Job:      Bridge Sungai Muda                                                                    Job No.
: 148
Beam:     TMbeam- 26m                                                                           Calc. By: Aqila
                                                                                                Checked:
Data File: \\zar-storage\Eng\2. PROJECTS\31. Paya Keladi\TMBeam26mRev.sam 6/5/2025 2:25:09 PM
Design code: BS 5400-4:1990
Analysis:    Stresses at Transfer
             Serviceability Limit State
             Section Ref 1 at 13m from left end of beam
   Section details:
             Ref 1   "Section 1"
             at 0.5 x span = 13 m from left end of beam
   Analysis:
             Stresses at Transfer
             Serviceability Limit State
   —————————————————————————————————————
   ACTUAL STRESSES IN PRECAST BEAM
   —————————————————————————————————————
       No. of tendons fully bonded at this section:                   33
       No. of tendons fully debonded at this section:                  0
       No. of tendons deflected at this section:                       0
   INITIAL PRESTRESS
   ——————————————————————————————————————————————————————————————
        height No of       fpu  area   % of fpu  initial force
          mm    tendons N/mm²    mm²              kN
   ——————————————————————————————————————————————————————————————
            60.0 17      1860.0  150.0   75.0      3557.25
          110.0 14       1860.0  150.0   75.0        2929.5
         1040.0 2        1860.0  150.0   75.0         418.5
                ———————                          —————————
       TOTAL      33                               6905.25
   INITIAL RELAXATION
   ———————————————————————————————————————————————————————————————————
                           relaxation            After relaxation
        height No of total trans.     loss       force     moment
          mm    tendons  %       %   kN          kN       kN.m
   ———————————————————————————————————————————————————————————————————
            60.0 17     2.5 50.0 44.465625     3512.7844 210.76706
          110.0 14      2.5 50.0    36.61875   2892.8812 318.21694
         1040.0 2       2.5 50.0     5.23125   413.26875   429.7995
                ———————                        ————————— —————————
       TOTAL      33                           6818.9344   958.7835
      Moment about the centroid of the precast beam:
                 Mr = 958.7835-(6818.9344*0.55819)
                    = -2847.51 kN.m
      Corresponding stresses:
            top stress = 6818.9344/480.412+-2847.51/1.5685E8
SAM v6.60e
Copyright © 2025 Bestech Systems Ltd                      6/5/2025 15:29                                          1
Job:      Bridge Sungai Muda                                                                    Job No.: 148
Beam:     TMbeam- 26m                                                                           Calc. By: Aqila
                                                                                                Checked:
Data File: \\zar-storage\Eng\2. PROJECTS\31. Paya Keladi\TMBeam26mRev.sam 6/5/2025 2:25:09 PM
Design code: BS 5400-4:1990
Analysis:    Stresses at Transfer
             Serviceability Limit State
             Section Ref 1 at 13m from left end of beam
                       =       14.193915+-18.15409
                       =       -3.9602 N/mm²
         bottom stress =       6818.9344/480.412+-2847.51/-1.579E8
                       =       14.193915+18.037421
                       =       32.2313 N/mm²
      Self weight moment:
        c.s.a.      = 4.804E5 mm²
        density     = 25.0 kN/m³
        self weight = 4.804E5*25.0
                    = 12.0103 kN/m
        beam length = 26.0 m
        distance    = 13.0 m
        Msw         = 0.5*12.0103*13.0*(26.0-13.0)
                    = 1014.87 kN.m
      Corresponding stresses:
        top stress     = 1014.87/1.5685E8
                       = 6.47024 N/mm²
        bottom stress = 1014.87/-1.579E8
                       = -6.4287 N/mm²
   ELASTIC DEFORMATION LOSSES
               stress at top of precast beam = 2.51006 N/mm²
            stress at bottom of precast beam = 25.8027 N/mm²
                        depth of precast beam = 1120.0 mm
   ——————————————————————————————————————————————————————————————
       height No of       conc     conc      tendon    tendon
               tendons stress     strain     force     moment
         mm               N/mm²               kN        kN.m
   ——————————————————————————————————————————————————————————————
          60.0 17      24.55486 6.821E-4     347.86053 20.871632
         110.0 14      23.51501 6.532E-4     274.34181 30.177599
        1040.0 2       4.173821 1.159E-4     6.9563688 7.2346235
               ———————                       ————————— —————————
      TOTAL      33                          629.15871 58.283854
      Moment about the centroid of the precast beam:
                Med = 58.283854-(629.15871*0.55819)
