0% found this document useful (0 votes)
57 views2 pages

Preview File Net To File

This document is a Hot Work Permit for activities at The Dubai Mall, valid from April 6, 2025, at 12:00 AM to April 6, 2025, at 8:00 AM. It includes details about the applicant, safety measures, and the nature of the work, which involves fit-out and MEP works. The permit emphasizes the responsibility of the contractor for safety and compliance with regulations during the hot work process.

Uploaded by

Raghu supertech
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views2 pages

Preview File Net To File

This document is a Hot Work Permit for activities at The Dubai Mall, valid from April 6, 2025, at 12:00 AM to April 6, 2025, at 8:00 AM. It includes details about the applicant, safety measures, and the nature of the work, which involves fit-out and MEP works. The permit emphasizes the responsibility of the contractor for safety and compliance with regulations during the hot work process.

Uploaded by

Raghu supertech
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Permit Validity: Timings:

The Dubai Mall From (Date): 06 Apr 2025 Time (In): 12:00 AM
04 Apr 2025 08:03:25 PM To (Date): 06 Apr 2025 Time (Out): 08:00 AM
EMJWPP-0687388-MAR-2025 (ERU) Signature:............................................... Approved By: Somashree Madan

Date: ...............................................

HOT WORK PERMIT

LOCATION DETAILS

Brand SOCIAL FV-GF-


Asset The Dubai Mall Unit No
Name DISTRIKT BFFH35

Department RDT

Location INSIDE SHOPE

Date Of
Friday, April 4, 2025
Application

Applicant Details

RAJESH PALLURKAD RAVEENDRAN Designati Mobile


Applicant Name ENGINEER 0503045476
PALLURKAD on Number

WORK MANAGER / ENGINEER RESPONSIBLE FOR EXECUTION

Store Manager
RAHUL Mobile Number 0502968805
Name

SUPERVISIOR AND SAFETY PRECAUTIONS CARRIED OUT BY FIRE WATCHER

Supervisor Name SREEHARI Mobile Number 0508128520

SAFETY MEASURES CHECKLIST

Sr.
Permit Purpose Name
No

1 Installation/Exhibition/Events(Minor)

2 Fire Watcher during hot work process

3 Fire blanket suspended underneath work

4 Hot Work exquipment i.e Grinder, Welding Machine

5 Fire Extinguishers available and in service/operable

6 Welder shall be certified and competent and wearing PPE

7 Hot work in Confined space require separate permit

8 Proper Housekeeping and area keep clean

SUPPORTING DOCUMENTS

Sr.
Document Name
No

1 Competency Certificate
2 Fire Watcher Certificate

DESCRIPTION OF WORK CARRIED OUT

FIT OUT AND MEP WORKS

DESCRIPTION OF THE WORK AND EQUIPMENTS USED (SPECIFY)

WATER PROOFING AND STRACTURAL WORKS

Instructions For Hot Work Permit:


a) Verify safety measures are in place.
b) New Permit shall be submitted for approval for time extension.
c) Completed and retain copy on site.
d) No smoking at all times.
e) The use of Aceylene is strictly forbidden at all times.

Disclaimer:
a) The Contractor must notify ERU Prior to the work and ensure all precautions are in place. Fire watcher will standby for the activites and
ensure hot work carried out/completed safely. HWP must be close-out by ERU after confirming that hot work completed and area is safe for
normal operation.
b) The applicant his/her service provider are fully responsible for ensuring the operation is carried out safely by competent persons and
workplace is safe for anyone that may be affected by the operation. The granting of permit by The Dubai Mall (TDM) shall not be construed as
The Dubai Mall (TDM) being responsible in any way, for any accident that may arise directly or indirectly from your work activities.

Acknowledgement:
I confirm that a safe system of work is in place and a full risk assessment and method statement has been completed for this activity of
conduct and that this has been the subject of a briefing to the persons involved in this task prior to the commencement of the activity. I have
verified that the above location has been Inspected during operations and the required PRECAUTIONS AND SAFEGUARDS have been
taken.

You might also like