Supply Chain Operations

The document contains quiz answers related to Supply Chain Operations, focusing on key concepts in operations, lean inventory, and quality management. It covers topics such as the transformation process in operations, the importance of speed and flexibility, the DMAIC methodology, and the significance of quality in production. The quizzes include specific questions and answers regarding operational metrics, inventory management, and quality improvement strategies.

Uploaded by

asbsb41
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views6 pages

Supply Chain Operations

The document contains quiz answers related to Supply Chain Operations, focusing on key concepts in operations, lean inventory, and quality management. It covers topics such as the transformation process in operations, the importance of speed and flexibility, the DMAIC methodology, and the significance of quality in production. The quizzes include specific questions and answers regarding operational metrics, inventory management, and quality improvement strategies.

Uploaded by

asbsb41
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Supply Chain Operations Week 01 Quiz Answers

Quiz : The Goals of Operations


Q1. Why is Operations also referred to as a process of transformation?
 Because, in operations, we transform inputs (raw materials,
machinery, and labor) into outputs (products or services).
 Because activities involved in the day-to-day of business are always
changing.
 Because operations as a discipline has always transformed over time.
Q2. How can you achieve economies of scale?
 By being more economical, we produce a better output.
 By producing more, we can produce each unit cheaper.
 By producing each product faster.
 By producing better quality.
Q3. Why is speed important in operations? Select all that apply below.
 If we produce faster, there is less chance of having a defect.
 If we produce faster, we minimize cost.
 If we can produce faster, then we can produce more in the same
facilities.
 If we can produce faster, then we can be more responsive to the market.
Q4. Why is producing defective items more expensive? Select all that apply below.
 Customers do not want to buy those defective products and
therefore replacing them is costly.
 Producing more than you actually need because you have to account
for defects is costly.
 Better materials is more expensive.
Q5. What is flexibility in a manufacturing sense?
 The quality of bending easily without breaking.
 The ability to easily modify a production schedule (change items,
quantity, order, etc.).
 The willingness of the workers to change or compromise.
Q6. Optimization in Operations follows a standard logic. Pick the correct statement
below
 Minimize cost by producing more.
 Increase flexibility to be able to respond to the market.
 Eliminate constraints to increase throughput.
 Optimize the objective, by changing one or more variables, subject
to certain constraints.
Q7. Which two central tenets are at the core of Toyota’s production system? Select
both from the items below.
 Kaizen
 Quality
 Efficiency
 The elimination of the seven waste’s
Q8. What is Kaizen? Select all that apply below.
 A quality system used by many companies.
 Employee empowerment to continuously flag quality issues as they
appear and improve the process as a result.
 It means perfect production.
 The Japanese term used by Toyota for a production system focused
on continuous improvement.
Q9. What are the seven wastes?
 manufacturing, speed, inventory, flexibility, waste, warehousing, quality
 transport, inventory, motion, waiting, overproduction,
overprocessing, defects
 manufacturing, transport, inventory, waiting, waste, overprocessing, quality
Q10. In the theory of constraints, variations on what three measures define
organizations?
 Flexibility, Perfection, and Economies of Scale
 Cost, Speed, and Quality
 Inventory, Throughput, and Operational Expense
Q11. What happens when a constraint is permanently removed from the system?
 We achieved our goal.
 There will be another constraint limiting throughput.
 We will produce as much as possible.
Q12. What is a clear sign of a bottleneck?
 We are inefficient in our production facility.
 We do not produce as much as we could.
 An unusual buildup of inventory somewhere in the production
system.
Supply Chain Operations Week 02 Quiz Answers
Quiz : Lean Inventory
Q1. For Product A, what is the EOQ? (please enter it in the following format xxx,
