Wir 1

This Work Inspection Request (WIR) is for the completion of a two-layer waterproof membrane and protection layer at Villa 86 of the Proposed Six Villas project at Reef Island, submitted by the contractor Cyprus Cybarco Tabet JV W.L.L. The inspection is scheduled for November 5, 2024, and must be approved by the contractor's quality control before submission to the consultant, Arab Architects W.L.L. The document also outlines the requirements for inspection, including prior notification and attached approved drawings.

Uploaded by

Sathish Insmile
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views2 pages

Wir 1

This Work Inspection Request (WIR) is for the completion of a two-layer waterproof membrane and protection layer at Villa 86 of the Proposed Six Villas project at Reef Island, submitted by the contractor Cyprus Cybarco Tabet JV W.L.L. The inspection is scheduled for November 5, 2024, and must be approved by the contractor's quality control before submission to the consultant, Arab Architects W.L.L. The document also outlines the requirements for inspection, including prior notification and attached approved drawings.

Uploaded by

Sathish Insmile
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

WORK INSPECTION REQUEST Form No.

: F15

PROJECT: Proposed Six Villas at Reef Island WIR ST No. : 3610


CLIENT: Lulu Tourism Company W.L.L. Date: 04-11-24
CONSULTANT: M/s. Arab Architects W.L.L.
Form No. F15
CONTRACTOR: M/s. Cyprus Cybarco Tabet JV W.L.L.
Brief Description of work
INSPECTION FOR COMPLETION OF 2 LAYER OF WATER PROOF MEMBRANE AND
Work Details
PROTECTION LAYER WORKS AS HIGHLIGHTED AREA
Location of work VILLA 86
Attachment Ref. IFC DRAWING
Date of Inspection : 05-11-24 Start time: 08:30 AM End time : 08:50 AM
RELATED TRADE STRUCTURAL ARCHITECTURAL MEP OTHERS
MEP SERVICES CLEARENCE
PLUMBING Sign
ELECTRICAL Sign
HVAC Sign
SWIMMING POOL Sign
LIFT Sign
OTHERS Sign
CONTRACTOR:
QUALITY CONTROL'S APPROVAL
PROJECT ENGINEER'S
NAME & SIGNATURE Approved

Received by AA Name : Sign : Date: Time:


CONSULTANT'S RECEIPT:
CONSULTANT'S COMMENTS

On Behalf Arab Architects Approved Approved as Noted Rejected


Signature : Signature :
Name : Mr.Mohamed Y.Elekhtyar Name : Trade:
Position : Project Manager Position :
Notes :
* This form should be send to the consultant's minimum 24 hours prior to the time of inspection .(Before 2:00 O'clock P.M)
* Copy of related final approved (Drawings /Shop drawings) to be attached highlighting inspected area
* Attached drawings just to indicate inspected items not to be reviewed/approved by Consultant
* Inspection does not relieve the contractor from compliance with the requirements of the drawings and specifications.
The office will be closed on all public holidays, Fridays and Saturdays. The representative at site shall keep one copy for the office file
Received by Contractor :
Date / Time:
Note: Work Inspection Request should not be submitted to Arab Architects without Contractor's Quality Control approval

FORM - 15 - WORK INSPECTION REQUEST


CONCEPT DESIGN CONSULTANT

Extend S.A.R.L.
Beirut, LEBANON
ASHRAFIEH-St. LOUIS STREET-
A201 2 Tel: 00961 1 200302 Cell: 00961 3 673111
Fax: 00961 1 200320 E-mail: extend@extendlb.com
A300
4 CONSULTANT

A B B' C D E F G G' H H' I J J' K L M N


ARAB ARCHITECTS W.L.L.
P.O. Box : 75799, Manama, Kingdom of Bahrain
Tel : +973 17243992 | Fax : +973 17243993
E-mail : info@arabarchs.com | Website : http://www.arabarchs.com
License No. EPP. BN/122 | Category A

39000 This drawing is entirely the property of Arab Architects and as such must not be
reproduced or copied without permission.

MAIN CONTRACTOR
3000 3000 3850 2150 3000 3000 750 2250 1700 1300 3000 1500 1500 3000 3000 3000

North
REV R9 PROVIDE PLANTER, REV R9 LINTEL BEAM REDUCED REV R8 KITCHEN LAYOUT REV R10 GF - STORAGE TO
1000MM HIGH FROM FFL THEN TO 2600MM HEIGHT REMOVED REVISED AS PER COMMENTS PROVIDE BLOCKWORKS
OPENING TO CEILING TRANSOM WINDOW FROM LTC ON MAR 7 2024 AND BELOW UNDER STAIRCASE PROJECT

CONVERTED TO SD-17 MAR 12 2024


PROPOSED LUXURY VILLA AT
(PROVIDED CHANGE AS WELL
TO THIS DOOR TO BE REEF ISLAND - LOT 03220531-
NEIGHBOR V86
PROPERTY LIN
E SYMMETRICAL)

