        dee/registrat     30 days     L.G PORA B            district
      MAIN ROAD TO H/O PEER                                              ion certificate                                     capex
          SYED HUSSAIN AND                                               byddc/compe                                         budget
      OTHERS AT PEER FURRAH                                              tent authority
             BLOCK VESSU
14.      C/O TILEPATH FROM          1.75       2%             200        dee/registrat     30 days     BRARIANGAN A.         district
        MAIN ROAD TO MASJID                                              ion certificate                                     capex
       SHAREEF KANDAJI. PYT                                              byddc/compe                                         budget
       HALQA. BRARIANGAN A.                                              tent authority
            BLOCK SHANGUS
15.     C/O TILE LANE NHO AB        1.28       2%             200        dee/registrat     30 days     LG PORA C             district
        REHMAN RATHER AND                                                ion certificate                                     capex
          OTHERS LG PORA C                                               byddc/compe                                         budget
             BLOCK VESSU                                                 tent authority
16.   C/O DEVELOPMENT AND           7.27       2%             300           Dee/cee        30 days     CHECKIWANGUN          district
           /REVONATION OF                                                                              D                     capex
        PANCHAYAT GHAR AT                                                                                                    budget
      CHECKIWANGUND BLOCK
          HILLER SHAHABAD
17.              C/O                2.90       2%             200        dee/registrat     30 days     LG PORA C             district
      WASHROOM/WAZUKHAN                                                  ion certificate                                     capex
       A MASJID SHAREEF ITOO                                             byddc/compe                                         budget
         MOHALLA LG PORA C                                               tent authority
             BLOCK VESSU
18.   WAZUKHANA/BATHROOM            2.25       2%             200        dee/registrat     30 days     NIPORA                district
        NEAR JINAZGAH TEELI                                              ion certificate                                     capex
      MOHALLA NIPORA BLOCK                                               byddc/compe                                         budget
                VESSU                                                    tent authority
19.        C/O XING BEHIND          2.88       2%             200        dee/registrat     30 days     LG PORA A             district
      MUKDAM MASJID LG PORA                                              ion certificate                                     capex
            A BLOCK VESSU                                                byddc/compe                                         budget
                                                                         tent authority
2 0 . C/O TILEPATH AND LAND         1.49       2%             200        dee/registrat     30 days     MANZMOH               district
       LEVELLING FOR AYUSH                                               ion certificate                                     capex
          HEALTH CENTRE                                                  byddc/compe                                         budget
       MANZMOH PYT. HALQA                                                tent authority
             MANZMOH
           BLOCK HILLER
21.       C/O ROAD FROM             5.62       2%             300           Dee/cee        30 days     DINGOWARI             district
        DINGOWARI ADDA TO                                                                                                    capex
       MALDAR AT DINGOWARI                                                                                                   budget
      BLOCK HILLER SHAHABAD
The NIT Consisting of qualifying information, eligibility criteria, specifications, Bill of quantities (B.O.Q), Set of terms- and
conditions of contract and other details can be seen/downloaded from the departmental website www.jktenders.gov.in as per
schedule of dates given below.
        S. No.                   Particulars                                           Dated
          1      Date of Issue of Tender Notice                  19-11-2024
          2      Online Bid submission Start Date                19-11-2024 from 06.00 PM
          3      Online Bid Submission End Date                  27 -11-2024 up to 06.00 PM
                                                                 28-11-2024 at 10.00 AM or any convenient
                                                                 day in the office of Executive Engineer REW
          4      Date and time of opening of bid ( online)       Anantnag.
Special Condition.
Only the eligible contractors of respective Panchayat Halqa shall take part in the tendering process for the
works costing amount upto 3 lac) in light of the Government Order No. 251-FD of 2020 Dated. 17-09-2020.
Bidders must upload a certificate from concerned Block Development Officer of residence proof that he/ she is
residing in the respective panchayat.
