EARTHWORKS & TEMPORARY WORKS FOR
TAMAN ARA DAMAI
KERJA TANAH UNTUK CADANGAN PEMBANGUNAN BERCAMPUR YANG TERDIRI DARIPADA :
1. 77 UNIT KEDAI PEJABAT 2 TINGKAT ( 20'x 60')
2. 74 UNIT RUMAH BERKEMBAR 1 TINGKAT (32'x 80')
3. 1450 UNIT RUMAH TERES 1 TINGKAT (20'x 70')
4. 468 UNIT RUMAH KOS RENDAH "TOWN HOUSE"HAK MILIK STRATA (650 KP/UNIT) DENGAN KEMUDAHAN MASYARAKAT
(DEWAN ORANG RAMAI/
TADIKA/PEJABAT PENGURUSAN)
5. 1 UNIT DEWAN ORANG RAMAI
6. 1 TAPAK SEKOLAH
7. 1 TAPAK SURAU
8. 1 TAPAK PENJAJA DAN PASAR
9. 1 TAPAK RUMAH IBADAT BUKAN ISLAM
10. 3 TAPAK KEMAJUAN MASA HADAPAN (PERNIAGAAN)
11. 1 TAPAK LOJI KUMBAHAN
12. 1 UNIT TAPAK PPU
13. 8 UNIT PENCAWANG TNB
14. 1 UNIT PENCAWANG TNB PADAT
DI ATAS LOT 1640, JALAN TASEK GELUGOR - ARA KUDA , MUKIM 13, SEBERANG PERAI UTARA, PULAU PINANG.
UNTUK TETUAN QUALIFIED MANAGEMENT CONSORTIUM SDN BHD.
                                                        FINAL SUMMARY
 Item                                         Description                                               Amount (RM)
  1     Preliminaries
  2     Prime Cost & Provisional Sums
  3     Earthworks & Temporary Works:-
        3.1 - Phase 1
        3.2 - Phase 2
        3.3 - Phase 3
        3.4 - Phase 4
        3.5 - Phase 5
                               TOTAL CARRIED TO FORM OF TENDER
                                   *************************
        NOTE :
        The client reserves the rigth to omit any part of the works/phase at any time, the Contractor
        shall have no claim against the client for any alleged loss of profit or expense.
        CONTRACTOR          : __________________________________
        COMPANY STAMP : __________________________________
        WITNESS             : __________________________________
        DATE               : __________________________________
                                                                                                  BILL NO. 1 PRELIMINARIES
                                                                                                            Amount
Item                                                          Description
                                                                                                             (RM)
       PRELIMINARIES
 1     Setting Out & Final As Built Drawing by Licensed Surveyor
       *OGL Survey by Licensed Surveyor (appointed by MVG) and submit for approval before start
       work.
       a) Overall site OGL before site clearance
       b) Section Ground Survey by phasing after site clearance
       c) Sectional as built survey, ditto.
 2     Supply Labour including Tools and Equipment for Road Cleaning
 3     Supply Labour and Material for Traffic Signages and Traffic Control
       (including all safety signages, plastic barriers and flagmen for the works)
 4     Contractor to quote and allow Security Services for the works (Provision : 6 months)
       6 months x RM 3,000.00 / month
 5     Temporary Electrical and Water Supply
 6     Workers' Quarters
 7     Site Office
 8     Site Meetings
 9     Work Programme
10     Plant
11     Site Management Cost ( Include site engineer , site safety supervisor)
12     Safety Measure
13     Final Cleaning / Leave Perfect
14     Dewatering of existing pond
15     Temporary Slope Protection
16     TMP Report
       Notes : Preliminary items provided by MVG
 a)    CIDB Levy
 b)    CAR & WC insurance
 c)    Security Guards
       TOTAL AMOUNT (RM)
                                                                   BILL NO 2: PROVISIONAL SUM
 Item                               Description                                  Amount
                                                                                  (RM)
        PROVISIONAL SUMS
        Provide the following Provisional Sums to be expended as directed by
        the Architect, in accordance with Clause 11 of the Schedule of
        Conditions, or deducted wholly or in part.
        i.) Contingencies
Total Carried To Summary RM                                                               -
                                                                                   PC&PV sum/3
                                                                                       BILL NO.3.1 - EARTHWORKS & TEMPORARY WORKS
                                                                                                            PHASE 1 (ALL PROVISIONAL)
Item                                  Description                                    Unit     Qty           Rate           Amount
                                                                                                                            (RM)
       EARTHWORKS & TEMPORARY WORKS (ALL PROVISIONAL)
       SITE PREPARATION (All Provisional)
 1     Allow for taking over the site, clear site and remove of 150mm thick top      Item      1
       soil and clear the area of all rubbish, debris, grass, lalang creepers,
       undergrowth and shrubs including cutting down and destumping existing
       trees of all types and size where directed and grubbing up roots
       demolish of existing superficial obstruction etc. as per S.O.'s instruction
       and disposal to Contractor's own dump off site.
