Cable Lugging Check with O&M
Site:                             Customer:                                   Location no/WTG:
Date of T4 cable termination:                      Name of Contractor:           Make of Lug:
  Sr No.                        Check Points                             OK                      Not OK
        1    Condition of cable looping at T4
        2    Cable dressing from T4 joint to tower
             bottom
        3    Bi-metallic crimping condition of Stator
             cable
        4    Bi-metallic crimping condition of Rotor
             cable
        5    Rotor Shielding Cable Joint
NOTE : Take Photographs of each joint Lugs’ Crimping, before sleeving
For O&M Dept:                                                                              For Project Electrical:
Name:                                                                                       Name:
Signature:                                                                                  Signature: