S.T.H. Lifts Installation 142000

The document outlines the installation requirements for lifts, including earthing, protection equipment, and maintenance responsibilities for the contractor for one year post-completion. It specifies quality assurance measures, including approved manufacturers and required documentation for bids, as well as adherence to relevant standards and regulations. Additionally, it describes operational features such as fireman's emergency operation for elevators.

Uploaded by

waleedhegazy24
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views1 page

S.T.H. Lifts Installation 142000

The document outlines the installation requirements for lifts, including earthing, protection equipment, and maintenance responsibilities for the contractor for one year post-completion. It specifies quality assurance measures, including approved manufacturers and required documentation for bids, as well as adherence to relevant standards and regulations. Additionally, it describes operational features such as fireman's emergency operation for elevators.

Uploaded by

waleedhegazy24
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

S.T.H.

LIFTS INSTALLATION 142000-10

Include Earthing of all the equipment shall be carried out as specified in electrical specification and as per
IEE regulations.

Include Distribution equipment shall contain all protection equipment for motors and circuits.

Include These shall include overload protection, short – circuit protection, single phasing protection etc as
appropriate.

1.2.19 Maintenance and Guarantee

The contractor shall be responsible for the maintenance of the lifts at his own expense for duration of one year
starting from the date of issue of the completion certificate. Maintenance shall include replacement of parts or
Include For 3 Years
whole equipment that show manufacturing installation defects during operation or due to normal wear and tear.

The Contractor shall guarantee every piece of equipment from any manufacturing or installation defects for a
Include
period of one year starting from the date of issue of the completion certificate.

1.3 Quality Assurance

1.3.1 Approved Manufacturers for passenger elevators


1. KONE
2. Otis
3. Mitsubishi

1.3.2 Bidders must provide the following on company letterhead with their tender:

1. Description of the proposed equipment for all different lift types specified, clearly indicating which model
Include
is included in the bid.

2. Description, make and model of control system for each lift group, identifying which options have been
Include
included in the bid and which options have not been included.

VVVF 3. Description, make and model of drive system.

Japan 4. Location of manufacture.

1.3.3 Work shall be performed in strict accordance with requirements of the latest edition (including supplements
or updates) of British Standard BS EN 81-1, Part 1 Electric Lifts

1.3.4 In addition to the above, Work shall be performed in accordance with applicable local, national and
international, building standards, codes, regulations, ordinances and by-laws.

1.3.5 Obtain and pay for required design submission registration, inspection and permit, except operation and
ownership permits, and make such tests as called for by regulations of such authorities. Tests shall be made
in presence of authorized representatives of such authorities, the Consultant and the Client's authorized
representative(s).

1.3.6 All lift work shall be performed by properly trained and skilled mechanics in the direct employ of the unit’s
manufacturer or authorized Installation Company.

1.4 OPERATIONAL AND SPECIAL FEATURES FOR ALL ELEVATORS

1.4.1 Fireman's Emergency Operation:

When the fireman's switch is activated during the fire, all calls are cancelled and the designated car returns
Include
immediately to a specified floor to facilitate rescue afterwards, the car responds only