UPVC Checklist

This document is a checklist for the installation of UPVC windows and sliding doors at the On Cloud 33 project by Urbanrise Lifestyles Pvt Ltd. It outlines specific tasks to be completed before, during, and after the installation process, including checks for dimensions, defects, and proper sealing. The checklist ensures quality assurance and quality control throughout the installation process.

Uploaded by

drnfiles
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
271 views1 page

UPVC Checklist

This document is a checklist for the installation of UPVC windows and sliding doors at the On Cloud 33 project by Urbanrise Lifestyles Pvt Ltd. It outlines specific tasks to be completed before, during, and after the installation process, including checks for dimensions, defects, and proper sealing. The checklist ensures quality assurance and quality control throughout the installation process.

Uploaded by

drnfiles
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Check List for UPVC Window / Sliding Door Fixing

Drawing Ref. No : Doc. No : UR / BA / UPVC

Project: On Cloud 33, Bachupally. Tower&Floor:

Contractor Name: Urbanrise Lifestyles Pvt Ltd. Unit No :

Vendor Name: Date :

Verified By
Sl.
Description Remarks
No
Execution QA/QC
Prior Fixing
1 Check for cleaning of surface has done properly prior to frame fixing.
2 Check for member dimensions, thickness of sections as per approved specification.
3 Check member for any defects like twists, cracks, surface flaws, imperfect edges, etc.
Check for approvals of all components of UPVC windows / sliding doors including hard ware &
4
sealants.
5 Check for tiling work has been completed prior to fixing of sliding door frame.
6 Check for glass thickness, colour, toughened, scratches.
During Fixing
8 Check for fixing of the window / Sliding door in the wall as per drawing.
Check for a gap of 5 to 7mm for windows / 5 mm for doors all around the frame for sealant
9
provision.
10 Check for right angle, levels, diagonals, straightness of sides of window / SD frame.
11 Check for all anchor fastners are fixed to the frame.
12 Check for cleaning of surface has done properly prior to sealant application.
Check for gap filling between frame and wall properly done :
13
A) Internal : Acrylic sealant-352 & B) External : Silicone sealant-394
Post Fixing
14 Check for plumb, right angle, levels, diagonals are found satisfactory.
15 Check for gap filling between frame and wall properly.

16 Check for touch locks in good working condition, noise free movement of shutters and rigidity.

17 Check for defects in glass,Integrated grill and mosquito mesh


18 Check for cleaning of debris like tapes, sealants, spacer pieces, etc.

Comments:

Prepared & Checked By (Engineer) Checked By (QA/QC)


Name : Name :
Signature : Signature :
Date & Time : Date & Time :