0% found this document useful (0 votes)
71 views2 pages

TCS S

The document outlines the project for widening and strengthening the Surat-Sachin-Navsari Road from 4-lane to 6-lane over a design length of 7.127 km in Surat district. It includes a detailed TCS schedule with specifications for lane configurations, terrain classifications, and types of proposals for various segments of the road. The project aims to enhance road capacity and safety under the High-Speed Corridor initiative.

Uploaded by

aegdrnh21
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views2 pages

TCS S

The document outlines the project for widening and strengthening the Surat-Sachin-Navsari Road from 4-lane to 6-lane over a design length of 7.127 km in Surat district. It includes a detailed TCS schedule with specifications for lane configurations, terrain classifications, and types of proposals for various segments of the road. The project aims to enhance road capacity and safety under the High-Speed Corridor initiative.

Uploaded by

aegdrnh21
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Name of Work: Widening & Strengthening of Surat-Sachin-Navsari Road km.

14/273 to 21/40 (SH-6) (From existing 4-Lane to 6-Lane) Under High Speed Corridor (Design Length=7.127 Km) in District Surat.

TCS SCHEDULE

Chainage (km) TCS - LHS TCS - RHS


Sr. Length New TCS SR SR Pro.Road Ext.Road Ext.ROW
Lane Configurations Terrain Classification service Seperato Median Seperato service PROW (m) TCS Type Remark
No. From To (m) No. Drain shoulder/ GSS/CB PSS CW KS KS CW PSS GSS/CB shoulder/ Drain Width (m) Width (m) (m)
road r r road
CB CB
1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 10 11 12 13
Strengthening and
1 14+273 14+860 587 TCS-1 6 lane with 1.5m Raised Median Plain & Rolling Open Country 1.00 m 1.50 m 10.50 m 0.50 m 1.00 m 0.50 m 10.50 m 1.50 m 1.00 m 28.00 m 15.00 m 36.00 m 36.00 m
Widening
4-Lane Main Carriageway with 5.5 m
2 14+860 15+118 258 TCS-3 Service Roads (Approach to Elevated Plain & Rolling Built-up 1.50 m 5.50 m 0.50 m 0.50 m 2.00 m 7.00 m 0.50 m 1.00 m 0.50 m 7.00 m 2.00 m 0.50 m 0.50 m 5.50 m 1.50 m 36.00 m 15.00 m 36.00 m 36.00 m Reconstruction
Corridor)
4 Lane Elevated Corridor < 5.5m
3 15+118 15+328 210 TCS-3A Plain & Rolling Built-up 1.50 m 5.50 m 0.50 m 0.50 m 2.00 m 7.00 m 0.50 m 1.00 m 0.50 m 7.00 m 2.00 m 0.50 m 0.50 m 5.50 m 1.50 m 36.00 m 15.00 m 36.00 m 36.00 m Reconstruction
clearnce

4 Lane Elevated Corridor > 5.5m


4 15+328 16+438 1110 TCS-3B Plain & Rolling Built-up 1.50 m 5.50 m 0.50 m 7.00 m 0.50 m 6.00 m 0.50 m 7.00 m 0.50 m 5.50 m 1.50 m 36.00 m 15.00 m 36.00 m 36.00 m Reconstruction Elevated Corridor
clearnce

