Unit of Competency : Perform Install Solar System
Time : 4 Hours
PRACTICAL ASSESSMENT
Candidate’s name & Registration No.
Assessor’s name & Reg. code
Venue of Assessment
Date of assessment
OBSERVATION CHECKLIST
INSTRUCTION TO THE ASSESSOR
1. Ensure all the materials and equipment are provided.
2. You are required to mark the practical as the candidate performs the tasks.
3. You are required to take video clips at critical points.
4. Ensure the candidate has a name tag and registration code at the back and front.
Page 1 of 3
Items to be evaluated: Marks Marks
available Comments
(Award appropriate marks for each item evaluated) obtaine
d
1. Worn safety clothing
i) Safety boots (𝐴𝑤𝑎𝑟𝑑 2 𝑜𝑟 0) 2
ii) Dustcoat (𝐴𝑤𝑎𝑟𝑑 2 𝑜𝑟 0) 2
iii) Helmet (𝐴𝑤𝑎𝑟𝑑 2 𝑜𝑟 0) 2
Sub total 6
TASK 1
2. Drew wiring diagram as per layout diagram
i. Cooker switch (𝐴𝑤𝑎𝑟𝑑 1 x 4) 3
(𝐴𝑤𝑎𝑟𝑑 3 𝑜𝑟 0)
(𝐴𝑤𝑎𝑟𝑑 4 𝑜𝑟 0)
ii. Heater switch 3
iii. Lighting 4
Sub total 10
TASK 2
3. Installed lighting correctly so that S1 control L1 and 8
S2 control L2. (𝐴𝑤𝑎𝑟𝑑 4 x 2 or 0 marks)
Sub total 8
TASK 3
4. Installed correctly:
(i) Water heater control circuit (𝐴𝑤𝑎𝑟𝑑 2 or 0 marks) 2
(ii) Cooker control unit (𝐴𝑤𝑎𝑟𝑑 2 or 0 marks) 2
(iii) Choice of cables (𝐴𝑤𝑎𝑟𝑑 2 or 0 marks) 2
Sub total 6
TASK 4
5. Correct procedure on 3
(i) Insulation resistance test (𝐴𝑤𝑎𝑟𝑑 3 or 0 marks )
(ii) Polarity test (𝐴𝑤𝑎𝑟𝑑 3 or 0 marks ) 3
Subtotal Total 6
TASK 5
Page 2 of 3
6. Correct wiring of the control gear
- Charge Controller 2
- Battery 2
- Inverter 2
- Solar Module 2
Handled tools Properly (𝐴𝑤𝑎𝑟𝑑 2 𝑜𝑟 0) 2
7. Dimensions (any 4 x1/2 correct dimensions ) 2
Observed color coding (𝐴𝑤𝑎𝑟𝑑 2 𝑜𝑟 0) 2
Sub total 15
Total marks 50
x/100
The candidate was found to be: (Please tick (√) as appropriate)
Competent Not yet competent
(The candidate is competent if s/he scores 50% and above)
Feedback from candidate:
Feedback to candidate:
Candidate’s signature: Date
Assessor’s signature: Date