0% found this document useful (0 votes)
17 views1 page

Alternative Water - Reduction

The MORO Data Center project in Dubai includes a landscape design that requires 906 liters of water per month for irrigation. The project will utilize treated sewage effluent (TSE) for 100% of its irrigation needs, connecting to the TSE network as an alternative water source. This initiative contributes to outdoor water use reduction and supports LEED certification efforts.

Uploaded by

Fawaz Kt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views1 page

Alternative Water - Reduction

The MORO Data Center project in Dubai includes a landscape design that requires 906 liters of water per month for irrigation. The project will utilize treated sewage effluent (TSE) for 100% of its irrigation needs, connecting to the TSE network as an alternative water source. This initiative contributes to outdoor water use reduction and supports LEED certification efforts.

Uploaded by

Fawaz Kt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

MORO Data Center, Dubai

OUTDOOR WATER USE REDUCTION – ALTERNATIVE WATER


The project design has the plants of trees and shrubs. As per the outdoor water use calculation, the
design landscape water requirement is 906 liter/ month (239.3 gallon/month) for peak month.

The project is connecting to the TSE network for landscape irrigation. Hence 100% of the irrigation demand are supplied
by TSE water connected to the irrigation tank as alternative water source.

Outdoor Water Use Reduction LEED Submission

You might also like