0% found this document useful (0 votes)
16 views2 pages

Cover

This document is a Material Approval Request for the Surge Arrestor Grounding Cable related to the Al Shuaibah 1 PV Project. It was issued for approval on November 28, 2023, and is the first version of the document. The owner is Al Shuaibah Holding, and the owner's engineer is Astrom Technical Advisor, S.L.

Uploaded by

Awais Ali Shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views2 pages

Cover

This document is a Material Approval Request for the Surge Arrestor Grounding Cable related to the Al Shuaibah 1 PV Project. It was issued for approval on November 28, 2023, and is the first version of the document. The owner is Al Shuaibah Holding, and the owner's engineer is Astrom Technical Advisor, S.L.

Uploaded by

Awais Ali Shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

OWNER:

AL SHUAIBAH HOLDING

OWNER’S ENGINEER:

ASTROM TECHNICAL ADVISOR, S.L.

CONTRACTOR:

CONTRACTOR CONSULTANT:

0 28/11/2023 ISSUED FOR APPROVAL

REV DATE PREPARED CHECKED APPROVED DESCRIPTION

PROJECT: Al SHUAIBAH 1 PV PROJECT

DOCUMENT
Material Approval Request For Surge Arrestor Grounding Cable
TITLE:
DOCUMENT ISSUED
ASB-MAR-PVS-GEN-GENEL-FQE-ECI-252-0 REV 0 IFA
NO.: FOR

PLACE RESERVED FOR STAMPS:


Revision Record

Rev. Date Section Page Modification

0 28/11/2023 All All First Issue

You might also like