Bus A/C
BUS A/C SYSTEM INSTALLATION
INSTRUCTION
NUVO BUS TRANSIT
SYSTEM PVT LTD.
Website: www.nuvobus.com
keywords: Bus A/C System Installation, Installing bus air conditioner, install roof mounted
bus air conditioner, bus air conditioner Installation Instruction
Abstract: How to install bus air conditioning system and how to install roof mounted bus air
conditioner, Guchen industry's technical engineer writing this bus A/C system installation
instruction for customer.
Guidance:
How to install bus air conditioning system and how to install roof mounted bus air
conditioner, there are three tips need to consider, and please follow “installation
process of roof mounted bus air conditioner” you will do it better.
★ First: Safety Practices for Installing Bus Air Conditioner
★ Second: Inspection Before Installing Bus Air Conditioning system
★ Third: Installation Process of Roof Mounted Bus Air Conditioner
Bus A/C System Installation Instruction
I Safety Practices for Installing roof mounted Bus Air
Conditioner
● Please wear a eye-protecting glass when doing the refrigerant relative works, the
refrigerant will cause the perpetual harm of the eye.
● Please don’t operate the bus air conditioner equipment when the high pressure
valve of the compressor is shut-off.
● When the bus A/C system is working, please keep your
hands away from the rotary components, such as the fan, belt,
etc.
● Please keep the hose pipes and wire harness away from
the heat, belt, pulley and sharp goods.
● Please consider the convection of the heat enough, and
don’t put the condenser in a airtight space.
● Please ensure there is no naked flame or electric short.
● Please ensure all the installed stand parts (such as clutch,
blower, fan)are tight and suitable.
● Please take care when installing the hose pipes or wire
harness to avoid the hose damaged by the sharp goods.
● Please prohibit to handle the refrigerant in the airtight
space.
● Please don’t wear the bijouterie, watch, earrings, etc.,
these goods can cause a electric short and lead to the severe
burns.
II Inspection Before Installing Bus Air Conditioning
system
1. Please check that if the model of A/C unit is suitable for the bus; if the appearance
& quality can meet the requirement.
2. Please check that if all the bus air conditioner spare parts are ready.
3. Please check that if the installation space is safe and installation operators are all
ready.
III Installation Process of roof mounted Bus Air
Conditioner
1. Cleaning the roof of the bus, and lift the bus air conditioner unit or minibus air
conditioner unit to the top of the bus.
2. Sticking the sponge all around the air outlet and air return on the roof of the bus,
please ensure there is airtight and no space.
3. Daub the glue (SIKA GLUE) around of the stuck sponges and ensure there is no
leak.
4. Put the shock pad on the pre-processing bolt’s or installation hole’s location, and
glue the bottom of bolt or shock pad before put on them.
5. Put the shock pads under the condenser.
6. Hoist the condenser and evaporator onto the roof of the bus, please ensure
hooked the hoisting-ear of the bus A/C unit (bus air conditioner units) and hoist
uprightly.
7. Corresponding the installation hole or pre-processing bolt and glue them.
8. Install the bolt into the stuck installation hole, or tight the nut,
spring pad, washer, then glue them.
9. Connect the condenser and evaporator, daub the
refrigeration oil or frozen on the O-ring when connecting.
10. Daub the glue (SIKA GLUE) and smudging it evenly
around the air-outlet and air-return area which are internal of
the bus.
11. Installation of Compressor Assy.
◆ The pontes of hoses and cooper pipes should be fixed tightly by clamp.
◆ The belt between engine and idle pulley must be tighten.
◆ The compressor assy. can’t touch other components of the bus body, avoid the hose
damaged by sharp goods, and try to keep the radiating of the compressor assy.
12. Connecting of the Hose Pipes
◆ The sealing asbestos mat should be keep flat in the fittings
and daub the refrigerant oil;
◆ The port of the connector should be correspond the inlet or
outlet of the evaporator
hoses’ connector, fixed and tight the two sides’ bolt in the same
time.
13. The joint & outlet place of wire harness should be glue
and keep airtight. The drainage hose & wire harness should
be tightened by clamp
14. Fixed the cover of condenser and evaporator after
complete all the connections. And the roof mounted bus air conditioner is finished.
15. The last steps, pumping air into vacuum state after confirming there has no
leakage, then fill up the refrigerant and debugging the A/C system.
The end.