       (Approximately 31.13 acres / 125,979 m2)
       EARTHWORKS (All Provisional)
 2     Excavate through all classes of materials over site (except rock) to final    M3       932
       requisite reduced levels as shown on the drawings including
       compaction, cuting, trimming, forming banks; move suitable excavated
       materials to fill low area on site compaction and consolidated in layers
       as described to requisite final levels as shown on drawings including
       trimming and forming banks and slopes.
 3     Selected imported earth obtained by the Contractor from his own souces        M3        1                          Rate Only
       in filing to make up levels for the road reserve and part of building
       platform, consolidate in layers as described to requisite final levels
       including forming platforms, banks and slopes.
 4     Remove of boulders with size exceeding 1m diameter to Contractor's            M3        1                          Rate Only
       own dump off site.
       Turfing on Sloping Surface
 5     Close turfing with axonopus grass in embankment and slopping surfaces         M2      1,490
       on and including of 50mm thick (consilidated) layer of selected black
       vegetable soil obtained by Contractor from his own source; spread and
       level on sloping ground, forking ground, treating with fertilizer,
       protection, watering, tending and maintaining as described.
       Testing Works:-
 6     Allow for Field Density Test (Compaction Test) as per instructed and          No.       30
       approved by Engineer.
                                                                                     C/F
                                                                                     BILL NO.3.1 - EARTHWORKS & TEMPORARY WORKS
                                                                                                          PHASE 1 (ALL PROVISIONAL)
Item                                  Description                                  Unit     Qty           Rate           Amount
                                                                                                                          (RM)
       EARTHWORKS         &   TEMPORARY       WORKS       (ALL   PROVISIONAL       B/F
       (COND'T)
       Rock Excavation
 1     Excavation through rock by chemical rock breaking as described to final
       requisite reduced levels including cutting, trimming, and forming banks,
       removal of excavated material to Contractor's own dump off site
       approved by the authorities; and pay all levy and charges.
  i    Quantity ≤ 500m3                                                            M3        1                          Rate Only
 ii    500m3 < Quantity ≤ 1000m3                                                   M3        1                          Rate Only
 iii   Quantity > 1000m3                                                           M3        1                          Rate Only
 2     Excavation through rock by control blasting as described to final
       requistite reduced levels including cutting, trimming, and forming banks,
       removal of excavated material to Contractor's own dump off site
       apporved by the authorities; and pay all levy and charges.
  i    Quantity ≤ 500m3                                                            M3        1                          Rate Only
 ii    500m3 < Quantity ≤ 1000m3                                                   M3        1                          Rate Only
 iii   Quantity > 1000m3                                                           M3        1                          Rate Only
 3     Excavation through rock by mechanical drilling and hacking as
       described to final requisite reduced levels including cutting, trimming,
       and forming banks, removal of excavated material to Contractor's own
       dump off site approved by the authorities; and pay all levy and charges.
  i    Quantity ≤ 500m3                                                            M3        1                          Rate Only
 ii    500m3 < Quantity ≤ 1000m3                                                   M3        1                          Rate Only
 iii   Quantity > 1000m3                                                           M3        1                          Rate Only
 4     Extra over for excavation through hard material using excavator dipping     M3        1                          Rate Only
       as described to final requisite reduced level including cutting, trimming
       and forming bank , remove excavated material within site
                                                                                   C/F
                                                                                         BILL NO.3.1 - EARTHWORKS & TEMPORARY WORKS
                                                                                                              PHASE 1 (ALL PROVISIONAL)
Item                                    Description                                    Unit     Qty           Rate           Amount
                                                                                                                              (RM)
        EARTHWORKS         &   TEMPORARY        WORKS       (ALL   PROVISIONAL         B/F
        (COND'T)
        Note :-
        The Contractor shall allow for all necessary desilting and maintenance of
        all the following temporary works during the contract period; demolished
        the works and reinstate, make good and/ or complete the site to original
        or proposed conditions upon completion of the project; removal and
        clear all debris to Contractor's own dump off site.