+2.200 TOW DETAIL REFER TO


SHEET NUMBER CLIENT
A1501
LULU TOURISM COMPANY
-0.394 FFL
-0.275 FFL
-0.156 FFL KEYPLAN

-0.038 FFL AD-5 LPG

1030
SD-10
E DESIGN 02
W-2B North
1

190
LINE OF MASS ABOVE

-150
STORAGE 1545 SD-10 DESIGN 02

1760
+0.150 FFL 2.60 x 1010 W-1A G
+0.150 FFL
1800

GF21 W-1A
DESIGN 02
TERRACE +0.150 FFL SD-15

-50
DW-3 W-10

-50
SD-17

E
770 4140 770

2 DRIVER BED
K Y
E A
L
P N
1 :5
2 M
0

PROPERTY LIN
KEYPLAN 1:2500M
2.68 3.38
WC2
LIVING

-50
FRIDGE ABV
BATH

600
+1000MM FROM TERRACE FFL W-15 FREEZER
WC2 GF16
WET KITCHEN 2.72 x 2.97 GENERAL NOTES

1135
BELOW
2.40 x 3.16

1435
SINK
WD-1

300
OPENING FOR

5.67 x 2.07
LINE OF MASS ABOVE

SHELVES

GF17 GF18
3000

3300 1180
-0.475 FFL GF7 600
WD-12

600
300
600 300 600 1200 600 FRIDGE
GLASS WALL

STORAGE
BURNER DISH CUP WD-3 GD-3 1. TYPE A VILLA - DETAILS APPLICABLE

600

600

535
WASHER BOARDS
LIFT -10 -20 +0.125 FFL TO VILLA 86

150

150
STAFF TOI.
605 950 675
2.67 x 2.07 2. TOP OF PLANTER WALLS TO BE 700MM

600
3

895
580 1000 650
SINK

WD-1 -10 GF8 HIGH FROM FFL OF TERRACE


DW-1 600 300 1050 300 600
ELEC UP 3. LEVEL OF ROOF DECK AND UPPER

350
600
HOB
AD-1 AD-1 ROOF DECK SHOWS STRUCTURAL SLAB

400
2785
DRAWERS

1 W-9 +0.200 FFL 1 LEVEL

1600
DRY 1650
KITCHEN600
3000

TOILET

600
FRIDGE

2160
-50 600 WC3 MAIN HALL
A300 DRAWERS 5.637x 3.30
+0.200 FFL COFFEE
2.77 x 3.32
5.60 x 5.80
A300

235
3150
EXISTING

600
GF6 MICRO GF9
600 300 300 600 600 600 150 600 1280 WAVE
GF2
BEACH PROMENADE

LEGEND OF DOOR TAGS


TERRACE
DISH
FRIDGE FREEZER
WD-1
BLDG

600

600
WASHER

-10
370
GARAGE
4 WOODEN DOOR

340
GF5 1600 1250
+0.200 FFL 8.70 x 5.70 WD-X

MAIN RECEPTION W-8 WD-9 WD-3 GF22


STEEL DOOR
SD-X
11.61 x 11.60 GALERIA G
GF4
3000

9.100 x 2.57
+0.200 FFL GF3 WD-8 GD-X GLASS DOOR WITH ALUMINUM FRAMING
GLASS DOOR WITH WINDOW PANELS ON ALUMINUM
EXISTINGEXISTING DW-X
20700

E FRAMING
+0.125 FFL ROLL UP DOORS ROLL UP DOORS
DW-1 DS-X STEEL DOOR WITH WROUGHT IRON SCREEN
5

-200
DW-5 DW-6 DW-5 AD-4 AD-4 LEGEND OF BLOCKWORKS
-200
3000

300MM THERMALLY INSULATED SANDWICH


-50
MAIN ENTRANCE GD-7 OVER HEAD LOUVERS BLOCKWORK
WATER LEVEL 50MM BELOW GRASS WITH 250MM DEPTH -200 4.10 x 4.00 -50
SD-6 DW-4 GF1 300MM NORMAL BLOCKWORK
6 W-16
LOW CABINET GD-1 +0.200 FFL
OPEN PUBLIC 250MM NORMAL BLOCKWORK
+0.150 FFL
EXISTING COURT YARD

