1-Cutting List

The document outlines a practical assessment for installing solar systems, requiring candidates to perform various tasks including wiring a solar module and installing lighting circuits. It provides a detailed cutting list of materials needed for the assessment, including consumer units, switches, and cables. The assessment is designed to test candidates' skills in electrical installation and safety testing.

Uploaded by

Michael
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views2 pages

1-Cutting List

The document outlines a practical assessment for installing solar systems, requiring candidates to perform various tasks including wiring a solar module and installing lighting circuits. It provides a detailed cutting list of materials needed for the assessment, including consumer units, switches, and cables. The assessment is designed to test candidates' skills in electrical installation and safety testing.

Uploaded by

Michael
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Unit of Competency : Install Solar

Time : 4 Hours

PRACTICAL ASSESSMENT
CUTTING LIST
INSTRUCTIONS TO CANDIDATE:
1. You are required to perform the following tasks:
TASK 1: Use mini-trunking wiring system to perform the following tasks for the lay out
diagram in Figure 1.
TASK 2: Complete the wiring of the solar module, the control gear and connect it to the
consumer unit.
TASK 3: Install a lighting circuit such that switches S1 controls Lamp L1 and switch S2
control lamp
TASK 4: Install a water heater switch and the cooker control unit
TASK 5: Carry out polarity and insulation resistance tests

(i) Insulation resistance test


(ii) Polarity test

Page 1 of 2
No Item Quantity per Provided By
candidate

1. 4-way -Complete Consumer unit 1 pc Institution


2. DC/AC Inverter 1 pc
3. Charge Controller 1 pc
4. 12 V Solar Battery 1 pc
5. 10 Watts lamps 2 pc
6. Cooker switch 1 pc
7. Water Heater switch 1 pc
8. 1 gang 2-way switches 2 pcs
9. Deep Pattress (single) 4 pcs
10. Deep Pattress (double) 1 pcs
11. Straight Lamp holder 2 pc
12. Singles core 2.5 mm2 PVC cables(R/B/Y) 2m
13. Singles core 1.5 mm2 PVC cables(R/B/Y) 6m
14. Tack nails 20
15. Single MCB (32A,6A) 1 Each
16. Junction box 3 pcs
17. PVC mini-trunking 1.5m

THIS IS THE LAST PRINTED PAGE.

Page 2 of 2