The document outlines the design and layout of the basement floor for the Hyatt Place Hotel Alula, including various rooms, facilities, and their respective dimensions. It includes general notes on scaling, dimensions, and the need for site verification, as well as an occupancy schedule detailing the number of occupants for different areas. The drawing is part of a larger project and includes safety layout considerations.

Uploaded by

Fawaz Kt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views1 page

Ytuurrt

The document outlines the design and layout of the basement floor for the Hyatt Place Hotel Alula, including various rooms, facilities, and their respective dimensions. It includes general notes on scaling, dimensions, and the need for site verification, as well as an occupancy schedule detailing the number of occupants for different areas. The drawing is part of a larger project and includes safety layout considerations.

Uploaded by

Fawaz Kt
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

KEY PLAN:

CW-27

FUTURE
CONNECTION TO
N 2943800.767E PLOT 1 NORTH
N 2943845.651E
POTENTIAL
393034.916 FUTURE
393133.768 Q
CONNECTION TO
PLOT 1 NORTH GENERAL NOTES:
1. DO NOT SCALE FROM THE DRAWINGS.

2. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METRES UNLESS NOTED


OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON SITE & APPROVED BY THE
ENGINEER.
Water
Feature 3. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT
Pump Rm ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL AND CIVIL DRAWINGS
DHW Pump Room AND ALL RELEVANT SECTIONS OF THE SPECIFICATIONS.
Elec. & IDF
MCC Room

Greywater
Tank

Basement 2
-4.800 FFL
Treated Treated

EXIT
Greywater Mech. Water Water
Room -4.200 FFL/SSL Tank Tank
02 01

IDF

DCW Tank 2 DCW Tank 1


DCW Pump Room

EXIT
Stair ST01 Stair ST03

EXIT

IDF
Fire
Wet Valet
tank
Waste Laundry
-4.200 FFL
Chiller
Holding OS&E
Store Store
Toilet
Toilet

TRAVEL DISTANCE 29 M< 75 M Compressor


BOH
FOR SPRINKLER Circulation

TRAVEL DISTANCE 32 M< 75 M


Laundry
Minibar

FOR SPRINKLER
Slope Manager
Store
Loading Dock Veg.
Sanitizing
1:12 -4.200 FFL/SSL 00 Rev. For Submission 30 NOV 24
Rev. No. Description Date
Florist Clean Linen
Store Store OWNER:
Waste Room
Loading Dock Check-In
-4.800 FFL &
Slope 1:20 Decant

TRAVEL DISTANCE 57 M< 120 M


Cleaning
Equipment

Dirty Linen

FOR SPRINKLER
EXIT
Recycling Store Chemical Lost and HK Gen. FOH
Security Found Office
Slope 1:12 Store Store Circulation

PROJECT MANAGEMENT CONSULTANT:


Rec. & Purch.
Off. BOH BOH Eng.
Circulation Circulation General
Dirty O.L AREA
19 4907
Dir. of Eng. Workshop
Office
First Office

EXIT
2
Aid Elec. Room
HK Exec. Control M
Office PL01-02 Engineering PL03-04
HACCP BOH SL01 General
Room OCCUPANT
PL05
Office Circulation Store
Gen.
259 P
Ice Bank Clean
SL02 SL03 Storage
Toilet Toilet Stair Gen. Workshop
Janitor
ST06 Office
Stair EXIT Storage Storage CONSULTATION SUPERVISIONS CONSULTANT:
General ST04 Storage Storage
Freezer
Veg. Dairy BOH Tool

EXIT
Stair Chiller Chiller Circulation -4.100 FFL BOH BOH Store
EXIT

ST05 Circulation Circulation


BOH Cleaner's
Veg. Fruit & Circulation Store
Uniform IDF

Janitor
Pick
Freezer Veg
Prep.
EXIT
Event
Storage DESIGN AND BUILD CONTRACTOR:
Meat/Poutlry Garde Potwash
Prep. Manger
Service
Parking
EXIT

Meat D/F Meat Chef's Holding


Ramp Male
Chiller Office Chiller
Blast TRAVEL DISTANCE 68 M< 120 M
Showers Chiller
EXIT FOR SPRINKLER
-4.200 FFL/SSL

Fish Fish Prep.


Chiller DESIGN AND BUILD CONSULTANT:
Hot Kitchen

Pump Room
Bakery D/F Pastry Consulting Engineers & Partners
Pastry Guests Al-Jemaiah Commercial Center
King Fahd Rd & King Abdullah Rd Junction
Bakery
Chiller
Finished
Product
Parking Riyadh
Male Lockers Dry
chiller Store Ramp Kingdom of Saudi Arabia

290 lockers
UPS Room IDF
Beverage
Store FLS CONSULTANT:

Bakery Pantry Buffet Dishwasher


C:\Users\mustafa.galal\Documents\RCU-DC-APD-MP2-BHD-EHF-R3-P1-M3-FA-810000_abdelrahman.mustafaBRU9R.rvt

-4.100 FFL
Slope 1:20
Drop
EMAAR SUHAIL
Female
Showers Off ENGINEERING CONSULTANCY
Flour
Store TRAVEL DISTANCE 56 M< 75 M
Employee Dining
EMAAR
EXIT

FOR SPRINKLER
Room
PROJECT NAME :
Female Lockers
MDB Room -4.200 FFL/SSL -4.200 FFL/SSL

-4.400 FFL 194 lockers


Parking HYATT PLACE HOTEL ALULA
EXIT

EXIT
PROJECT DESCRIPTION :

Patio 1 BASEMENT + GROUND FLOOR + MEZZANINE FLOOR +


Female
Prayer
Male
Prayer
FIRST FLOOR + SECOND FLOOR + THIRD FLOOR + ROOF
Room Room Elec. & MCC Pool Mech. Room
Room
EXIT
ATS Room
TRAVEL DISTANCE 57 M< 75 M Stair ST02 DRAWING TITLE :
FOR SPRINKLER BOH
Circulation
Design drawings: BASEMENT FLOOR
LIFE SAFETY LAYOUT-OVERALL
N 2943702.676E
N 2943747.723E
393079.231
393178.231
DRAWING NUMBER :

RCU-DC-APD-MP2-BHD-EHF-R4-100-P1-00-1PLN-FS-8300000
BASEMENT 1 FLOOR
617 Person
AREA SCHEDULE EXIT PROJECT STAGE REVISION NO :
OCCUPANCY O.L.F
AREA SQ. M. Sq.M./ OCCUPANT LOAD mm/ OCCUPANT/
Person WIDTH OF STAIR OCCUPANT EXIT NO. OF EXIT OCCUPANT LOAD RIBA 4 00
PARKING 4907 19 259 1390 MM 5.1 272 1 272
KITCHEN 531 19 28 SCALE : DRAWING SIZE :
1340 MM 5.1 262 2 524
BUSINESS 177 9 19 1260 MM 5.1 1
28 24
247 247 1 : 250 A1
ACCESSORY MECH. & ELEC. ROOM 665 1170 MM 5.1 229 1 229
ASSEMBLY 196 1.4 140 OFFICIAL USE ONLY :
1110 MM 5.1 215 1 215
ASSEMBLY (PRAYER AREA) 62 0.65 96
ASSEMBLY (CHANGING ROOMS) 234 4.6 51 TOTAL NO. OF OCCUPANT: 1487 Person

TOTAL NO. OF OCCUPANTS: 617 Person CURRENT WIDTH OF EXITS : 7600 MM