EDUCATIONAL COURSE:           CARRIER ABSTARCTS:
       BE-Mechanical
                                  A self-motivated professional with overall 10 years’
       Engineering
                                  experience in Piping Engineer of Structural on
       Annamalai University
       2008-2012.                 construction & Maintenance Projects related to Oil & Gas
                                  and Petrochemical Industries
TECHNICAL COURSE:
                                  Outstanding Leadership performed throughout the carrier
                                  and have excellent communication skills to work
ASNT LEVEL II                     efficiently among peers and lead assignments to
       Dye Penetrate              completion within the aimed schedule
       Testing (DPT)              Besides the detail given in my resume, I believe in
       Magnetic Particle          character, values, vision and action
       Testing (MPT)              Presently working with L&T Energy Hydrocarbon
                                  Engg, MFFK, Chennai for their Offshore Platforms &
       Radiographic Testing       Modules fabrication (Client:Linde Position:Piping
       Ultrasonic Testing         Engineer)
       Visual Testing (VT)
                              PROFFESSIONAL EXPERIENCE:
       Radiographic
       Interpretation Film
                                  Company       :L&T Energy Hydrocarbon Engg Ltd.,
       Test (RTFI)
                                  Client        :Linde Engineering-Singapore.,
                                  Project       :New Pitch Gassification SGP Plant
ADDRESS:
                                  Designation   :Piping Engineer,
       128,North Colony,          Third Party   :MMK Kushal Engineers,
       Ko.Adhanur                 Duration      :17-12-2020 To till Working.
       Post,Vriddhachalam
       Tk Pincode-606003          Company       :Quality Fabricator & Erectors Engineers.
       Cuddalore Dist,TN-         Client        :Engineers India Limited,(EIL)
       India.                     Project       :Polymers Addition Project HMEL-Bhatinda,
SKILL:                            Designation   :Piping Engineer
       MS Word & Excell.          Third Party   :Technip FMC,
                                  Duration      :2019 To 2020.
       Well versed in CMS
       Construction
                                  Company :Tarachandra Engineering Pvt Ltd.,
       Management System
                                  Client      :Reliance Industries Limited (RIL)-Jam.,
       e-ALPHS (Electronic        Project     :J3-OSBL Sibur (IIR&HIIR) Plant Jamnagar,
       Activity Level                          ISBL DTA-Coker Revamp Plant Shutdown,
       Planing System)            Designation :Piping Engineer
       Software.                  Duration    :2018 To 2019.
LANGUAGES:                        Company :Excellent Projects I Pvt Ltd-Mumbai.,
                                  Client      :Reliance Industries Limited (RIL)-Jam
       Tamil,Hindi,English        Project     :J3-SEZ Fluidized Catalytic Cracker Unit.,
                                               ISBL DTA-Crude Distillation Units-Shutd
                                  Designation :Piping Engineer
PASSPORT DETAILS:                 Duration    :2017 To 2018.
Passport no :N3151174             Company :Penta Contractors Pvt Ltd-Jamnagar.,
Date of Issue :16/09/2015         Client  :Reliance Industries Limited,(RIL)-Jam.,
Date of Expiry :15/09/2025
Place of Issue :Chennai
Date of Birth :10/06/1991
                       Project     :J3 OSBL-LLDPE & CPF,C2-Complex-Jam
                                    J3-DTA Piping Fabrication Shop-(PFS-4)
                       Designation :Piping Engineer,
                       Duration    :2014 To 2017.
                       Company       :Tarachandra Engineering Pvt Ltd
                       Client        :Reliance Industries Limited (RIL)
                       Project       :J3-DTA Piping Fabrication Shop (PFS-2).
                       Designation   :Piping Engineer,
                       Duration      :2013 To 2014.
                       Company       :Aarvi Encon Private Ltd-Mumbai.,
                       Client        :Reliance Industries Limited (RIL)
                       Project       :J3-ISBL DTA-Aromatics Plant Shutdown,
                       Designation   :Piping Engineer
                       Duration      :2012 To 2013.
   KNOWLEDGE ABOUT STANDARDS & CODES:
 Good reference knowledge in, ASME Sec II part A & C, ASME Sec V, ASME Sec
  VIII Div1, ASME Sec IX, ASME B31.3, AWS D1.1, IS Codes etc.
 SCOPE OF WORKS:
 Fabrication & Erection Mechanical Testing of Piping the mechanical
  Construction firm in the field site fabrication and
  (CS/LAS/SS/DSS/HASTAOLLY) tanks Piping equipment and cross
  country-Pipeline mechanical engineering construction activity associated with
  Major Project of hydrocarbon plant power generation water management
  chemicals and other Engineering.
 JOB HANDLED PIPING:
   Layout Study & Finalization.
   Finalization of Pipe Routing (Big Bore+Small Bore)
   Checking & Issue of Isometrics (P&ID Check, Line Routing,
    Support Check, Special requirement check etc.)
   Preparation & Checking of Civil Loading Data (Structure & Pipe
    Rack),Foundation Load Data
   Preparation & Checking of Nozzle Orientation
   Preparation of TQs/Comments on the Vendor Documents
    (Equipment Drawing, Spring Support Drawing, Special Valve
    Drawing etc.)