                                                                                                                    2|Page
                                                                                                                         Page 3 of 7
1.    All the Bidders must Upload Earnest Money/Bid Security (EMD@2% of Advertised Cost) in the shape of CDR/FDR. Non
      submission of Earnest Money Deposit shall render the bidder as No-responsive,
2.    Bids must be accompanied with cost of tender document in shape of Treasury Challan under Account Head 0515
      (Executive Engineer REW Anantnag) [Tender Inviting Authority] (e-NIT no. and Name of Work/serial to be mentioned on
      the Treasury Challan / Receipt) (Refer Govt. order No. O.M No. A/24 (2017)-651 Dt 07-06-2018 (The Date of Treasury
      Challan should be between the date of Start of Bid and Bid Submission End Date) (E-challan will not be accepted) and
      EMD (2% of advertised Cost) in the shape of CDR/FDR pledged to Executive Engineer REW Anantnag (EMD should be
      between the date of Start of Bid and Bid Submission End Date) (Tender receiving Authority).
3.    The 1st lowest responsive (Successful) Bidder must produce an amount equal to 5% of contract as Performance Security in
      the shape of CDR/FDR in Favor of Executive Engineer REW Anantnag (Tender receiving authority) within 03 Days and
      shall be released after successful completion of Defect Liability Period (DLP) of the work. Failure to produce Performance
      Security shall render the L1 as non-responsive and case for debarring of the Contractor be forwarded to Higher Authorities
      for a period of 01 Year.
4.    The Earnest Money Deposit (EMD@2% of Advertised Cost) in the shape of CDR/FDR of the successful Bidder shall be
      released after receiving Performance security @ 5% of the advertised cost in the shape of CDR/FDR and same shall be
      released after successful completion of Defect Liability Period (DLP) of the work
5.    The date and time of opening of Bid shall be notified on Web Site www.jktenders.gov.in and conveyed to the bidders
      automatically through e-mail message on their e-mail address. The bids of Responsive bidders shall be opened online on
      same Web Site in the office of Executive Engineer REW Anantnag.
6.    The bids for the work shall remain valid for a period of 120 days from the date of Opening of Technical bids.
7.    The Earnest Money/Performance Security shall be forfeited If.
       a) Any bidder withdraws his bid/tender during the period of bid validity or makes any modification in the terms and
            conditions of the bid.
       b) Failure of successful bidder to furnish the required performance security within specified time before issue of letter of
            intent.
       c) Successful Bidder fails to execute the agreement within 07 days after fixation of contract, if made.
       d) If at any stage of work, the Bidder back up from the contract, again the Performance security/EMD as well as work
            done claim will be forfeited.
8.    Instruction to bidders regarding e-tendering process.
             a.    Bidders are advised to download bid submission manual from the “Downloads” option as well as from “Bidders
                   Manual Kit” on website www.jktenders.gov.in to acquaint bid submission process.
             b.    To participate in bidding process, bidders must get ‘Digital Signature Certificate (DSC)’ as per Information
                   Technology Act-2000. Bidders can get digital certificate from any approved vendors.
             c.    The bidders must submit their bids online in electronic format with digital Signature. No Financial bid will be
                   accepted in physical form.
             d.    Bids will be opened online as per time schedule mentioned in Para-1.
             e.    Bidders must ensure to upload scanned copy of all necessary documents with bid and no documents in terms of
                   Hard Copies shall be entertained
             f.    Furnishing of hard copies of bids immediately after submission of e-tenders is dispensed with the same should
                   be obtained only from the bidder who is declared as L-1 after opening of financial bids.
    Note. - Scan all the documents on 100 dpi with black and white option
9.  The department will not be responsible for delay in online submission due to any reasons.
10. Bidders are advised not to make any change in BOQ (Bill of Quantities) contents. In no case they should attempt to create
    similar BOQ manually.
11. Price escalation and taxes. The %age quoted by the bidder entirely in Indian Rupees, shall be deemed to include price
    escalation and all taxes up to completion of the work. Deduction on account of taxes shall be made from the bills of the
    contractor on gross amount of the bill as per the rates prevailing at the time of recovery.