        Temporary Earth Drain And Check Dam
 1      Construct, complete temporary earth drains to final requisite levels
        including construction of check dams; maintain and allow for shifting
        during the Contract period; all as shown in the drawings and as directed
        by the Engineer:-
 i.     750mm wide (Approximately 2,139m)                                              Item      1
 ii.    1200mm wide (Approximately 1,262m)                                             Item      1
 iii.   Extra over for check dam                                                       No.       1
        Temporary Earth Bund
 2      To compact and form the Earth Bund all in accordance to Engineer's             Item      1
        drawing; maintain and allow for shifting during the Contract period, all as
        shown in the drawings and as directed by the Engineer. (Approximately
        2,139m)
        Temporary Washing Bay (Tyre Wash Basin)
 3      Construct and complete temporary washing bay overall size 11100mm              No.       1
        (L) x 4025mm (W) x 550mm (D); and 26100mm (L) x 6200(W) x 200mm
        (T) compacted crusher run; complete with water jet with pump and
        electrical instaltion; RC slab, RC drain, MS Grating over concrete drain,
        angle vane at 500mm c/c, drainage channel, 700mm x 350mm
        stopboard, 230mm diameter PVC pipe discharge to nearest drain,
        38mm diameter (OD) stand pipe; including all necessary excavation,
        lean concrete, backfilling, removal of surplus material off site; all as per
        drawings. (The Contractor shall maintain and desilting the silt trao during
        the contract period; demolish and make good of all disturbed upon the
        completion of works.)
        Area : 44.6775 m2 99.90m2
                                                                                       C/F
                                                                                                BILL NO.3.1 - EARTHWORKS & TEMPORARY WORKS
                                                                                                                     PHASE 1 (ALL PROVISIONAL)
Item                                      Description                                         Unit     Qty           Rate           Amount
                                                                                                                                     (RM)
       EARTHWORKS           &    TEMPORARY          WORKS       (ALL     PROVISIONAL          B/F
       (COND'T)
       Temporary Wet Sedimentation Pond
 4     Construct and complete temporary sedimentation pond overall size                       No.       1
       5187.811m2 x 1.80m depth complete with 50mm x 50mm angle iron,
       150mm x 20mm HW timber, bolt and nut to Engineer's detail, temporary
       earthdrain, emergency spillway, 900mm diameter RC pipe culvert
       discharge to nearest existing drain, and all necessary works including
       maintenance during contract period, demolition and backfill with earh
       complete with compaction of the whole works; all as shown in the
       drawing and as directed by the Engineer.
       Premix Access Road
 1     Trim, level and grade formation to form required cambers and gradients,                M2       186
       well consolidated and compacted. (CBR test to be carried out on the
       subgrade and must exceed 10% in accordance to B.S. 1377 as per
       Engineer's details.)
 2     300mm thick consolidated of 50mm down crusher run base course                          M2       186
       covered with broken stone of 20 max nominal size blinded with quarry
       dust watered and thoroughly consolidated by meands of a 25 ton roller.
 3     65mm thick (consolidated) asphaltic concrete mix binder as described,                  M2       186
       spread, leveled and rolled to falls and cambers, including one layer of
       tack coat at the rate as specified before laying.
 4     62.5mm thick (consolidated) asphaltic concrete mix wearing course as                   M2       186
       described, spread, leveled and rolled to falls and cambers, including
       one layer of tack coat at the rate as specified before laying.
 5     Temporary Metal Hoarding
 a     Supply and install overll height 1650mm with 0.6mm thick colourbond metal               M        1                          Rate Only
       deck cladding, complete with 50mm x 75mm RHS GI post at 1500mm c/c,
       50mm x 100mm RHS Strut and 50mm x 75mm RHS horizontal support
       including bolts and nuts, excavation, part backfill, concrete foundation with
       blinding, painting work to all exposed surface of mild steel section; all as per
       Engineer's details drawings.
 b     Supply and install overall height 1700mm with 0.36mm thick colourbond metal             M        1                          Rate Only
       deck cladding, complete with 50mm x 50mm x 1.2mm hollow section steel
       vertical post at 3000mm c/c, 25mm x 50mm x 1.2mm hollow section steel
       horizontal post (3 nos in middle) and 25mm x 25mm x 1.2mm hollow section
       steel support post including bolts and nuts, excavation, part backfill, concrete
       foundation with blinding, painting work to all exposed surface of mild steel
       section; all as per Engineer's details drawings.
