The document outlines the Quality Assurance Plan for 33/11 kV GIS & RMU SF6 Gas Insulated Switchgear by CG Power & Industrial Solutions Limited. It details the testing procedures, responsibilities for testing, and acceptance norms for various components and operations involved in the manufacturing process. Additionally, it includes information on raw material inspection, product testing, factory acceptance tests, and packing and dispatch procedures.

Uploaded by

bibratswain1996
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
99 views3 pages

Qap Rmu

The document outlines the Quality Assurance Plan for 33/11 kV GIS & RMU SF6 Gas Insulated Switchgear by CG Power & Industrial Solutions Limited. It details the testing procedures, responsibilities for testing, and acceptance norms for various components and operations involved in the manufacturing process. Additionally, it includes information on raw material inspection, product testing, factory acceptance tests, and packing and dispatch procedures.

Uploaded by

bibratswain1996
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Manufacturer, Name & Address

CG Power & Industrial Solutions Limited


(Formerly Crompton Greaves Limited), QUALITY ASSURANCE PLAN FOR 33/11 kV GIS & RMU SF6 Gas Insulated Switchgear
A-3 , M.I.D.C. , Ambad
NASHIK
Name OF Customer -
Code 1 Indicates who shall Perform the tests Code 2 Indicates who shall Review the tests
A CGPISL A CGPISL
B Vendor B Vendor
C Contractor/ End Customer/ Inspecting Authority C Contractor/ End Customer/ Inspecting Authority

Code 3 Indicates who shall witness the tests i.e. Witnessing Agency
A CGPISL
B Vendor
C Contractor/ End Customer/ Inspecting Authority

Quantum of Check /
` SR No Components / Operations & Description of Test Type of Check Reference Document for Testing Acceptance Norms Format of Record Applicable Codes Remarks
Sampling with basis

A Raw / Incoming Material Inspection Code Number


1 2 3
1 Current Transformer
i Verification of terminal markings 100% CMTC B A, C
ii RCT measurement 100% CMTC B A, C
iii 1 min. power freq. withstand test voltage on secondary Dimensional, 100% CMTC B A, C
iv Excitation characteristics Electrical, 100% IEC 61869-1/2 IEC 61869-1/2 CMTC B A, C
v Turns ratio test,ISF, Polarity Mechanical 100% CMTC B A, C
vi Inter turn over voltage test 100% CMTC B A, C
vii Accuracy test, Knee point 100% CMTC B A, C

2 Voltage transformer/Potential Transformer


i Verification of terminal markings 100% CMTC B A, C
Power frequency withstand tests on primary windings and partial
ii Dimensional, 100% CMTC B A, C
discharges measurement
Electrical, IEC 61869-1/3 IEC 61869-1/3
Power frequency withstand tests between sections and on secondary
iii Mechanical 100% CMTC B A, C
windings
iv Accuracy class designation 100% CMTC B A, C

3 Relay
i Rotuine Testing of the equipment Electrical 100% As per IEC 61869-1/3 As per IEC 61869-1/3 CMTC B A, C

4 Fabrication -Stainless Steel & Sheet metal (CR / HR)


i Chemical composition
ii Tensile verify 100% As per drg / Plant Standard As per drg / Plant Standard CM TC B A, C
iii Dimension test

5 Closing/ tripping coils


i Resistance as per drawing Electrical 100% CGPISL Drawing / Specification CGPISL Drawing / Specification EMTC B A, C

6 Spring Charging Motor


CGPISL Drawing / Specification / IS CGPISL Drawing / Specification / IS
i Visual Checks for Make, Type & Rating Visual 100% EMTC B A, C
996 996

7 1.1kV Wiring cable


i Resistance and insulation test Visual 100% CMTC B A, C
As per approved tech spec / drawing As per approved tech spec / drawing
ii Resistivity & HV test Visual 100% CMTC B A, C
8 SF6 Gas
Routine test Report (Moisture,CF4 content check, purity As per CGPISL drawing and As per CGPISL drawing and
i Test As per CMTC CMTC B A, C
check) Specification / IEC Specification / IEC

9 Epoxy Components
i Surface finish Visual 100% CMTC B K P
ii Threading Insert Visual 100% CMTC B K P
As per CGPISL drawing and As per CGPISL drawing and
iii Dimensional Check Measurement 100% CMTC B K P
Specification Specification
iv HV Test ( If specified ) Electrical 100% CMTC B K P
v Partial Discharge ( If specified ) Electrical 100% CMTC B K P