12. Bidders are advised to use “My Documents” area in their user on REW e-Tendering portal to store such documents as are
    required.
13. Instruction to bidder (Eligibility criteria)
    a. All Bidders must upload Valid Registration Cards (duly renewed for FY 2024-25), valid GSTIN registration, and valid
         PAN Card.
    b. Contractors registered with other departments must also have online registration and renewal on jkpwdoms.gov.in
         considering circular No. GDAT/PS/DR/7172456/196 dt 24-05-2023 issued by JANDk finance department and
         Verification Certificate from concerned Chief Engineer /Superintending Engineer of Enlistment Registration Card.
    c. A fresh Registration card generated via JKPWDOMS is itself a verified card (Valid Document) and do not need/seek
         submission of offline verification Certificate
    d. All bidders must upload Scanned copy of GSTIN registration and most recent clearance certificate FORM GSTR-3B
         from the previous quarter or month, whichever is applicable, ending september -2024, OR july -september Quarter-
         2024.
    e. The bidder must upload the original copy of attested affidavit (latest) as per Annexure A on Rs. 10/= Stamp Paper.
    14. All construction materials shall be supplied by the contractor at his own cost as per the prescribed specifications
        17. Bidder must ensure to upload scanned copies of all necessary documents including tender documents fee in terms
        of soft copies with technical bid and no documents in terms of Hard Copies shall be entertained. However, in case of
        any clarification the bidders shall have to produce original documents in support of soft copies if need arises.
    18. General conditions of Contract.
            18.1The date of start of the work shall be reckoned within 03 days from the date of issuance of LOI/Contract
            allotment
                                                                                                                          3|Page
                                                                                                                             Page 4 of 7
           18.2 Penalty for delay in completion. -In case of delay in completion of work beyond stipulated period of
                completion, penalty up to maximum of 10% of the contract shall be imposed.
           18.3 Time extension. -Suitable time extension shall be granted in case of increase in scope of work and in the event
                of delay beyond control of contractor to be determined by the department.
           18.4 Advance Payment. - No mobilization advance / equipment advance shall be paid unless otherwise specified in
                the SBD.
           18.5 Secured Advance. - No Secured advance is admissible unless otherwise specified.
           18.6 Schedule Payment. - The payment schedule shall be fixed after award of contract in favor of successful bidder,
                based on availability of funds and value of work executed, shall be determined by the Engineer.
           18.7 Amendment of bidding document. Before the deadline for submission of bids the employer may modify the
                bidding document by issuing addendum.
           18.8 Amendment of bidding document. Before the deadline for submission of bids the employer may modify the
                bidding document by issuing addendum.
           18.9 THE TENDER RECEIVING AUTHORITY RESERVES THE RIGHT TO ACCEPT OR REJECT ANY
                TENDER OR ALL TENDERS WITHOUT ASSIGNING ANY REASON THEREOF.
           18.10 Restoration of work. - On completion of contract the contractor shall be responsible to remove all un-used
                material and restore all work in its original position at his own cost.
           18.11 Traffic regulations. -The contractor is bound to adhere to traffic regulations as is applicable from time to time
                and ensure arrangements of smooth regulation of traffic during execution of work.
           18.12 Arbitration. - The arbitration shall be conducted in accordance with the arbitration procedure stated in the J
                and K conciliation and Arbitration Act No. -xxxv of 1997 issued vide SRO No. -403 vide Notification of J and
                K Govt., "Law Department" 11th December-1997.
           18.13 Defect Liability period. - The DLP shall be calculated from date of certified completion of work and period
                shall be 06 Months. The defects noticed in the work during execution or D.L.P shall be corrected by the
                contractor within the length of the time specified by the Engineer. If the contractor does not correct the defects
                pertaining to D.L.P to the satisfaction of the Engineer within the time specified, the Engineer will assess the
                Cost of having the defects corrected and contractor will pay this amount on correction of defects.