ROAD
RAILING AND 10.30 x 8.98 200MM NORMAL BLOCKWORK
LONG CABINET

W-7

-150
RETAINING WALL GF26
SWIMMING POOL DETAIL 150MM NORMAL BLOCKWORK
7 REFER TO SHEET NUMBER
SD-14 SD-14
3700

A1501
+0.150 FFL SD-9 -50 +0.200 FFL -50 100MM NORMAL BLOCKWORK
SD-17 -50
DESIGN 02 DESIGN 02

-50
OFFICE
5.55 x 3.55 LEGEND OF FLOOR FINISHES
CH SHO. DESIGN 02 SD-16 DESIGN 01
-50

GF10 W-13
DESIGN 02 NATURAL GRASS
PROPERTY LINE

8 GD-3 GD-3
SWIVEL ARM
CHAIR
W-3
-50 POOL SHOWERS STAFF ROOMWD-1
SURFACE OF WATER
GD-9
2300

2.66 x 3.87
SOFA 2.76 x 3.00
GF15
+0.150 FFL DESIGN 02 SD-5 GF23 -10
DESIGN 02 -10
+0.190 FFL
-10

+0.150 FFL WC4 PUMP RM WD-1 BATH


9 -0.430 FFL 2.24 x 3.87 LOWER CAB
3.13 x 1.58

-20
-50
GD-8 GF14 GF11 WC1 AD-8 STAFF TOI.
900

BID1 1.69 x 3.00 WC2


SHELVES
GF24

10 PROPERTY LINE GD-3B

FOR CANOPY DETAIL FOR CANOPY DETAIL REFER TO


REFER TO SHEET NUMBER SHEET NUMBER
A1301 A1301
NEIGHBOR

REV R9 LINTEL BEAM REDUCED


TO 2600MM HEIGHT REMOVED R10 MAY 10 GF-ADDED LPG
TRANSOM WINDOW 2024 ENCLOSURE FOR 1F BBQ
CONVERTED TO SD-17 AREA ON MAY 9 2024,
PROVIDED BLOCKWORK
(PROVIDED CHANGE AS WELL REV R10 GAS CABINET FOR 1F UNDERSTAIRCASE ON MAY
TO THIS DOOR TO BE BBQ REVISED AS PER LTC 12 2024
SYMMETRICAL) REQUIREMENT ON MAY 9 2024 R9 MAY 2 GF - LTC REQ ON SITE
2024 WALKTHROUGH TO
PROVIDE PLANTER AT
TERRACE, SD13 LOWERED
LINTEL BEAM CONVERT TO
LEGEND OF SANITARYWARE SD 17
2 REVISION NOTES FOR REV 8 REVISION NOTES FOR REV 6 REVISIONS MADE FROM ISSUED FOR TENDER TO ISSUED Rev Date Description
WATER CLOSETS
1. REVISED KITCHEN LAYOUT REVISED AS PER FOR CONSTRUCTION
WC1 ONE-PIECE TOILET DURAVIT RIMLESS® FOR SENSOWASH® F | L: 745MM W: 378MM H: 720MM
A300
LTC COMMENTS ON MAR 07 2024, BLOCKWORK 1. ALL DOOR TAGS AND WINDOW PROJECT NO. 121AA2021 DRAWN
EJP,
JP
WC2 DURAVIT TOILET CLOSE-COUPLED FLOOR MOUNTED EXPOSED TANK | L: 650MM W: 355MM H: 385 MM ALONG WD12 REDUCED FROM 200MM TO 150MM TAGS ARE UPDATED 1. TECHROOM AND STORAGE ROOM SLIDING DOOR DATE JULY 2023 CHECKED MA
WC3 CIELO WALL MOUNTED SHUI COMFORT L: 550 W: 375 H: 420 WITH GROHE CONCEALED TANK AS PER LTC REQS ON MAR 12 2024 2. ALL WET AREAS ARE UPDATED SHOULD HAVE POCKETING GYPSUM WALL SCALE As indicated / A1 APPROVED MA
TYPE B - APPLICABLE FOR VILLA 86, 88 & 91 2. COLUMN K7 ROTATED 90 DEGREES
WC4 CIELO WALL MOUNTED SHUI COMFORT L: 550 W: 375 H: 420 WITH GEBERIT CONCEALED TANK ACCORDING TO CHANGES FROM 3. MAIN ENTRANCE TO GARAGE WALL SHOULD BE 300MM SHEET TITLE:
BIDETS
GROUND FLOOR PLAN CLIENT FROM NOV 15, 2023 BLOCKWORK. GROUND FLOOR PLAN
BID1 CIELO SHUI COMFORT SCHOBS L: 550 W: 375 H: 320
1 1 : 100
REVISIONS NOTES FROM 09 REVISION 4 NOTE:
SHEET NUMBER REVISION NUMBER
DUE TO CLIENT REQUEST TO RELOCATE ROOF DECK
LEGEND OF SANITARYWARE 1. WOODEN SLIDING DOOR WD12 CHANGED AS TANKS TO GROUND FLOOR, PUMP ROOMS AND EQUIPMENT A101 R10
1 : 50 NEEDS TO BE UPDATED.
PER COMMENTS FROM MARCH 03 2024. PROJECT STATUS:
IFC-V86