Risk Analysis: Sample Executive Summary (For Reference)

The document outlines a project for a 40 MW Natural Gas Power Plant, detailing aspects such as risk analysis, including fuel price volatility and regulatory changes, as well as mitigation strategies. It includes annexures like layout plans, fuel supply agreements, and financial models. The project is developed by ABC Energy Pvt. Ltd. with a total cost of ₹240 Crores and a timeline of 18 months.

Uploaded by

Senthil Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views2 pages

Risk Analysis: Sample Executive Summary (For Reference)

The document outlines a project for a 40 MW Natural Gas Power Plant, detailing aspects such as risk analysis, including fuel price volatility and regulatory changes, as well as mitigation strategies. It includes annexures like layout plans, fuel supply agreements, and financial models. The project is developed by ABC Energy Pvt. Ltd. with a total cost of ₹240 Crores and a timeline of 18 months.

Uploaded by

Senthil Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

 Spare parts & consumables

9. Risk Analysis

 Fuel price volatility

 Regulatory changes

 Technical risks

 Financial risks

 Mitigation strategies

10. Annexures

 Layout plan

 Grid connectivity letter

 Fuel supply agreement

 OEM brochures

 Financial model spreadsheet

 MoUs/Letters of Intent

📄 Sample Executive Summary (for reference):

Project Title: 40 MW Natural Gas Power Plant at XYZ Industrial Zone


Developer: ABC Energy Pvt. Ltd.
Capacity: 40 MW (Open Cycle Gas Turbine)
Fuel: Piped Natural Gas from ABC Gas Ltd.
Project Cost: ₹240 Crores (approx.)
Timeline: 18 months from financial closure
Tariff Expectation: ₹4.25/kWh
Environmental Clearance: To be obtained within 4 months
Land Area: 7 acres (leased from Industrial Development Corporation)
Technology Provider: GE Frame 6B Gas Turbine
Financial Model: 70:30 Debt:Equity ratio
IRR: 15.5%
Payback Period: 6.8 years