TARGET Deskripsi Personel/Equipment/Tools Jumlah Status Remarks No.
Equipment/Tools/Personel Jumlah Remarks
1 Area Pipeline 1 Exca Long arm PC-200 1 Unit On site 26 Aprl 2025
a. Start 2 Mei 2025 KP-1200 - KP-2000 2 Exca PC-200 1 Unit On site 29 Aprl 2025
3 WM 2 Unit On site 1 Mei 2025
b. 29 Aprl - 9 Mei 2025 KP-2001 - KP-2600 4 Weld tools set 2 Set On site 1 Mei 2025
`- Equipment 5 Chainbloc 2 Ton 2 Unit On site 1 Mei 2025
2 Exca (1 Exca Trenching, 1 Stringging/pushpull) 2 Unit To Provide 1 Unit PC-200 Tambahan 1 Exca PC-200 6 Level Bloc 2 Ton 2 Unit On site 1 Mei 2025
`- Manpower 7 Manual Torque On site 1 Mei 2025
2 Welder, 4 Fitter Ready on site 8 Floating Drum 205 ea Continue
Material Cold Bend material by MEPG 4 ea Follow up mob. To MEPG 29 Aprl mob. From JKT 9 Scaffolding TBA On site 10 Mei 2025
c. 29 Aprl - 11 Mei 2025 Reciever Area 10 Bambang (Welder) On site 1 Mei 2025
1. Accessories Fabrication at site 11 Dody (Welder) On site 1 Mei 2025
Sandblasting & coat painting at shop JKT 12 Alex (Fitter) On site 1 Mei 2025
2. Equipment 13 Frido (Fitter) On site 1 Mei 2025
Civil 14 Ismail (E/I) On site 10 Mei 2025
Exca Mini 1 Unit Ready on site 15 Painter (TBA)
TMC 1 Unit Ready on site 16 Safety Standby On site 29 Aprl 2025
Piping 17 TBA (Welder Piping) On site 13 Mei 2025
WM 2 Unit To Provide 1 Mei on site 18 TBA (Welder Piping) On site 13 Mei 2025
Weld tools set 2 Set To Provide 1 Mei on site 19 Ilham (Civil) On site 10 Mei 2025
Chainbloc 2 Ton 2 Unit To Provide 1 Mei on site 20 ntis (Civil) On site 10 Mei 2025
Level Bloc 2 Ton 2 Unit To Provide 1 Mei on site 21 ntis 2 (Civil) On site 10 Mei 2025
Manual Torque To Provide 1 Mei on site 22 TBA (E/I) On site 15 Mei 2025
3. Manpower 23 TBA (E/I) On site 15 Mei 2025
Mech. Piping 24 TBA (E/I) On site 15 Mei 2025
Kuwat (WL) Ready on site 25 TBA (E/I) On site 15 Mei 2025
QC 26 Scaffolder (LOKAL) On site 15 Mei 2025
Arjuandi Ready on site 27 Scaffolder (LOKAL) On site 15 Mei 2025
Mech. Piping
Manpower
Bambang (Welder) To Provide 1 Mei on site
Dody (Welder) To Provide 1 Mei on site
Alex (Fitter) To Provide 1 Mei on site
Frido (Fitter) To Provide 1 Mei on site
Civil
Ferian (WL) Ready on site
QC
Ferian Ready on site
Civil Manpower
Hamdan & Lokal MP Ready on site
E/I
Erick (WL) Posisi di WS On site 10 Mei
QC
Erick Posisi di WS On site 10 Mei
E/I MP
Dopo Ready on site
Ismail To Provide On site 10 Mei
Hydrotest
Tim Hydrotest menggunakan personel yang
Eko & tim Ready on site
ada, air menggunakan air di mess
Coating
M. Yusuf Ready on site
TBA To Provide 1 personel akan brangkat dari Palembang
Additional tim
Safety Standby By PBSA To Provide 29 Aprl on site
Aryariendo (PTW Coor.) Ready to Mob 28 Aprl on site
d Start 30 Aprl 2025 KP-0 - KP- 1200
akan selesai seminggu kedepan (Start point
Preparation
Tie in crossing menyesuaikan Section 2, 30 April)
mob RIG
Equipment
Exca long Arm (yang sudah ada) 1 Unit Proses MOB. mob 25 April
welding product. 4 Joint (48 Exca std. (Kuning) 1 Unit Ready on site
meter) Tambahan Drum 155 ea To Provide Bertahap akan dikirim ke site dari palembang
Manpower
Switch dari area section 1 (Rawa 36) Ready on site
2 Area Wellsite
1 Start 12 Mei 2025 Zona 1 (12 Mei 2025) VENT STACK AREA
Equipment
Spreaderbarr untuk pipe 12 m Exca mini 1 Unit Ready on site
jalur vent stack TMC 1 Unit Ready on site Akan dilakukan penambahan jika diperlukan
Manual Torque To Provide
Vent stack hydrotest di
Scaffolding TBA To Provide
Narogong
Manpower
Mech. Piping
Kuwat /Darno (WL) Ready on site
QC
Arjuandi Ready on site perlu 1 back to back
Mech. Piping MP
TBA (Welder Piping) To provide On site 13 Mei
TBA (Welder Piping) To provide On site 13 Mei
Civil
Ferian/Herman (WL) Ready on site
QC
Ferian/Herman Ready on site
Civil MP
Hamdan Ready on site
Ilham Ready to Mob. On site 10 Mei
ntis Ready to Mob. On site 10 Mei
ntis 2 Ready to Mob. On site 10 Mei
Lokal tim Ready on site
E/I
Erick/ TBA (WL) Ready to Mob. On site 10 Mei perlu 1 back to back
QC
Erick/ TBA Ready to Mob. On site 10 Mei perlu 1 back to back
E/I MP
Dopo Ready on site
Ismail Ready to Mob. On site 10 Mei
TBA To provide On site 15 Mei
TBA To provide On site 15 Mei
TBA To provide On site 15 Mei
TBA To provide On site 15 Mei
Lifting tim
Kasdan (WL) Ready on site
Susanto Ready on site
Rangga Ready on site
Angga Ready on site
Scaffolder Mugi (WL) Ready on site
Evran Ready on site
Lokal To provide On site 15 Mei
Lokal To provide On site 15 Mei