Wall On WF Wall On FTB: As Shown

The document outlines specifications for concrete construction, including thickness, reinforcement details, and concrete cover requirements for various structural elements such as slabs, beams, and columns. It specifies the use of ASTM A615 Grade 33 and Grade 40 reinforcing bars, along with guidelines for splicing and curing methods. Additionally, it includes details on formwork stripping times for different components of the structure.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views1 page

Wall On WF Wall On FTB: As Shown

The document outlines specifications for concrete construction, including thickness, reinforcement details, and concrete cover requirements for various structural elements such as slabs, beams, and columns. It specifies the use of ASTM A615 Grade 33 and Grade 40 reinforcing bars, along with guidelines for splicing and curing methods. Additionally, it includes details on formwork stripping times for different components of the structure.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

150mm thk CHB w/ 10mm∅ Vertical

bars sp. @ 800mm O.C. 10mm∅


100mm thk CHB w/ 10mm∅ Vertical
Horizontal bars every 3 layers SLAB ON GRADE 3000 Psi ( 20.70 Mpa) 20mm 100mm
bars sp. @ 800mm O.C. 10mm∅ 2. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS
SUSPENDED SLAB ------------------------------------------------------------ 20mm
700

Horizontal bars every 3 layers SLAB ON GRADE -------------------------------------------------------------- 40mm


BEAMS STIRRUPS-------------------------------------------------------------- 40mm
FFL COLUMN TIES----------------------------------------------------------------- 40mm
POURED DIRECTLY AGAINST EARTH ----------------------------------------75mm
CONC. SLAB FFL FFL 3. ALL REINFORCING BARS SHALL CONFORM TO ASTM A615 GRADE 33 FOR DIAMETER 12mm & SMALLER BARS AND
GRADE 40 FOR DIAMETER 16mm AND LARGER BARS

CONC. SLAB CONC. SLAB 4. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN ACCORDANCE WITH TABLE 1

2100
(TABLE OF LAP SPLICE & ANCHORAGE LENGTH) UNLESS OTHERWISE SHOWN ON DRAWINGS, SPLICES SHALL
NGL BE STAGGERED WHENEVER POSSIBLE.

500
5. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN DAYS IMMEDIATELY AFTER PORING BY THE USE
OF WET BURLAP, FOG SPRAYING, CURING COMPOUNDS OR OTHER APPROVED METHODS.
6. STRIPPING OF FORMS AND SHORES.

500
D-1 D-2 FOUNDATION-----------------------------------------------------24 HRS
COLUMNS/ WALLS ----------------------------------------------3 DAYS
ROLL-UP DOOR ON 2700 X 2100 PVC FLUSH DOOR ON 50 X 100
SUSPENDED SLABS -------------------------------------------14 DAYS
STEEL DOOR JAMB
LEVER TYPE S.S. KEYED LOCK SET
DOOR JAMB
HINGES: 5 SETS S.S. BUTT HINGES
TOP BARS 2-16mmØ BEAMS/ GIRDERS -----------------------------------------------14 DAYS
REQ'D. 2 SETS LEVER TYPE S.S. KEYED LOCK SET
REQ'D. 3 SETS
MID BARS 2-16mmØ 10mm STIRRUPS sp. @ 1-50mm,

350
5-75mm, 7-100mm REST @ 200mm 12mm∅ Main bars spaced @ 300 mm O.C.

200
BOT BARS 2-16mmØ up to Center w/ 3-10mm∅ Longitudinal bars

75mm thk Gravel bed (G1)


1 DOOR'S & WINDOW'S SCHEDULE
200

500

S-1 SCALE NTS


WALL ON FTB WALL ON WF

2 WALL FOOTING & FTB DETAILS


S-1 SCALE NTS

SHORTER SPAN

S/4 S/2 S/4

COL.STRIP MIDDLE STRIP COL.STRIP

TOP BARS @ COL. STRIP


10mm∅ DSB alternate strainght
& Cut bars spaced @ 150mm O.C.

L/4

L/4
BOT BARS @ MIDDLE STRIP
FFL 10mm DSB alternate straight
CONC. SLAB & bent-up bars spaced @
50mm thk Gravel Bedding(G1) 150mm O.C.
500

700

NGL
TOP BARS @ MIDDLE STRIP

LONGER SPAN
L/2

L/2
L
10mm∅ DSB alternate straight
& bent-up bars spaced @
150mm O.C.
FTB

Temp./Shrinkage Bars @
1500

COL. STRIP 10mm DSB


1200

spaced @ 300mm O.C.


300

75

L/4
L/4
400

7-16mm∅ DSB 11-16mmØ


300
1200

BOTHWAYS
75

100mm thk Gravel Bedding


SECTION (Apple Size) TOP BARS @ COL. STRIP
10mm∅ DSB alternate straight
COLUMN FOOTING
& Cut bars spaced @ 150mm O.C.
C1/F1 PLAN

3 COLUMN FOOTING DETAILS


S-1 SCALE NTS

S/4 S/2 S/4

4 TWO WAY SLAB DETAILS [ S-1 ]


S-1 SCALE NTS

CERTIFIED BY: PROJECT TITLE/ LOCATION: APPROVED BY: SHEET CONTENT SHEET NO.

PRC NO.

TIN S-1
______________________________ PTR AS BUILT PLAN OF 8-8 LAUNDRY SHOP ______________________________ AS SHOWN 3 5
CIVIL ENGINEER BRGY. PINYA, LABO, CAMARINES NORTE
DATE OWNER
PLACE