C Finish Product Testing & inspection

1 HV Tank Assembly
i Disconnector Position verification Perform 100% IEC62271-200 IEC62271-200 EMTC A C A
ii Dielectric test on main circuit Perform 100% IEC62271-200 IEC62271-200 EMTC A C A
iii Measurement of resistance of main circuit Perform 100% IEC62271-200 IEC62271-200 EMTC A C A
iv Mechanical operation test Perform 100% IEC62271-200 IEC62271-200 EMTC A C A

2 Factory Routine Testing / In process at CGPISL


i SF6 gas leakage test (by Sniffing method) Electrical 100% IEC 62271-200 IEC 62271-200 EM-RTR A C A
ii Tightness Test Perform 100% IEC62271-200 IEC62271-200 EMTC A C A
iii Design, Dimension & Visual check Electrical 100% IEC 62271-200 IEC 62271-200 EM-RTR A C A
iv Main circuit power frequency voltage withstand test Electrical 100% IEC 62271-200 IEC 62271-200 EM-RTR A C A
Mechanical operating test for circuit breaker
v 5 close and 5 open operation at rated min and max control voltage at Mechanical 100% IEC 62271-200 IEC 62271-200 EM-RTR A C A
rated voltage.
vi Mechanical operating test for disconnector Mechanical 100% IEC 62271-200 IEC 62271-200 EM-RTR A C A
vii Contact resistance Electrical 100% IEC 62271-200 IEC 62271-200 EM-RTR A C A
viii Voltage withstand test on auxiliary circuit Perform 100% IEC 62271-100 IEC 62271-100 CM-TC A C A

D Factory acceptance tests


1) HV test on Main Circuit
i Electrical IEC 62271-200 IEC 62271-200 EMTC A C
2) HV test on Aux. Circuits
Electrical/Mecha
ii Mechanical operation tests on VCB & disconnector switches : IEC 62271-200 IEC 62271-200 EM-RTR A C
nical
iii Contact resistance measurement - 10% of the lot Electrical IEC 62271-200 IEC 62271-200 EM-RTR A C
SF 6 Gas leakage test by sniffing method - Routine test report
iv Mechanical IEC 62271-200 IEC 62271-200 EM-RTR A C
to be verified.
Check for operation of relays and meters by primary / 10%
v Electrical IEC 62271-200 IEC 62271-200 EM-RTR A C
secondary injection
vi Check of correct SF6 gas pressure Mechanical IEC 62271-200 IEC 62271-200 EM-RTR A C
vii Paint thickness measurement & Shade Appearance Mechanical IEC 62271-200 IEC 62271-200 EM-RTR A C
Electrical /
viii Schematic functional tests / Wiring IEC 62271-200 IEC 62271-200 EM-RTR A C
Mechanical
ix Bill of materials check & Dimensional Check Visual IEC 62271-200 IEC 62271-200 EM-RTR A C
x VPI (Voltage Presences Indicator) Visual IEC 62271-200 IEC 62271-200 EM-RTR A C

E Finishing check
As per Approved Power Grid As per Approved Power Grid
i Check completeness of spare parts(if applicable) Visual 100% A A
specification / TS / drawing specification / TS / drawing
F Packing / Dispatch
As per manufacturer guideline &
i Packing of complete GIS Visual 100% As per manufacturer guideline & Practice A A
Practice
As per manufacturer guideline &
ii Verification of completeness of equipment Visual 100% As per manufacturer guideline & Practice A A
Practice
As per manufacturer guideline &
iii Check for Packing , Destination marking/ Handling instructions Visual 100% As per manufacturer guideline & Practice A A
Practice
As per manufacturer guideline &
iv Verification of CIP/MICC reference on packing cases Verify 100% As per manufacturer guideline & Practice A A
Practice

STR :Supplier Test Report,IIP :Incoming Inspection Plan,MES : Manufacturing Execution System, FAT : Factory acceptance test ,CMTC :Component Manufactures test certificates/Compliances, EM-RTR: Equipment Manufacturer test record, EM-
FATR:Equipment manufacturer factory acceptance test record

Reviwed By Approved By Customer Approved By

Pankaj Gupta -Dy. Manager QA Pradeep Deo - Manager QA