4 Lane Elevated Corridor < 5.5m


5 16+438 16+618 180 TCS-3C Plain & Rolling Built-up 1.50 m 7.50 m 0.50 m 0.50 m 2.00 m 7.00 m 0.50 m 1.00 m 0.50 m 7.00 m 2.00 m 0.50 m 0.50 m 7.50 m 1.50 m 40.00 m 15.00 m 45.00 m 24.00 m Reconstruction
clearnce with 7.5 m Service Road
4-Lane Main Carriageway with 7.5 m
6 16+618 16+760 142 TCS-4 Service Roads (Approach to Elevated Plain & Rolling Built-up 1.50 m 7.50 m 0.50 m 0.50 m 2.00 m 7.00 m 0.50 m 1.00 m 0.50 m 7.00 m 2.00 m 0.50 m 0.50 m 7.50 m 1.50 m 40.00 m 15.00 m 45.00 m 24.00 m Reconstruction
Corridor)
Strengthening and
7 16+760 18+380 1620 TCS-2 6 lane with 5m Raised Median Plain & Rolling Open Country 1.00 m 1.50 m 10.50 m 0.50 m 4.00 m 0.50 m 10.50 m 1.50 m 1.00 m 31.00 m 18.50 m 45.00 m 24.00 m
Widening
6-Lane Main Carriageway with 5.5 m
8 18+380 19+580 1200 TCS-5 Service Roads (Approach to Plain & Rolling Built-up 1.50 m 5.50 m 0.50 m 0.50 m 1.50 m 10.50 m 0.50 m 4.00 m 0.50 m 10.50 m 1.50 m 0.50 m 0.50 m 5.50 m 1.50 m 45.00 m 18.50 m 45.00 m 24.00 m Reconstruction VUP
VUP/LVUP)
Strengthening and
9 19+580 19+900 320 TCS-2 6 lane with 5m Raised Median Plain & Rolling Open Country 1.00 m 1.50 m 10.50 m 0.50 m 4.00 m 0.50 m 10.50 m 1.50 m 1.00 m 31.00 m 18.50 m 45.00 m 24.00 m
Widening
6-Lane Main Carriageway with 5.5 m
10 19+900 20+760 860 TCS-5 Service Roads (Approach to Plain & Rolling Built-up 1.50 m 5.50 m 0.50 m 0.50 m 1.50 m 10.50 m 0.50 m 4.00 m 0.50 m 10.50 m 1.50 m 0.50 m 0.50 m 5.50 m 1.50 m 45.00 m 18.50 m 45.00 m 24.00 m Reconstruction LVUP
VUP/LVUP)
Strengthening and
11 20+760 21+400 640 TCS-2 6 lane with 5m Raised Median Plain & Rolling Open Country 1.00 m 1.50 m 10.50 m 0.50 m 4.00 m 0.50 m 10.50 m 1.50 m 1.00 m 31.00 m 18.50 m 45.00 m 24.00 m
Widening
Total: 7127

Deputy Executive Engineer Executive Engineer


Surat (R&B) Sub-Division No.2 Surat (R&B) Division No.1
Surat. Surat.
Name of Work: Widening & Strengthening of Surat-Sachin-Navsari Road km. 14/273 to 21/40 (SH-6) (From existing 4-Lane to 6-Lane) Under High Speed Corridor (Design Length=7.127 Km) in District Surat.

TCS SCHEDULE

Chainage (km) TCS - LHS TCS - RHS


Sr. Length New TCS SR SR Pro.Road Ext.Road Ext.ROW
Lane Configurations Terrain Classification service Seperato Median Seperato service PROW (m) TCS Type Remark
No. From To (m) No. Drain shoulder/ GSS/CB PSS CW KS KS CW PSS GSS/CB shoulder/ Drain Width (m) Width (m) (m)
road r r road
CB CB
Sr. Length Road
TCS No. TCS Name/ Lane Configuration Terrain Land Use Type of Proposal
No. (Km) Width (m)

1 TCS-1 0.587 28.00 6 lane with 1.5m Raised Median Plain & Rolling Open Country Strengthening and Widening

2 TCS-2 2.580 31.00 6 lane with 5m Raised Median Plain & Rolling Open Country Strengthening and Widening

4-Lane Main Carriageway with 5.5 m Service Roads


3 TCS-3 0.258 36.00 Plain & Rolling Built-up Reconstruction
(Approach to Elevated Corridor)

4 TCS-3A 0.210 36.00 4 Lane Elevated Corridor < 5.5m clearnce Plain & Rolling Built-up Reconstruction

4 Lane Elevated Corridor < 5.5m clearnce with 7.5


5 TCS-3C 0.180 40.00 Plain & Rolling Built-up Reconstruction
m Service Road

6 TCS-3B 1.110 36.00 4 Lane Elevated Corridor > 5.5m clearnce Plain & Rolling Built-up Reconstruction

4-Lane Main Carriageway with 7.5 m Service Roads


7 TCS-4 0.142 40.00 Plain & Rolling Built-up Reconstruction
(Approach to Elevated Corridor)
6-Lane Main Carriageway with 5.5 m Service Roads
8 TCS-5 2.060 45.00 Plain & Rolling Built-up Reconstruction
(Approach to VUP/LVUP)
Total: 7.127

Deputy Executive Engineer Executive Engineer


Surat (R&B) Sub-Division No.2 Surat (R&B) Division No.1
Surat. Surat.