Name of Work: Widening & Strengthening of Surat-Sachin-Navsari Road km.
14/273 to 21/40 (SH-6) (From existing 4-Lane to 6-Lane) Under High Speed Corridor (Design Length=7.127 Km) in District Surat.
                                                                                                                                                                                TCS SCHEDULE
       Chainage (km)                                                                                                                                 TCS - LHS                                                                         TCS - RHS
Sr.                      Length   New TCS                                                                                      SR                                                                                                                                     SR                Pro.Road    Ext.Road                 Ext.ROW
                                                   Lane Configurations               Terrain Classification                             service   Seperato                                      Median                                        Seperato   service                                                 PROW (m)                     TCS Type                 Remark
No.   From      To        (m)       No.                                                                            Drain    shoulder/                      GSS/CB    PSS      CW        KS                KS       CW        PSS     GSS/CB                        shoulder/   Drain    Width (m)   Width (m)                   (m)
                                                                                                                                         road        r                                                                                           r        road
                                                                                                                               CB                                                                                                                                     CB
 1      2        3         4         6                      7                           8                9          10         11         12        13      14       15        16       17        18      19        20       21        22       23         24         25        26         10                                  11                 12                      13
                                                                                                                                                                                                                                                                                                                                           Strengthening and
 1    14+273   14+860     587      TCS-1      6 lane with 1.5m Raised Median      Plain & Rolling   Open Country                                           1.00 m   1.50 m   10.50 m   0.50 m   1.00 m   0.50 m   10.50 m   1.50 m   1.00 m                                              28.00 m     15.00 m       36.00 m   36.00 m
                                                                                                                                                                                                                                                                                                                                               Widening
                                            4-Lane Main Carriageway with 5.5 m
 2    14+860   15+118     258      TCS-3    Service Roads (Approach to Elevated   Plain & Rolling     Built-up     1.50 m               5.50 m    0.50 m   0.50 m   2.00 m   7.00 m    0.50 m   1.00 m   0.50 m   7.00 m    2.00 m   0.50 m    0.50 m    5.50 m                1.50 m    36.00 m     15.00 m       36.00 m   36.00 m        Reconstruction
                                                         Corridor)
                                             4 Lane Elevated Corridor < 5.5m
 3    15+118   15+328     210     TCS-3A                                          Plain & Rolling     Built-up     1.50 m               5.50 m    0.50 m   0.50 m   2.00 m   7.00 m    0.50 m   1.00 m   0.50 m   7.00 m    2.00 m   0.50 m    0.50 m    5.50 m                1.50 m    36.00 m     15.00 m       36.00 m   36.00 m        Reconstruction
                                                         clearnce
                                             4 Lane Elevated Corridor > 5.5m
 4    15+328   16+438    1110     TCS-3B                                          Plain & Rolling     Built-up     1.50 m               5.50 m    0.50 m                     7.00 m    0.50 m   6.00 m   0.50 m   7.00 m                       0.50 m    5.50 m                1.50 m    36.00 m     15.00 m       36.00 m   36.00 m        Reconstruction         Elevated Corridor
                                                         clearnce
                                             4 Lane Elevated Corridor < 5.5m
 5    16+438   16+618     180     TCS-3C                                          Plain & Rolling     Built-up     1.50 m               7.50 m    0.50 m   0.50 m   2.00 m   7.00 m    0.50 m   1.00 m   0.50 m   7.00 m    2.00 m   0.50 m    0.50 m    7.50 m                1.50 m    40.00 m     15.00 m       45.00 m   24.00 m        Reconstruction
                                             clearnce with 7.5 m Service Road
                                            4-Lane Main Carriageway with 7.5 m
 6    16+618   16+760     142      TCS-4    Service Roads (Approach to Elevated   Plain & Rolling     Built-up     1.50 m               7.50 m    0.50 m   0.50 m   2.00 m   7.00 m    0.50 m   1.00 m   0.50 m   7.00 m    2.00 m   0.50 m    0.50 m    7.50 m                1.50 m    40.00 m     15.00 m       45.00 m   24.00 m        Reconstruction
                                                         Corridor)
                                                                                                                                                                                                                                                                                                                                           Strengthening and
 7    16+760   18+380    1620      TCS-2       6 lane with 5m Raised Median       Plain & Rolling   Open Country                                           1.00 m   1.50 m   10.50 m   0.50 m   4.00 m   0.50 m   10.50 m   1.50 m   1.00 m                                              31.00 m     18.50 m       45.00 m   24.00 m
                                                                                                                                                                                                                                                                                                                                               Widening
                                            6-Lane Main Carriageway with 5.5 m
 8    18+380   19+580    1200      TCS-5        Service Roads (Approach to        Plain & Rolling     Built-up     1.50 m               5.50 m    0.50 m   0.50 m   1.50 m   10.50 m   0.50 m   4.00 m   0.50 m   10.50 m   1.50 m   0.50 m    0.50 m    5.50 m                1.50 m    45.00 m     18.50 m       45.00 m   24.00 m        Reconstruction               VUP
                                                       VUP/LVUP)
                                                                                                                                                                                                                                                                                                                                           Strengthening and
 9    19+580   19+900     320      TCS-2       6 lane with 5m Raised Median       Plain & Rolling   Open Country                                           1.00 m   1.50 m   10.50 m   0.50 m   4.00 m   0.50 m   10.50 m   1.50 m   1.00 m                                              31.00 m     18.50 m       45.00 m   24.00 m
                                                                                                                                                                                                                                                                                                                                               Widening
                                            6-Lane Main Carriageway with 5.5 m
10    19+900   20+760     860      TCS-5        Service Roads (Approach to        Plain & Rolling     Built-up     1.50 m               5.50 m    0.50 m   0.50 m   1.50 m   10.50 m   0.50 m   4.00 m   0.50 m   10.50 m   1.50 m   0.50 m    0.50 m    5.50 m                1.50 m    45.00 m     18.50 m       45.00 m   24.00 m        Reconstruction              LVUP
