0% found this document useful (0 votes)
63 views6 pages

Power Management

The document provides an overview of the Power Management system for Kongsberg Maritime's AIM2000 version 7.3.x, detailing the construction and operation of power generation and distribution. It describes various generator modes, control sequences, and the operation menu for managing generators, including load-dependent start/stop functions. Additionally, it explains the role of the switchboard in managing load sharing among multiple generators.

Uploaded by

artur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views6 pages

Power Management

The document provides an overview of the Power Management system for Kongsberg Maritime's AIM2000 version 7.3.x, detailing the construction and operation of power generation and distribution. It describes various generator modes, control sequences, and the operation menu for managing generators, including load-dependent start/stop functions. Additionally, it explains the role of the switchboard in managing load sharing among multiple generators.

Uploaded by

artur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Kongsberg Maritime

POWER MANAGEMENT
Understanding the construction and operating
the Power Management

AIM2000 ver. 7.3.x

© KONGSBERG 1

06/01/09
Kongsberg Maritime

Power Management

Schematic overview of power production and distribution


Switch
Generator: symbol, text, instrument panel Board
load -
and
Bus tie
consumer
control

Emergency Heavy
generator consumers
- not - not
operational operational

© KONGSBERG 2

Generators load mode


Description in line 1 in the generator symbol
The generators operate in one of four modes:
• Manual: All operations are done by the operator
• Symmetric: Shares the load equally between the
generators
• Asymmetric: Shares the load unequally between the
generators. Main generator takes 80% of its maximum
load.
• Fix: Sets the load at the level shown when the
command is executed

06/01/09
Kongsberg Maritime

Generators control mode

The generators can be in standby or not-


standby mode

Not-standby generators are excluded from


the automatic operation sequence
controlled by the SVC

Standby generators are ready for


activating

All standby generators have a standby


number which determines the order of
automatic operation

The generators are started in ascending


order and stopped in descending order
© KONGSBERG 3

Description in line 3 in the generator symbol


Start/stop-sequences are shown
Typical states are CONNECTED, STOPPED,
REDUCE LOAD and STOPPING

Description in line 4 in the generator symbol


BLOCKED Must be reset to remove the block
INHIBIT Operations are inhibited because values are
missing or out of range

06/01/09
Kongsberg Maritime

The generator operation menu

Click on a button to operate

To set a generator in standby mode:


Enter a standby number in the dialog
box

© KONGSBERG 4

STOP The generator must be disconnected before stopping


START The generator must be disconnected before starting
DISCONNECT The generator must be disconnected before stopping
CONNECT The generator must be running before connection
STANDBY Sets the generator in standby mode.
A dialog box for entering a standby number appears.
NOT STBY Sets the generator in not-standby mode
INCREASE Incr the load in manual mode, setp in fixed load
DECREASE Decr the load in manual mode, setp in fixed load
MANUAL Selects the manual mode for the generator
FIX Selects the fixed load for the generator
SYMMETRIC Selects the symmetric load for the generator
ASYMMETRIC Selects the asymmetric load for the generator
RESET Resets a blocked generator

06/01/09
Kongsberg Maritime

Switch Board

The SB manages the distribution net and load


sharing

One SB can manage up to 4 generators

Several SB’s can be connected with bus tie


breakers

Several SB’s connected operate as one unit

Bustie
breaker
© KONGSBERG 5

The symbol consists of:

BUS TIE: A thick, green line below the generator symbol

INSTRUMENT PANEL: The panel shows current load,


available load and SB modes.

OPERATION MENU: Click the left mouse button when


pointing at the value of load or available load on the
instrument panel

POP UP MENU: Click the right mouse button when


pointing at the thick green line

06/01/09
Kongsberg Maritime

Load dependent start/stop

- One or more generators must be in standby mode


- Load dependent start/stop can be initiated when limits in kW or %
are reached (% in this example)
- Load dependent start/stop is delayed to prevent start/stop signals
on temporary variations
- Load dependent start can have two limits: one with low level and long
time and one with high value and short time.

Number of Start Start Stop


connected DDGs limit 1 Delay limit 2 Delay limit Delay

1 84% 30s 90% 10s - -


2 86% 30s 91% 10s 70% 15min
3 88% 30s 92% 10s 70% 15min
4 - - - - 70% 15min
© KONGSBERG 6

Example:
Each generator max load 2400 kW.
2 generators are running. At what load do one more generator start?
2 x 2400 kW x 86% = 4128 kW in more than 30 sec or
2 x 2400 kW x 91% = 4368 kW in more than 10 sec.
What is the load when one of the 3 running generators stop?
2 x 2400 kW x 70% = 3360 in more than 15 min

06/01/09

You might also like