           18.14 The date of start of work shall be reckoned within Seven days from the date of issuance of allotment/Letter of
                intent. In case the Agency fails to execute the work, the deposits in the shape of Earnest Money/Performance
                Security shall be liable for forfeiture besides initiating other punitive actions against the defaulter without
                serving any notice.
           18.15 For the authentication of date of start of work, it shall be mandatory to upload geo-tagged photographs of the
                start of work at the beginning and at the time of completion of the work and shall also be enclosed at the time of
                submission of work done claims for the work.
           18.16 All Key Construction material shall have to be strictly as per prescribed specifications and approval of the
                Engineer in Charge.
           18.17 Safety. - The contractor shall be responsible for safety of all activities at site of work.
           18.18 Discoveries. - Anything of historical or other interest or of significant value unexpectedly discovered on the
                site shall be the property of the Govt.
           18.19 Tests. -The contractor shall be solely responsible for carrying out the mandatory tests required for the quality
                control at his own cost
           18.20 Any item/items of work if found necessary during execution of work outside the BOQ shall have to be
                executed by the contractor and shall be paid at par or/and the (minus) %age as quoted by the bidder.
           18.21 Any item/items if found not necessary during execution of work within the advertised BOQ may be deleted
                during execution and no claim whatsoever shall be entertained on this account.
19. Fundamental breach of contract will include. -
       a.   Continuous stoppage of Work for a period of 30 days without authorization of Engineer in-charge.
        b. Contractor is declared bankrupt.
       c.  Any evidence of involvement of contractor in corrupt practices.
       d.  If the Contractor indulges in wilful disregard of the quality measures put in place by the department.
       e.  Contractor delays the completion of work beyond stipulated time of completion.
       f.  Pursuant to the process of termination of defaulted contract, the employer reserves the right to invite fresh tender for the
           balance work at the risk and cost of defaulting contractor.
       g. If In case contractor failed to start /complete the work, within the stipulated time, his Earnest Money/Performance
           Security shall be forfeited after termination of the contract. Besides, defaulting contractor shall be debarred from taking
           works in REW Department at least for one year.
        20 Major Labour Laws applicable to establishment engaged in building and other construction Work.
  a)         Workmen compensation act 1923.
  b)         Payment of Gratuity Act 1972.
  c)         Employees P.F. and Miscellaneous Provision Act 1952.
  d)         Maternity Benefits Act 1951.
  e)         Contract Labour (Regulation and Abolition) Act 1970.
  f)         Minimum Wages Act 1948.
  g)         Payment of Wages Act 1936.
  h)         Equal remuneration Act 1979.
  i)         Payment of bonus Act 1965.
  j)         Industrial disputes Act 1947.
                                                                                                                               4|Page
                                                                                                                         Page 5 of 7
k)          Industrial employment standing orders Act 1946.
l)          Trade Union Act 1926.
m)          Child Labour (Prohibition and Regulation) Act 1986.
n)          Inter State Migrant workmen's (Regulation of employment and Conditions of service) Act 1979.
o)          The building and other Construction workers (Regulation of employment and Condition of service) Act 1996 and the
            Census Act of 1996.
p)          Factories Act 1948.
q)          Compliance with Labour Regulation Laws of J and K UT.
      21   Specification/Quality Control. - All items of works shall confirm to specifications as per
           IRC/MORTH/NBO/CPWD/SSR/ Any other prescribed specifications.
      22   Insurance. - Insurance cover to Labour / Machinery / Work / Plant material / Equipment by the contractor shall be
           mandatory.
      23   Laws Governing the Contract. -The contract shall be governed by Laws of the land.
      24   Court’s Jurisdiction. -In case of any disputes/differences between contractor and Department the jurisdiction shall
           be J and K UT.
                a.   Special Condition for unbalanced Bids. In case the amount quoted by the 1st lowest
                     bidder is less by more than 15% of the advertised amount, the bidder shall have to
                     deposit Additional Performance Security for Unbalanced Bid in the shape of
                     CDR/FDR/BG only before award of contract within 07 days from the date of issue of
                     Letter of Intent (LOI) as per scale given herein below.