                                                       VUP/LVUP)
                                                                                                                                                                                                                                                                                                                                           Strengthening and
11    20+760   21+400     640      TCS-2       6 lane with 5m Raised Median       Plain & Rolling   Open Country                                           1.00 m   1.50 m   10.50 m   0.50 m   4.00 m   0.50 m   10.50 m   1.50 m   1.00 m                                              31.00 m     18.50 m       45.00 m   24.00 m
                                                                                                                                                                                                                                                                                                                                               Widening
                Total:   7127
                                                                                                                                                                                                                                                                                             Deputy Executive Engineer                    Executive Engineer
                                                                                                                                                                                                                                                                                           Surat (R&B) Sub-Division No.2               Surat (R&B) Division No.1
                                                                                                                                                                                                                                                                                                      Surat.                                    Surat.
Name of Work: Widening & Strengthening of Surat-Sachin-Navsari Road km. 14/273 to 21/40 (SH-6) (From existing 4-Lane to 6-Lane) Under High Speed Corridor (Design Length=7.127 Km) in District Surat.
                                                                                                                                                                            TCS SCHEDULE
       Chainage (km)                                                                                                                                   TCS - LHS                                                       TCS - RHS
Sr.                       Length     New TCS                                                                                     SR                                                                                                                   SR               Pro.Road    Ext.Road                Ext.ROW
                                                         Lane Configurations                 Terrain Classification                       service   Seperato                            Median                                Seperato   service                                                PROW (m)                    TCS Type             Remark
No.   From      To         (m)         No.                                                                            Drain   shoulder/                      GSS/CB   PSS   CW   KS                  KS   CW   PSS   GSS/CB                        shoulder/   Drain   Width (m)   Width (m)                  (m)
                                                                                                                                           road        r                                                                         r        road
                                                                                                                                 CB                                                                                                                   CB
Sr.         Length        Road
    TCS No.                                  TCS Name/ Lane Configuration                    Terrain                                                                                   Land Use                                                                                                                  Type of Proposal
No.          (Km)        Width (m)
 1    TCS-1      0.587     28.00     6 lane with 1.5m Raised Median                      Plain & Rolling                                                                              Open Country                                                                                                           Strengthening and Widening
 2    TCS-2      2.580     31.00     6 lane with 5m Raised Median                        Plain & Rolling                                                                              Open Country                                                                                                           Strengthening and Widening
                                     4-Lane Main Carriageway with 5.5 m Service Roads
 3    TCS-3      0.258     36.00                                                      Plain & Rolling                                                                                   Built-up                                                                                                                   Reconstruction
                                     (Approach to Elevated Corridor)
 4    TCS-3A     0.210     36.00     4 Lane Elevated Corridor < 5.5m clearnce            Plain & Rolling                                                                                Built-up                                                                                                                   Reconstruction
                                     4 Lane Elevated Corridor < 5.5m clearnce with 7.5
 5    TCS-3C     0.180     40.00                                                         Plain & Rolling                                                                                Built-up                                                                                                                   Reconstruction
                                     m Service Road
 6    TCS-3B     1.110     36.00     4 Lane Elevated Corridor > 5.5m clearnce            Plain & Rolling                                                                                Built-up                                                                                                                   Reconstruction
                                     4-Lane Main Carriageway with 7.5 m Service Roads
 7    TCS-4      0.142     40.00                                                      Plain & Rolling                                                                                   Built-up                                                                                                                   Reconstruction
                                     (Approach to Elevated Corridor)
                                     6-Lane Main Carriageway with 5.5 m Service Roads
 8    TCS-5      2.060     45.00                                                      Plain & Rolling                                                                                   Built-up                                                                                                                   Reconstruction
                                     (Approach to VUP/LVUP)
      Total:     7.127
                                                                                                                                                                                                                                                                            Deputy Executive Engineer                   Executive Engineer
                                                                                                                                                                                                                                                                          Surat (R&B) Sub-Division No.2              Surat (R&B) Division No.1
                                                                                                                                                                                                                                                                                     Surat.                                   Surat.