Program of Work

The document outlines the program of work for the construction of a 4-storey apartment building in Tuguegarao City, Cagayan, with a completion timeline of 365 days. It details the labor, equipment, and material requirements for various construction activities, along with their estimated costs, totaling approximately P 9,226,558.81. The project is prepared by Architect Michael Kr R. Palattao and approved by owner John Mark Q. Flores.

Uploaded by

Gray Wander Boy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views1 page

Program of Work

The document outlines the program of work for the construction of a 4-storey apartment building in Tuguegarao City, Cagayan, with a completion timeline of 365 days. It details the labor, equipment, and material requirements for various construction activities, along with their estimated costs, totaling approximately P 9,226,558.81. The project is prepared by Architect Michael Kr R. Palattao and approved by owner John Mark Q. Flores.

Uploaded by

Gray Wander Boy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROGRAM OF WORK

Name of Project: CONSTRUCTION OF 4-STOREY APARTMENT BUILDING


Location of Project: CARIG SUR, TUGUEGARAO CITY, CAGAYAN
Starting Date: Upon Approval
Time of Completion: 365 C. D. Project Dimension: 8.0 m x 12.0 m

LABOR/EQUIPTMENT/REQUIREMENTS
ITEM NO. DESCRIPTION OF WORK % OF
DESCRIPTION NEEDED (unit)
I SITE WORKS 1.385% CIVIL ENGINEER / SITE ENGINEER, SITE ARCHITECT 1
II FORMWORKS 1.494% SKILLED AND SEMI SKILLED 1
III REBAR WORKS 16.977% SAFETY ENGINEER 3 1
IV CONCRETE WORKS 11.895% BAGGER MIXER / TRANSIT MIXER 1
V MASONRY WORKS 9.209% BACKHOE / EXCAVATOR (OWN/RENT) ALL
VI PLASTERING WORKS 3.110% FOREMAN ALL
VII STEEL DECKING INSTALLATION 4.699% SKILLED AND SEMI SKILLED ALL
VIII TINNERY WORKS 1.988% LABOR/EQUIPTMENT/REQUIREMENTS ALL
IX ROOF FRAMING WORKS 1.675% TIME KEEPER ALL
X ELECTRICAL WORKS 5.276% ELECTRICAL ENGINEER
XI CEILING WORKS 3.719%
XII DOORS AND WINDOWS INSTALLATION 7.549%
XIII PLUMBING WORKS 5.982%
XIV RAILINGS INSTALLATION 1.734%
XV SEPTIC TANK CONSTRUCTION 2.336%
XVI PAINTING WORKS 6.591%
XVII WATERPROOFING APPLICATION 0.115%
XVIII TILE WORKS 13.024%
XIV WALL PARTITIONING SYSTEM 1.243%
TOTAL 100.000%

ESTIMATED COST OF WORK


ITEM NO. DESCRIPTION OF WORK UNIT QUANTITY
UNIT COST AMOUNT
I SITE WORKS lot 1 127,826.500 127,826.50
II FORMWORKS lot 1 137,833.333 137,833.33
III REBAR WORKS kgs 18,905.360 82.855 1,566,411.23
IV CONCRETE WORKS m³ 113.276 9,688.810 1,097,505.39
V MASONRY WORKS m² 867.850 979.024 849,646.07
VI PLASTERING WORKS m² 427.900 670.484 286,900.00
VII STEEL DECKING INSTALLATION m² 122.500 3,539.184 433,550.00
VIII TINNERY WORKS m² 557.760 328.860 183,425.00
IX ROOF FRAMING WORKS kgs 1,302.720 118.601 154,504.00
X ELECTRICAL WORKS lot 1 486,759.000 486,759.00
XI CEILING WORKS m² 410.000 836.939 343,145.00
XII DOORS AND WINDOWS INSTALLATION lot 1 696,500.000 696,500.00
XIII PLUMBING WORKS lot 1 551,976.000 551,976.00
XIV RAILINGS INSTALLATION lot 1 160,000.000 160,000.00
XV SEPTIC TANK CONSTRUCTION lot 1 215,572.288 215,572.29
XVI PAINTING WORKS m² 541.620 1,122.706 608,080.00
XVII WATERPROOFING APPLICATION m² 96.000 110.417 10,600.00
XVIII TILE WORKS m² 208.000 5,777.043 1,201,625.00
XIV WALL PARTITIONING SYSTEM lot 1.000 14,400.000 114,700.00
TOTAL ESTIMATED COST ( LABOR AND MATERIALS) P 9,226,558.81

PREPARED BY: APPROVED BY:

MICHAEL KR R. PALATTAO JOHN MARK Q. FLORES


ARCHITECT OWNER