       Temporary Entrance Gate
 6     Supply and install overall size 7000mm x 1650mm entrance gate with 100mm x             Nos.      1                          Rate Only
       100mm x 3.0mm thk RHS post, 100mm x 50mm x 2.3mm thick RHS structure
       complete with 0.6mm thick colourbond metal deck cladding; including bolts and
       nuts, excavation, part backfill, concrete foundation with blinding, painting work
       to all exposed surface of mild steel section; all as per Engineer's details drawngs.
       Total Carried to Summary
                                                                                       BILL NO.3.2 - EARTHWORKS & TEMPORARY WORKS
                                                                                                           PHASE 2 (ALL PROVISIONAL)
Item                                  Description                                    Unit     Qty           Rate          Amount
                                                                                                                           (RM)
       EARTHWORKS & TEMPORARY WORKS (ALL PROVISIONAL)
       SITE PREPARATION (All Provisional)
 1     Allow for taking over the site, clear site and remove of 150mm thick top      Item      1
       soil and clear the area of all rubbish, debris, grass, lalang creepers,
       undergrowth and shrubs including cutting down and destumping existing
       trees of all types and size where directed and grubbing up roots
       demolish of existing superficial obstruction etc. as per S.O.'s instruction
       and and disposal to Contractor's own dump off site.
       (Approximately 63.30 acres / 256,166 m2)
       EARTHWORKS (All Provisional)
 2     Excavate through all classes of materials over site (except rock) to final    M3      478,973
       requisite reduced levels as shown on the drawings including
       compaction, cuting, trimming, forming banks; move suitable excavated
       materials to fill low area on site compaction and consolidated in layers
       as described to requisite final levels as shown on drawings including
       trimming and forming banks and slopes.
 3     Selected imported earth obtained by the Contractor from his own               M3        1                         Rate Only
       souces in filing to make up levels for the road reserve and part of
       building platform, consolidate in layers as described to requisite final
       levels including forming platforms, banks and slopes.
 4     Remove of boulders with size exceeding 1m diameter to Contractor's            M3        1                         Rate Only
       own dump off site.
       Turfing on Sloping Surface
 5     Close turfing with axonopus grass in embankment and slopping                  M2       3,001
       surfaces on and including of 50mm thick (consilidated) layer of selected
       black vegetable soil obtained by Contractor from his own source;
       spread and level on sloping ground, forking ground, treating with
       fertilizer, protection, watering, tending and maintaining as described.
       Testing Works:-
 6     Allow for Field Density Test (Compaction Test) as per instructed and          No.       80
       approved by Engineer.
                                                                                     C/F
                                                                                     BILL NO.3.2 - EARTHWORKS & TEMPORARY WORKS
                                                                                                         PHASE 2 (ALL PROVISIONAL)
Item                                  Description                                  Unit     Qty           Rate          Amount
                                                                                                                         (RM)
       EARTHWORKS & TEMPORARY WORKS (ALL PROVISIONAL)                              B/F
       Rock Excavation
 1     Excavation through rock by chemical rock breaking as described to final
       requisite reduced levels including cutting, trimming, and forming banks,
       removal of excavated material to Contractor's own dump off site
       approved by the authorities; and pay all levy and charges.
   i   Quantity ≤ 500m3                                                            M3        1                         Rate Only
  ii   500m3 < Quantity ≤ 1000m3                                                   M3        1                         Rate Only
 iii   Quantity > 1000m3                                                           M3        1                         Rate Only
 2     Excavation through rock by control blasting as described to final
       requistite reduced levels including cutting, trimming, and forming banks,
       removal of excavated material to Contractor's own dump off site
       apporved by the authorities; and pay all levy and charges.
   i   Quantity ≤ 500m3                                                            M3        1                         Rate Only
  ii   500m3 < Quantity ≤ 1000m3                                                   M3        1                         Rate Only
 iii   Quantity > 1000m3                                                           M3        1                         Rate Only
 3     Excavation through rock by mechanical drilling and hacking as
       described to final requisite reduced levels including cutting, trimming,
       and forming banks, removal of excavated material to Contractor's own
       dump off site approved by the authorities; and pay all levy and charges.
