0% found this document useful (0 votes)
35 views1 page

Foundation Plan Mezz. Floor Framing Plan Roof Framing Plan: Wall Footing Detail

Uploaded by

krem jamboy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views1 page

Foundation Plan Mezz. Floor Framing Plan Roof Framing Plan: Wall Footing Detail

Uploaded by

krem jamboy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GENERAL NOTES AND SPECIFICATIONS

1. IN THE INTERPRETATION OF THESE DRAWINGS, INDICATED DIMENSIONS 2-16MMØ


STD. BARS
TIE BEAM
SHALL 2-16MMØ
W/10MMØ STIRRUPS
2 @ 50, 12 @
GOVERN AND DISTANCES OR SIZES SHALL NOT BE SCALED FOR STD. BARS
100 REST @
CONSTRUCTION 2-16MMØ 200mm. O.C.
STD. BARS
PURPOSES. MIDSPAN & SUPPORT
2. THE CONTRACTOR SHALL COORDINATE WITH THE AR, ME, SE, EE, AND
OTHER
UTILITIES AND EQUIPMENT PLANS FOR THE EXACT SIZE, NUMBER AND

GROUND FLOOR
LOCATION
OF ALL SLEEVES OR OPENINGS THRU FLOOR SLABS, BEAMS AND WALLS
7100 7100 7100
AND
4400 2700 4400 2700 4400 2700 ALSO BUILDING DIMENSIONS. 6-12MMØ RE-BARS W/ 10MMØ TIES
2 @ 50, 9 @ 100mm
3. ALL REINFORCED CONCRETE WORK SHALL BE DONE IN ACCORDANCE REST @ 175mm. O.C.
800 1900 800 1900 800 1900
WITH THE ACI - 318 - 89 BUILDING CODE, AND ALL STRUCTURAL STEEL RB/B1
SHALL BE DONE IN ACCORDANCE WITH AISC SPECIFICATION (LATEST
EDITION) IN SO FAR AS THEY DO NOT CONFLICT WITH THE LOCAL BUILDING SCHEDULE OF BEAMS
N. T. S.
CODE REQUIREMENTS.
4. ALL SLABS, BEAMS, GIRDERS, AND OTHER STRUCTURAL ELEMENTS
WHICH ARE NOT INDICATED, DETAILED, DESIGNATED OR INADVERTENTLY
4335

4335

4335
4735

4735

4735
OMITTED BUT ARE NECESSARY TO BE COORDINATED WITH
ARCHITECTURAL AND OTHER ALLIED ENGINEERING PLANS AS WELL AS TO
COMPLETE THE STRUCTURAL WORKS IN ACCORDANCE WITH THE INTENT
OF THE PLANS AND SPECIFICATION SHALL BE BROUGHT UP DURING
PRE-BIDS/MEETINGS/ NEGOTIATIONS.
4565

4565

4565
1. UNLESS OTHERWISE INDICATED IN PLANS OR NOTED IN SPECIFICATIONS
4315

4315

4315
THE MINIMUM 28-DAYS CYLINDER COMPRESSIVE STRENGTH OF
CONCRETE f'c, SHALL BE AS FOLLOWS:

CENTER-EDGE
1.1 FOUNDATION 21 MPa. (3000 psi)
1.2 PEDESTALS, COLUMNS, & SHEAR WALLS 21 MPa. (3000 psi) CENTER

1.3 FLOOR SLABS, BEAMS & GIRDERS 21 MPa. (3000 psi)


1.4 PARAPET WALLS AND OTHER STRUCTURAL ELEMENTS 21 MPa. (3000 psi)
2300

2300

2300
20300

20300

20300
CORNER-EDGE
1.5 PARTITIONS, CURTAIN WALLS, BEDDED SLABS, SIDEWALKS 21 MPa. (3000 psi)
CURB, GUTTER, & OTHER STRUCTURAL ELEMENTS.
3600

3600

3600
SIZE BOTTOM BARS
3875

3875

3875
THICKNESS
1.6 LEAN CONCRETE 21 MPa. (3000 psi) MARK (mm) LENGHT (mm) WIDTH (mm) BOTH WAYS
DEPTH OF EXCAVATION

F-1 300 600 600 5 - 10 Ø 600


F-2 200 800 800 8 - 12 Ø 800

FOUNDATIONS TWENTY - FOUR (24) HOURS

EDITION) IN SO FAR AS THEY DO NOT CONFLICT WITH THE LOCAL BUILDING WALLS EIGHTEEN (18) HOURS

GROUND FLOOR
THREE HUNDRED THIRTY - SIX HOURS/
BEAMS
FOURTEEN (14) DAYS
3600

3600

3600
3625

3625

3625
6-16MMØ REBARS W/ 10MMØ TIES
2 @ 50, 9 @ 100mm SCHEDULE 40
REST @ 175mm. O.C.
1000

1000
C1 C2

COLUMN / FOOTING SCHEDULE


N. T. S.

TYPICAL CONCRETE BEAM DETAIL


4200

3900

4200

3900

4200

3900
3750

3750

3750
WATER
TANK

1750 1750 1750


4250 3850 4250 3850 4250 3850

8100 8100 8100 TYPICAL CONCRETE BEAM DETAIL


N.T.S

FOUNDATION PLAN MEZZ. FLOOR FRAMING PLAN ROOF FRAMING PLAN

WF1
TRUSS DETAIL
WF1 N.T.S

WALL FOOTING DETAIL


WALL FOOTING DETAIL
N.T.S N.T.S

JANINE S. CARAMPOT FOUNDATION PLAN


MEZZ. FLOOR FRAMING PLAN -
ROOF FRAMING PLAN
COLUMN SCHEDULE
FOOTING SCHEDULE
ASBUILT COFFEE SHOP TYPICAL FOOTING DETAILS
WITH MEZZANINE SCHEDULE OF BEAMS
TRUSS DETAIL

LOT 7497-B-8, BRGY. LANGKAAN 1, DASMARIÑAS CITY, CAVITE


GENERAL NOTES AND SPECIFICATIONS
S-1

You might also like