                    = -292.9092 kN.m
      hence top stress =       2.51006-629.15871/480.412--292.9092/1.5685E8
                       =       2.51006-1.3096219--1.867421
                       =       3.06786 N/mm²
         bottom stress =       25.8027-629.15871/480.412--292.9092/-1.579E8
                       =       25.8027-1.3096219-1.8554202
                       =       22.6376 N/mm²
      After a further 2 iterations of the above process, the top and bottom
      stresses are as follows:
            top stress = 3.00296 N/mm²
         bottom stress = 22.973 N/mm²
   ——————————————————————————————————————————
   PERMISSIBLE STRESSES IN PRECAST BEAM
SAM v6.60e
Copyright © 2025 Bestech Systems Ltd                      6/5/2025 15:29                                          2
Job:       Bridge Sungai Muda                                                                   Job No.: 148
Beam:      TMbeam- 26m                                                                          Calc. By: Aqila
                                                                                                Checked:
Data File: \\zar-storage\Eng\2. PROJECTS\31. Paya Keladi\TMBeam26mRev.sam 6/5/2025 2:25:09 PM
Design code: BS 5400-4:1990
Analysis:    Stresses at Transfer
             Serviceability Limit State
             Section Ref 1 at 13m from left end of beam
   ——————————————————————————————————————————
    Compression
       Clause 6.3.2.2 Table 23
           0.5*fci = 0.5 * 60.0
                   = 30.0 N/mm²
           0.4*fcu = 0.4 * 60.0
                   = 24.0 N/mm²
       hence permissible compression stress = 24.0 N/mm²
    Tension
       Clause 6.3.2.4 (b)(1)
                  Permissible tension stress = -1.0 N/mm²
   ——————————————————————————————————————————————————————————————————————
   SLS STRESS SUMMARY TABLE
   ——————————————————————————————————————————————————————————————————————
                  ———————————————————————————————————————————————————————
                                         Concrete Stresses (N/mm²)
                    force    moment       In situ           Precast
                    kN       kN.m       top    bottom     top    bottom
                  ———————————————————————————————————————————————————————
        Prestress[1]    6818.93-2847.5                    -3.9602 32.2313
        Self Weight            1014.87                    6.47024 -6.4287
                    ——————————————————————————————————————————————————————
        Prestress + Self Weight                           2.51006 25.8027
        Elastic Def      -563.89 261.418                     0.49289 -2.8297
                       ——————————————————————————————————————————————————————
        TRANSFER         6255.05 -1571.2                     3.00296   22.973
   ————————————————————————————
   END ZONE REINFORCEMENT
   ————————————————————————————
     For the design of end zone reinforcement, see the transfer analysis results
     for the section at a transmission length from the end of the beam, or at a
     debond location.
   ——————————————————————————————————————————————————————————————————————
   SLS FLEXURE
   BS 5400:4:1990 Appendix A.2 calculated for uncracked sections
   ——————————————————————————————————————————————————————————————————————
   The deflections are calculated from integration of the curvatures along the
   beam, using the parameters detailed below:
      Elastic Modulus at Transfer,                                         ET =   36.0 kN/mm²
    Precast section height = 1120.0 mm
                                   —————————————————————————————————————————————
                                   Precast             Curvature    Deflection
                                   Stress E Strain     (x10-6 )        (mm)
SAM v6.60e
Copyright © 2025 Bestech Systems Ltd                      6/5/2025 15:29                                          3
Job:      Bridge Sungai Muda                                                                    Job No.: 148
Beam:     TMbeam- 26m                                                                           Calc. By: Aqila
                                                                                                Checked:
Data File: \\zar-storage\Eng\2. PROJECTS\31. Paya Keladi\TMBeam26mRev.sam 6/5/2025 2:25:09 PM
Design code: BS 5400-4:1990
Analysis:    Stresses at Transfer
             Serviceability Limit State
             Section Ref 1 at 13m from left end of beam
                                    (N/mm²)    (x10-6 ) (rad/m)    Here    Max.
                                    —————————————————————————————————————————————
                At Transfer     T   3.00296 ET 83.4156     -495.29    37.0476   37.0476
                                B   22.973     638.139
   ________
   [1] includes initial relaxation
   End
SAM v6.60e
Copyright © 2025 Bestech Systems Ltd                      6/5/2025 15:29                                          4