   i   Quantity ≤ 500m3                                                            M3        1                         Rate Only
  ii   500m3 < Quantity ≤ 1000m3                                                   M3        1                         Rate Only
 iii   Quantity > 1000m3                                                           M3        1                         Rate Only
 4     Extra over for excavation through hard material using excavator dipping     M3        1                         Rate Only
       as described to final requisite reduced level including cutting, trimming
       and formiong bank , remove excavated material within site
                                                                                   C/F
                                                                                       BILL NO.3.2 - EARTHWORKS & TEMPORARY WORKS
                                                                                                           PHASE 2 (ALL PROVISIONAL)
Item                                  Description                                    Unit     Qty           Rate          Amount
                                                                                                                           (RM)
       EARTHWORKS & TEMPORARY WORKS (ALL PROVISIONAL                                 B/F
       (COND'T)
       Note :-
       The Contractor shall allow for all necessary desilting and maintenance
       of all the following temporary works during the contract period;
       demolished the works and reinstate, make good and/ or complete the
       site to original or proposed conditions upon completion of the project;
       removal and clear all debris to Contractor's own dump off site.
       Temporary Earth Drain And Check Dam
 1     Construct, complete temporary earth drains to final requisite levels
       including construction of check dams; maintain and allow for shifting
       during the Contract period; all as shown in the drawings and as directed
       by the Engineer:-
 i.    750mm wide, (Approximately 3,111m)                                            Item      1
       Temporary Earth Bund
 2     To compact and form the Earth Bund all in accordance to Engineer's            Item      1
       drawing; maintain and allow for shifting during the Contract period, all as
       shown in the drawings and as directed by the Engineer. (Approximately
       3,111m)
       Temporary Wet Sedimentation Pond
 3     Construct and complete temporary sedimentation pond overall size              No.       1
       5187.811m2 x 1.80m depth complete with 50mm x 50mm angle iron,
       150mm x 20mm HW timber, bolt and nut to Engineer's detail, temporary
       earthdrain, emergency spillway, 900mm diameter RC pipe culvert
       discharge to nearest existing drain, and all necessary works including
       maintenance during contract period, demolition and backfill with earh
       complete with compaction of the whole works; all as shown in the
       drawing and as directed by the Engineer.
 5     Temporary Metal Hoarding
 a     Supply and install overall height 1650mm with 0.6mm thick colourbond           M        1                         Rate Only
       metal deck cladding, complete with 50mm x 75mm RHS GI post at
       1500mm c/c, 50mm x 100mm RHS Strut and 50mm x 75mm RHS
       horizontal support including bolts and nuts, excavation, part backfill,
       concrete foundation with blinding, painting work to all exposed surface
       of mild steel section; all as per Engineer's details drawings.
 b     Supply and install overall height 1700mm with 0.36mm thick colourbond          M        1                         Rate Only
       metal deck cladding, complete with 50mm x 50mm x 1.2mm hollow
       section steel vertical post at 3000mm c/c, 25mm x 50mm x 1.2mm
       hollow section steel horizontal post (3 nos in middle) and 25mm x 25mm
       x 1.2mm hollow section steel support post including bolts and nuts,
       excavation, part backfill, concrete foundation with blinding, painting work
       to all exposed surface of mild steel section; all as per Engineer's details
       drawings.
       Total Carried to Summary
                                                                                                BILL NO.3.3 - EARTHWORKS & TEMPORARY WORKS
                                                                                                                    PHASE 3 (ALL PROVISIONAL)
Item                                       Description                                        Unit     Qty           Rate          Amount
                                                                                                                                    (RM)
       EARTHWORKS & TEMPORARY WORKS (ALL PROVISIONAL)
       SITE PREPARATION (All Provisional)
 1     Allow for taking over the site, clear site and remove of 150mm thick top soil and      Item      1
       clear the area of all rubbish, debris, grass, lalang creepers, undergrowth and
       shrubs including cutting down and destumping existing trees of all types and size
       where directed and grubbing up roots demolish of existing superficial obstruction
       etc. as per S.O.'s instruction and disposal to Contractor's own dump off site.
       (Approximately 41.36 acres / 167,378 m2)
       EARTHWORKS (All Provisional)
 2     Excavate through all classes of materials over site (except rock) to final requisite   M3      234,484
       reduced levels as shown on the drawings including compaction, cuting, trimming,
       forming banks; move suitable excavated materials to fill low area on site around
       Phase 3 area, compaction and consolidated in layers as described to requisite
       final levels as shown on drawings including trimming and forming banks and
       slopes.