   Preparation of Comments on Civil Structural Drawing, P&IDs,
    Equipment Engineering Drawings etc.
   Selection of Pipe Supports, Special Support & Spring Hangers.
   Preparation of P&ID MTO & Requisitions
   Continuous use of Material Specifications for finalizing Line
    Routing & Layout
   Hands on Experience of PDS Software for 3D Modelling
     Interface/co-ordination with Stress Group for Critical
      Lines/Crictical Stress Systems, other Functional Disciplines
   DUTIES AND JOB RESPONSIBILITIES :
 Inspecting the incoming materials of all piping components including valves
  asper project specifications and approved Method of statements.
 For damages dimensions and corrosions, Ensure that MTC is available and
  according to the requirements. Ensure satisfactory identification of materials,
  proper protection of pipe, fittings and components. Verify proper size and
  schedule of pipe, rating of flanges and o lets, and fittings.
 Inspection of prefabrication of piping spools of materials including Carbon Steel,
  Stainless steel and other alloy steel per approved Isometric drawings and details
  at fabrication shop.
 Witnessing Reinforcement pad test and checking Orientation and flush
  grindingof Orifice Flange.
 Inspect painting works of prefabricated piping spools. Make sure the pipe spools
  are properly covered with end caps and safely transported to the site without
  damage.
 Inspect piping just before erection to verify that interior is clear of foreign
  materials. Check edge preparation and fit ups to verify that areas to be weld are
  free of contaminants and that fit up is within tolerance.
 Check flow direction arrows on valves; verify that the properly identified valves
  are Installed in accordance with the flow diagram P&ID. Ensure that pipe
  supports have been installed properly in accordance with the piping drawing and
  Support details.
 Preparation and review of test package contents to ensure that required NDT,
  PWHT, Hardness Test, PMI, Reinforcement Pad Test and Flush Grinding of
  Orifice Flange welding has been performed prior to final system Pressure
  Testing.
 Line checking against drawing and P&ID requirements to ensure completeness
  and Accuracy of the piping system as per the code and project standards. And to
  incorporate the punch list with category "A & B" items.
 Verify initiation of field piping and equipment pressure test punch list. Ensure
  completion of cat "A" punch list items prior to Pressure test. Verify preparation
  of Testing package including piping test record.
 Check and assure that all joint are exposed for examination during pressure test.
  Ensure that isolation or disconnection of equipment not to be used. Check vents
  are open when filling and draining lines.
 Witness final pressure tests, including verification that pressure gages have
  adequate dial range and are calibrated, Water requirement for testing
  includingph value and chlorine content for Stainless Steel piping. Verify that the
  required test pressure was maintained for the specified length of time with no
  leakage.
 Confirm repairs, retesting and re-instatement in accordance with specifications.
  Ensure Blinds are removed and correct gaskets are installed. Verify that control
  valve, Internal of Check Valves, Flow Orifice, instruments and other piping
     components which removed for the test are reinstated.
    Execution of installation and erection of fabricated spools and clearing of Test
     packages for Testing at site. Preparation of pending points, Check list, Punch
     listing and clearance of the same.
    Witnessing hydro and pneumatic tastings, flushing, chemical cleaning, Air
     blowing, Leak testing, Inert gas purging, oil flushing, and final lining up of
     various systems.
    Ensure that the surface to be insulated shall be clean, dry and free from coarse
     rust and scale, monitoring the insulation works and ensure that the insulation
     materials per specification and thickness per Isometric drawings free of moisture
     and protected from rain.
    Monitoring cladding works and ensures sheet materials and thickness per
     specification. Ensure that the cladding is rigid and fixed in such a manner that it
     cannot be slide off and damage.
    Participate meeting with client and subcontractor to resolve construction quality
     issues Giving spot suggestion on small problems at site and identifying
     engineering issues, communicating with construction and engineering
     department forresolving the same at earlier stage.
    Monitoring QA/QC inspection and documentation of contractor and
     subcontractor and ensure that all inspection activities are incorporated with ITP
     and that can be traced according to the project requirement.
    Conduct and coordinating walk through for each completed piping system and
     Verification of closed punch items prior to mechanical completion acceptance.
    Witnessing System and Sub system functional test.
     STRUCTURAL:
     Receiving inspection of Raw materials & Prefabricated
      materials as per Drawing
     Inspection of Pad elevation & Anchor Bolt projection on
      Support Foundation Pedestal as per the approved drawings
      and standards
     Inspection of the dimension of the connections and the welded
      plates before Erection to avoid the time delay for the rework.
     Perform Surveillance during fabrication and erection to
      compliance with Procedures.
     Inspection of the plumbness, verticality and after the installation
      of Structures on foundation.
     Witnessing of Bolt tightening at different stages. (SNUG & Final Torque).
     Inspection of Grouting as per the client’s specifications and standards.
     Walk through, Punch List & Final Inspection.
     Final Inspection of Handrails, Ladders, Staircase, Platforms,
      Local Supports, and Gratings.