Checklist for Pre-Engineered Building (PEB) Structure
1. Pre-Design Phase
[ ] Site Survey and Soil Testing Completed
[ ] Load Calculations (Dead, Live, Wind, Seismic)
[ ] Building Usage and Functional Requirements Identified
[ ] Dimensions (Length, Width, Height) Finalized
[ ] Required Clearances and Bays Specified
[ ] Local Building Codes and Standards Reviewed
2. Design Phase
[ ] Structural Design Using Software (STAAD, Tekla, etc.)
[ ] Frame Geometry Finalized (Rigid Frame, Multi-span, etc.)
[ ] Secondary Members Designed (Purlins, Girts, Bracings)
[ ] Roof and Wall Panel Design
[ ] Foundation Design Coordinated
[ ] Connection Details Prepared
[ ] Shop Drawings and GA Drawings Approved
3. Fabrication Phase
[ ] Material Procurement (Steel, Fasteners, Panels)
[ ] CNC Cutting and Drilling Completed
[ ] Welding and Assembly as per Drawings
[ ] Quality Checks: Dimensional, Welding, Material Grades
[ ] Surface Preparation (Shot Blasting, Cleaning)
[ ] Primer and Final Coating Applied
[ ] Pre-Shipment Inspection Done
4. Erection Phase
[ ] Foundation Anchor Bolts Checked
[ ] Main Frame Erection (Columns, Rafters)
[ ] Secondary Member Installation (Purlins, Girts)
[ ] Bracing and Connection Tightening
Checklist for Pre-Engineered Building (PEB) Structure
[ ] Roofing and Cladding Installation
[ ] Gutters, Downspouts, and Flashings Installed
[ ] Final Alignment and Verticality Checks
[ ] Safety Measures in Place Throughout
5. Final Inspection and Handover
[ ] Structural Integrity Verified
[ ] Bolt Tightness and Welds Checked
[ ] Roof Leak and Cladding Inspection
[ ] Painting/Coating Touch-Ups Done
[ ] As-Built Drawings Submitted
[ ] Completion Certificate Issued