 3     Excavate through all classes of materials over site (except rock) to final requisite   M3      297,452
       reduced levels as shown on the drawings including compaction, cuting, trimming,
       forming banks; move suitable excavated materials to fill low area on site around
       Phases 1, 2 & 4, compaction and consolidated in layers as described to requisite
       final levels as shown on drawings including trimming and forming banks and
       slopes.
 4     Selected imported earth obtained by the Contractor from his own souces in filing       M3        1                         Rate Only
       to make up levels for the road reserve and part of building platform, consolidate
       in layers as described to requisite final levels including forming platforms, banks
       and slopes.
 5     Remove of boulders with size exceeding 1m diameter to Contractor's own dump            M3        1                         Rate Only
       off site.
       Turfing on Sloping Surface
 6     Close turfing with axonopus grass in embankment and slopping surfaces on and           M2       4,431
       including of 50mm thick (consilidated) layer of selected black vegetable soil
       obtained by Contractor from his own source; spread and level on sloping ground,
       forking ground, treating with fertilizer, protection, watering, tending and
       maintaining as described.
       Testing Works:-
 7     Allow for Field Density Test (Compaction Test) as per instructed and approved by       No.       40
       Engineer.
                                                                                              C/F
                                                                                             BILL NO.3.3 - EARTHWORKS & TEMPORARY WORKS
                                                                                                                 PHASE 3 (ALL PROVISIONAL)
Item                                     Description                                       Unit     Qty           Rate          Amount
                                                                                                                                 (RM)
       EARTHWORKS & TEMPORARY WORKS (ALL PROVISIONAL                                       B/F
       (COND'T)
       Rock Excavation
 8     Excavation through rock by chemical rock breaking as described to final requisite
       reduced levels including cutting, trimming, and forming banks, removal of
       excavated material to Contractor's own dump off site approved by the authorities;
       and pay all levy and charges.
   i   Quantity ≤ 500m3                                                                    M3        1                         Rate Only
  ii   500m3 < Quantity ≤ 1000m3                                                           M3        1                         Rate Only
 iii   Quantity > 1000m3                                                                   M3        1                         Rate Only
 9     Excavation through rock by control blasting as described to final requistite
       reduced levels including cutting, trimming, and forming banks, removal of
       excavated material to Contractor's own dump off site apporved by the authorities;
       and pay all levy and charges.
   i   Quantity ≤ 500m3                                                                    M3        1                         Rate Only
  ii   500m3 < Quantity ≤ 1000m3                                                           M3        1                         Rate Only
 iii   Quantity > 1000m3                                                                   M3        1                         Rate Only
10     Excavation through rock by mechanical drilling and hacking as described to final
       requisite reduced levels including cutting, trimming, and forming banks, removal
       of excavated material to Contractor's own dump off site approved by the
       authorities; and pay all levy and charges.
   i   Quantity ≤ 500m3                                                                    M3        1                         Rate Only
  ii   500m3 < Quantity ≤ 1000m3                                                           M3        1                         Rate Only
 iii   Quantity > 1000m3                                                                   M3        1                         Rate Only
11     Extra over for excavation through hard material using excavator dipping             M3        1                         Rate Only
       as described to final requisite reduced level including cutting, trimming
       and formiong bank , remove excavated material within site
                                                                                           C/F
                                                                                       BILL NO.3.3 - EARTHWORKS & TEMPORARY WORKS
                                                                                                           PHASE 3 (ALL PROVISIONAL)
Item                                   Description                                   Unit     Qty           Rate          Amount
                                                                                                                           (RM)
       EARTHWORKS & TEMPORARY WORKS (ALL PROVISIONAL                                 B/F
       (COND'T)
       Note :-
       The Contractor shall allow for all necessary desilting and maintenance
       of all the following temporary works during the contract period;
       demolished the works and reinstate, make good and/ or complete the
       site to original or proposed conditions upon completion of the project;
       removal and clear all debris to Contractor's own dump off site.
