S.No Description Unit Flat No-1 Flat No-2 Flat No-3Flat No-4 Flat No-5 Flat No-6 Flat No-7 Flat No-8 Flat No-9 Typical floor
Quantity
1 1620 mm Kitec (HOT) Pipe Mt 28.8 26.50 26.55 26.1 31.00 23 28.6 21.5 28.2 240.25
1620 mm Kitec (Cold) Pipe Mtr 65.85 63.8 67.15 62.6 84 54.7 75.5 72.65 60.5 606.75
3 1620 mm Kitec (FwS) Pipe Mtr 17.6 14.25 17.55 18.85 15.6 9.25 14.7 18 14.4 140.2
4 1620 mm Kitec (MWS) Pipe Mtr 8.15 6.95 9.2 6.40 6.2 7.10 8.3 10.15 8.4 70.85
2532 mm Kitec (Header Line) Pipe Mtr 53.25 35.95 38.1 40.31 50.9 25 27.3 53.868 53.97 378.643
No-
50.90 136.80 Flat
56
No-
25.00 94.05 Flat
No-Flat
27.30 127.10
78 No
No-Flat
No-Flat
122.30
53.87
111.50
9
53.97|
Quantity
378.65 1058.05 Typical
floor
RPPL kq
FLATNO
NO RAJAPUSHPA
FLATKTECH LOC:PROJECT:
CONTRACTOR:-SKP&COMPANY
FLATNO
IMPERIA
FLATNO FLATNO FLATNO FLATNO FLATNO FLATNO FLATNO
09 08 07 06 05 04 03 02 01 BLOCK-"C"
MEASUREMNT
DESCRIPTION INTERNAL
Headrerline Headrer
line Headrer
line Headrer
line Headrer
line Headrer
line Headrer
line Headrer
line Headrer
line
MWS FWS Cold Hot MWS FWS Cold Hot MWS FWS Cold Hot MWS FWS Cold Hot MWS FWS Cold Hot MWS FWS Cold Hot MWS FWS Cold Hot MWS FWS Cold Hot MWS FWS Cold Hot
PLUMBING
FLAT
Pipe/2532 1620MM
WORK
2532 1620 1620 1620 1620 2532 1620 1620 1620 1620 2532 1620 1620 1620 1620 2532 1620 1620 1620 1620 2532 1620 1620 1620 1620 2532 1620 1620 1620 1620 2532 1620 1620 1620 1620 2532 1620 1620 1620 1620 2532 1620 1620 1620 1620
WISE
10.15 8.30 26.4 6.40 19.35 9.20 19.75 6.95 12.45 8.15
Kitchen
17.25 Corridor
/utility Hall &
8.4 14.2 26.15. 25.8/ 7.1 19.4 6.2
165.47 53.97 176.16853.868 119.05 154.26 40.31 173.65 53.25 8.15 65.85
158.55 38.1 17.5567.15 26.55147.45 35.95 6.95 14.25 63.8 26.5
8.4 14.4 60.5 28.2
10.15
18
72.65 21.5 154.4 27.3 8.3 14.7 75.5 28.6 25 7.1 9.25 54.7
187.7 50.9
23 6.2 15.6 84 31 6.4 18.85 62.6 26.1 9.2 17.6 28.8 Total
REMARKS
Signature Singnature Singnature
Do
CBRE M/s.Rajapushpa inchargeContraetors
53.25 9+1+0.8+2'4+1.4+2'1+2.5+0.5/ MTR Pi12|
pe 2532
4.15+3.8+4.3+1.1+2+1.3+2.7+1.8+1.
Hall,Corridor
8.15 1.50+1.65+17+19+1.40 MTR Pip11|
e 1620
Line MWS Kitchen
0.80+2.2+1.5+3.65+1.9+2.0+2.0+2.0+0.9+0.10+0.10+0.10
17.25 MTR Pi10|
pe 1620
Line Cold Kitchen
5.35 1.7+0.85+0.80+1.9+0.10 MTR Pipe 9|1620
Line Flush BR-3 GBR,
0.80+2.75+1.6+1.7+1+2.2+0.80+2.2+0.10+0.10
13.25 MTR Pipe 8|1620
Liné Cóld BR3 GBR,
6.35 0.80+1.35+1.80+2.3+0.10 MTR Pip71620
e
Line Hot BR-3 GBR,
8.35 1.70+0.35+2.45+1.7+1.9+0.10 MTR Pip61620
e
LinFlushing
e BR-2 CBR,
0.50+1.85+2.45+1.6+1.7+2.2+1.0+1+2.2+0.10+0.10
14.7 MTR Pipe5|1620
Line Cold BR-2 CBR,
7.8 0.50+1.85+1.25+2.30+1.8+0.10 MTR Pipe41620
Line Hot BR-2 CBR,
3.90 1.7+0.20+1.90+0.10 |MTR Pipe 3|1620
BR-1 MBR(Flushing
Line),
+2.25+1.6+1.+2.2+22+0.10+0.10+0.10
20.65 2
MTR Pipe 1620
BR-1 Line),
MBR(Cold
2.4+1.3+3.3+0.30+0.8+1.8+2.25+2.3+0.10+0.10
14.65 MTR Pipe 1|1620
BR-1 Line), MBR(Hot
qty Total Break
up Units Description Sno
Installation Pipe Kitech Works: Description
of
Drawing
Ref.