                     S.                       Percentage of Unbalance bid viz.                      Additional performance
                     No                                  advertised                                        security
                                                            cost
                     1.                        Up to and including 15%                                           Nil
                     2.                         Beyond 15% and up to 20%                              5% Of Advertised Cost
                     3.                         Beyond 20% and up to 30%                              10 % Of Advertised Cost
                     4.                         Beyond 30% and up to 40%                              15% Of Advertised Cost
                     5.                              Beyond 40%                                       20% Of Advertised Cost
      25 Time Extension
a.         The work is to be completed within the time limit specified in the NIT and the time of completion will also increase /
           decrease in proportion with additional / deleted quantum of work depending upon the actual quantum of work
b.         Request for extension of time shall be made by the contractor in writing not later than fifteen days of happening of the
           event causing delay. The contractor shall also indicate in such a request the period for which extension is desired.
c.         Abnormal/ bad weather or serious loss or damage by fire or civil commotion, strike, or lockout (other than among the
           labour engaged by the contractor) affecting any or the trade employed on the work, or non-availability of departmental
           stores. Any other cause which in the absolute discretion of the accepting authorities is beyond the contractor’s desire.
d.         On contractor’s representation based on the grounds as detailed above the time for completion of the work may be
           extended by a period considered reasonable by the Department.
e.         Extension of time shall be also admissible in the event of temporary suspension of work.
      27. The tender/ bid is liable to rejection if it does not full fill the requirement as laid down in NIT
           28. Performance Security shall be released after DLP is over successfully.
           29. Performance security shall be used in shape of CDR/FDR for tendering process.
           30. All other terms and conditions are as same as laid in PWD Form 25.
     No. REW-A/WS/NIT/2024-25/15109-18
     DATED. 18-11-2024
                                                                                                                Sd/-
                                                                                                 EXECUTIVE ENGINEER
                                                                                               RURAL ENGINEERING WING
                                                                                                       ANANTNAG
                                                                                                                           5|Page
                                                                                                           Page 6 of 7
Copy to the.
1.  District Development Commissioner Anantnag for favour of Information.
2.  Director Rural Development Department Kashmir for favour of Information.
3.  Superintending Engineer REW Kashmir for favour of Information.
4.  Assistant Commissioner Panchayat Anantnag for favour of Information and necessary action.
5.  Joint Director Information Department Kashmir for favour of information with the request that the NIT may be got
    published in three leading daily newspapers.
6. Assistant Engineer REW Sub Division ALL for information.
7. Block Development Officer ALL for favour of information and necessary action
8. Draftsman, Divisional Office for information.
9. President Contractor Association Anantnag for information’
10. Notice Board
                                                                                                            6|Page
                                                                                                              Page 7 of 7
                                      Annexure-A
          Affidavit on the correctness of information furnished with the Bid
ENIT NO. ______________________
Name of Work.
____________________________________________________________________________________________________
____________________________________________________________________________________________________
________________________
1.   I _______________________________do hereby certify that all the statements made in the required attachments are
     true and correct.
2.   That I have not been blacklisted or debarred in any state or central Govt. Department Neither I have any history of
     litigations
3.   The undersigned understands and agrees that further qualifying information may be requested, and agrees to furnish any
     such information at the request of the Department.
4.   The undersigned is submitting the bid after conducting a site visit assessing site conditions as per NIT, the leads AND
     carriages, the weather conditions AND by accepting all the conditions of tender documents.
5.   I am not a PRI Member (BDC/DDC/Sarpanch/Panch).
     .
6.   I solemnly affirm that the information given in the bid is correct to the best of my knowledge and belief and nothing of
     any sort has been concealed.
Note. Affidavit to be notarized
                                                                                                               7|Page