       Temporary Earth Drain And Check Dam
 1     Construct, complete temporary earth drains to final requisite levels
       including construction of check dams; maintain and allow for shifting
       during the Contract period; all as shown in the drawings and as directed
       by the Engineer:-
 i.    750mm wide (Approximately 2,256m)                                             Item      1
       Temporary Earth Bund
 2     To compact and form the Earth Bund all in accordance to Engineer's            Item      1
       drawing; maintain and allow for shifting during the Contract period, all as
       shown in the drawings and as directed by the Engineer. (Approximately
       2,256m)
 3     Temporary Metal Hoarding
 a     Supply and install overll height 1650mm with 0.6mm thick colourbond            M        1                         Rate Only
       metal deck cladding, complete with 50mm x 75mm RHS GI post at
       1500mm c/c, 50mm x 100mm RHS Strut and 50mm x 75mm RHS
       horizontal support including bolts and nuts, excavation, part backfill,
       concrete foundation with blinding, painting work to all exposed surface
       of mild steel section; all as per Engineer's details drawings.
 b     Supply and install overall height 1700mm with 0.36mm thick colourbond          M        1                         Rate Only
       metal deck cladding, complete with 50mm x 50mm x 1.2mm hollow
       section steel vertical post at 3000mm c/c, 25mm x 50mm x 1.2mm
       hollow section steel horizontal post (3 nos in middle) and 25mm x 25mm
       x 1.2mm hollow section steel support post including bolts and nuts,
       excavation, part backfill, concrete foundation with blinding, painting work
       to all exposed surface of mild steel section; all as per Engineer's details
       drawings.
       Total Carried to Summary
                                                                                            BILL NO.3 - EARTHWORKS & TEMPORARY WORKS
                                                                                                              PHASE 4 (ALL PROVISIONAL)
Item                                  Description                                    Unit         Qty          Rate          Amount
                                                                                                                              (RM)
       EARTHWORKS & TEMPORARY WORKS (ALL PROVISIONAL)
       SITE PREPARATION (All Provisional)
 1     Allow for taking over the site, clear site and remove of 150mm thick top      Item          1
       soil and clear the area of all rubbish, debris, grass, lalang creepers,
       undergrowth and shrubs including cutting down and destumping existing
       trees of all types and size where directed and grubbing up roots
       demolish of existing superficial obstruction etc. as per S.O.'s instruction
       and disposal to Contractor's own dump off site.
       (Approximately 46.14 acres / 186,722 m2)
       EARTHWORKS (All Provisional)
 2     Excavate through all classes of materials over site (except rock) to final    M3           312
       requisite reduced levels as shown on the drawings including
       compaction, cuting, trimming, forming banks; move suitable excavated
       materials to fill low area on site compaction and consolidated in layers
       as described to requisite final levels as shown on drawings including
       trimming and forming banks and slopes.
 3     Selected imported earth obtained by the Contractor from his own               M3         203,459
       souces in filing to make up levels for the road reserve and part of
       building platform, consolidate in layers as described to requisite final
       levels including forming platforms, banks and slopes.
 4     Remove of boulders with size exceeding 1m diameter to Contractor's            M3            1                        Rate Only
       own dump off site.
       Turfing on Sloping Surface
 5     Close turfing with axonopus grass in embankment and slopping                  M2           478
       surfaces on and including of 50mm thick (consilidated) layer of selected
       black vegetable soil obtained by Contractor from his own source;
       spread and level on sloping ground, forking ground, treating with
       fertilizer, protection, watering, tending and maintaining as described.
       Testing Works:-
 6     Allow for Field Density Test (Compaction Test) as per instructed and          No.          50
       approved by Engineer.
                                                                                     C/F
                                                                                          BILL NO.3 - EARTHWORKS & TEMPORARY WORKS
                                                                                                            PHASE 4 (ALL PROVISIONAL)
Item                                  Description                                  Unit         Qty          Rate          Amount
                                                                                                                            (RM)
       EARTHWORKS & TEMPORARY WORKS (ALL PROVISIONAL                               B/F
       (COND'T)
       Rock Excavation
 1     Excavation through rock by chemical rock breaking as described to final
       requisite reduced levels including cutting, trimming, and forming banks,
       removal of excavated material to Contractor's own dump off site
       approved by the authorities; and pay all levy and charges.
   i   Quantity ≤ 500m3                                                            M3            1                        Rate Only
  ii   500m3 < Quantity ≤ 1000m3                                                   M3            1                        Rate Only
 iii   Quantity > 1000m3                                                           M3            1                        Rate Only
 2     Excavation through rock by control blasting as described to final
       requistite reduced levels including cutting, trimming, and forming banks,
       removal of excavated material to Contractor's own dump off site
       apporved by the authorities; and pay all levy and charges.
   i   Quantity ≤ 500m3                                                            M3            1                        Rate Only
  ii   500m3 < Quantity ≤ 1000m3                                                   M3            1                        Rate Only
 iii   Quantity > 1000m3                                                           M3            1                        Rate Only
 3     Excavation through rock by mechanical drilling and hacking as
       described to final requisite reduced levels including cutting, trimming,
       and forming banks, removal of excavated material to Contractor's own
       dump off site approved by the authorities; and pay all levy and charges.