27-Feb-24 Dat:e No: Item BOQ
No: JMS No: Contract/
WO
Flat1C-Blcok, /Flat Block Company SKP& M/Contractor
S. :
CBRE
Measurement
Sheet Joint RAJAPUSHPA
DrawingRef. BOQNo: RAJAPUSHPA
Item Contractor
Contract/
No:WO PAOPENTES
SnoDescription
VTLTO.
12 Pipe10|1620
11|1620 Pipe 91620
Pipe 8 7|1620
Pipe Pipe 51620
61620 Pipe 4|1620
Pipe 31620
Pipe 21620
Pipe 11620
Pipe
Contractors
Incharge |2Pipe
532 1620
Pipe
Singnature
Description
of MIS. :
Works:
SKP
|MTR MTR MTR MTR |MTR MTR MTR MTR MTR |MTR MTR MTR Kitech &
Units Company
Pipe
+4.1+4.2+1.8+0.7+3.25+2.3+2.5+0.50 2.2+0.7+1.5+0.60+1.5+1.8+2.3+0.10+0.10
|1.7+1.7+1.65+1.9
|1.7+0.35+1.9+0.10
|1.5+3.05+1.0+2.0+2.0+2.1+0.50+0.10+0.10+0.10
0.60+1.5+2.2+0.7+2.75+1.4+1.6+1.7+2.2+0.80+2.2+0.10+0.10+0.10 |2.2+2+1.8+0.80+1.80+0.10
|2.3+2+2.2+1.8+1.6+1.7+0.80+7+0.10+0.10
|1.7+2.2+0.2+1.9+0.10 |1.7+0.40+1.9+0.10
|2.2+1.9+2.7+2.2+1.6+1.7+1.3+0.10+0.10
2.3+1.5+1.8+1.3+0.10
L Installation
Measurement
Sheet
Joint
35.95 6.95 12.45 4.05 17.95 10.8 6.1 19.6 8.7 4.10 13.80
7
Remark
Totalqty CBRE
Signature
CBRE
RAJAPUSHPA
PRÓ
OrnRTRS PVr. LTn
fenntn
Joint Measurement Sheet CBRE
Contractor : M/S. SKP &Company Block /Flat C-Blcok, Flat 3
Drawing Ref.
Description of Works: Kitech Pipe Installation
Hall& Corridor
1.4+2.4+2.1+14+3.1+1.7+1.3+1.25+0.85+0.8+1.1+3+2.7+2.05+7.35+06+2
2532 Pipe MTR
+2.5+0.5 38.1
Drawing Ref.
Description of Woi Kitech Pipe Installation
Drawing Ref.
Description of Work Kitech Pipe Installation
t K i t c h e n Cold Line
1620 Pipe 1.2+1.7+5.3+3.7+0.80+3.6+2.0+0 80+2.0+0 80+2.10+
10 MTR |2,10+0.10+0,10+0,10 26.4
Kitchen MWS Line
11|1620 Pipe |MTR 1.5+1+1.9+1.8 6.2
Hall & Corridor
1.5+1.9+0.8+2.7+0.8+3+06+3. 1+1.5+26+27+1.6+3.
12|2532 Pipe |MTR |7+0,6+3A+15+1+1.4+2.5+0.50 50.9
Drawing Ref.
Description of Work Kitech Pipe Installation
Drawing Ref.
Description of Works Kitech Pipe Installation
Drawing Ref.
Description of Works Kitech Pipe Installation
61620 Pipe
MTR
MTR
1.9+1.35+2.75+2.2+1.
b.4eu11+o9+010+0.i0
CBR(Flushing Line), BR-2
2.2+1.35+0.80+17+0.10
13.7
6.15
Drawing Ref.
Description of Worl Kitech Pipe Installation
5
1620 Pipe MTR
2.2+140+1.3+2.5+2.2+1.6+1.7+0.60+0.10+0.10 13.7
CBR(Flushing Line), BR-2
61620 Pipe |MTR 1.9+1.1+1.7+0,10 4.8
12
2532 Pipe
|MTR
1.7+2.72+1.4+2.3+1.35+3.3+0,9+2,9+2+1.8+1.2+5.3+2.
|2+1.7+1,7+12.6+1.1+1.5+2+1.3+2'5+0.5 53.97
Contractorstnaharge M/s.Rajapushpa CB