xxxx, or xxxxx)
 1000
Q2. For Product B, what is the Total Cost (of holding and ordering inventory)?(please
enter it in the following format xxx, xxxx, or xxxxx)
 4000
Q3. For product C, what is the Inventory Holding Cost? (please enter it in the
following format xxx, xxxx, or xxxxx)
 60000
Q4. For product D, what is the Total Cost (of holding and ordering inventory? (please
enter it in the following format xxx, xxxx, or xxxxx)
 1800
Q5. For product E, what is the EOQ? (please enter it in the following format xxx,
xxxx, or xxxxx)
 1600
Q6. For Product A, what is the combined standard deviation of lead time and
demand? (rounded to the nearest integer, e.g. xx.xx–>xx)
 55
Q7. For Product B, what is the safety stock you would hold if you wanted to reach a
97.5% fill rate? (rounded to the nearest integer, e.g. xx.xx–>xx)
 82
Q8. For Product C, what is the safety stock you would hold if you wanted to reach a
98% fill rate? (rounded to the nearest integer, e.g. xx.xx–>xx)
Q9. For Product D, what is the combined standard deviation of lead time and
demand? (rounded to the nearest integer, e.g. xx.xx–>xx)
 180
Q10. For Product E, what is the safety stock you would hold if you wanted to reach a
90% fill rate? (rounded to the nearest integer, e.g. xx.xx–>xx)
 322
Q11. For Product A, how large should the Kanban bin be? (rounded to the nearest
integer, e.g. xx.xx–>xx)
 250
Q12. For Product B, how large should the Kanban bin be? (rounded to the nearest
integer, e.g. xx.xx–>xx)
 413
Q13. For Product C, how large should the Kanban bin be? (rounded to the nearest
integer, e.g. xx.xx–>xx)
 1066
Q14. For Product D, how large should the Kanban bin be? (rounded to the nearest
integer, e.g. xx.xx–>xx)
 1589
Q15. For Product E, how large should the Kanban bin be? (rounded to the nearest
integer, e.g. xx.xx–>xx)
 2324
Supply Chain Operations Week 03 Quiz Answers
Quiz : Quality Management and the DMAIC Methodology
Q1. In the define stage, select all questions below that you need to ask:
 What is the problem?
 What does the customer value?
 How does the problem affect the customer(s)?
Q2. What is the purpose of the define stage?
 To articulate the business problem, state the goal for improvement,
and outline the solution.
 To state what you currently know, seek to clarify the facts, and set objectives
for the company.
 To explain what is wrong in the company, who caused the problem, and what
it costs to fix it.
Q3. What is the purpose of the measure stage?
 To measure why the process is broken.
 To gather data.
 To objectively establish a baseline for improvement.
Q4. How do you measure the current performance of a process? Select all steps
below that apply.
 Assess the measurement system.
 Collect any available data about the process.
 Identify any gaps between the current process performance and
theoretical capability of the process.
Q5. What is the purpose of the analyze stage?
 To come up with solutions to our problems.
 To analyze the data we have collected in the previous stage.
 To identify potential problems, identify root causes, and prioritize
them for improvement
Q6. What is the purpose of the improve stage?
 To make sure the process remains better in the long run.
 To identify, test and implement a solution to the problem.
 To make sure we use all tools at our disposal.
Q7. What is the purpose of the control stage? Select all that apply below:
 To find ideas on the next area to improve.
 To ensure that the newly improved process remains stable.
 To implement process control tools that continuously monitor our
process.
Q8. Why did Philip Crosby state that “quality is free”?
 Because it is so easy to produce items with perfect quality.
 Because companies would spend just as much money on ensuring
perfect quality than producing defective items and disposing of
them as part of the manufacturing process.
 Because customers don’t want to pay extra for better quality products.
Q9. Why does the TQM model place the responsibility for quality on top
management?
 Because for quality to be perfect, everyone in the organization must
be involved and that requires top management to be on-board.
 Because only top management understands the importance of quality.
 Because only top management can make the changes.
Q10. Why do companies seek ISO 9000 certification? Select all that apply below:
 Because it is a way for them to advertise how important quality is.
 Because it is easy to obtain.
 Because it makes them a better organization.