   i   Quantity ≤ 500m3                                                            M3            1                        Rate Only
  ii   500m3 < Quantity ≤ 1000m3                                                   M3            1                        Rate Only
 iii   Quantity > 1000m3                                                           M3            1                        Rate Only
 4     Extra over for excavation through hard material using excavator dipping     M3            1                        Rate Only
       as described to final requisite reduced level including cutting, trimming
       and formiong bank , remove excavated material within site
                                                                                   C/F
                                                                                             BILL NO.3 - EARTHWORKS & TEMPORARY WORKS
                                                                                                               PHASE 4 (ALL PROVISIONAL)
Item                                   Description                                    Unit         Qty          Rate          Amount
                                                                                                                               (RM)
       EARTHWORKS & TEMPORARY WORKS (ALL PROVISIONAL                                  B/F
       (COND'T)
       Note :-
       The Contractor shall allow for all necessary desilting and maintenance
       of all the following temporary works during the contract period;
       demolished the works and reinstate, make good and/ or complete the
       site to original or proposed conditions upon completion of the project;
       removal and clear all debris to Contractor's own dump off site.
       Temporary Earth Drain And Check Dam
 1     Construct, complete temporary earth drains to final requisite levels
       including construction of check dams; maintain and allow for shifting
       during the Contract period; all as shown in the drawings and as directed
       by the Engineer:-
 i.    750mm wide (Approximately 2,391m)                                              Item          1
ii.    Extra over for check dam                                                       No.           1
       Temporary Earth Bund
 2     To compact and form the Earth Bund all in accordance to Engineer's             Item          1
       drawing; maintain and allow for shifting during the Contract period, all as
       shown in the drawings and as directed by the Engineer. (Approximately
       2,391m)
       Temporary Washing Bay (Tyre Wash Basin)
 3     Construct and complete temporary washing bay overall size 11100mm              No.           1
       (L) x 4025mm (W) x 550mm (D); and 26100mm (L) x 6200(W) x 200mm
       (T) compacted crusher run; complete with water jet with pump and
       electrical instaltion; RC slab, RC drain, MS Grating over concrete drain,
       angle vane at 500mm c/c, drainage channel, 700mm x 350mm
       stopboard, 230mm diameter PVC pipe discharge to nearest drain,
       38mm diameter (OD) stand pipe; including all necessary excavation,
       lean concrete, backfilling, removal of surplus material off site; all as per
       drawings. (The Contractor shall maintain and desilting the silt trao
       during the contract period; demolish and make good of all disturbed
       upon the completion of works.)
       Temporary Wet Sedimentation Pond
 4     Construct and complete temporary sedimentation pond overall size               No.           1                        Rate Only
       5187.811m2 x 1.80m depth complete with 50mm x 50mm angle iron,
       150mm x 20mm HW timber, bolt and nut to Engineer's detail, temporary
       earthdrain, emergency spillway, 900mm diameter RC pipe culvert
       discharge to nearest existing drain, and all necessary works including
       maintenance during contract period, demolition and backfill with earh
       complete with compaction of the whole works; all as shown in the
       drawing and as directed by the Engineer.
                                                                                      C/F
                                                                                            BILL NO.3 - EARTHWORKS & TEMPORARY WORKS
                                                                                                              PHASE 4 (ALL PROVISIONAL)
Item                                  Description                                    Unit         Qty          Rate          Amount
                                                                                                                              (RM)
       EARTHWORKS & TEMPORARY WORKS (ALL PROVISIONAL                                 B/F
       (COND'T)
       Premix Access Road
 1     Trim, level and grade formation to form required cambers and gradients,       M2            1                        Rate Only
       well consolidated and compacted. (CBR test to be carried out on the
       subgrade and must exceed 10% in accordance to B.S. 1377 as per
       Engineer's details.)
 2     300mm thick consolidated of 50mm down crusher run base course                 M2            1                        Rate Only
       covered with broken stone of 20 max nominal size blinded with quarry
       dust watered and thoroughly consolidated by meands of a 25 ton roller.
 3     65mm thick (consolidated) asphaltic concrete mix binder as described,         M2            1                        Rate Only
       spread, leveled and rolled to falls and cambers, including one layer of
       tack coat at the rate as specified before laying.
 4     62.5mm thick (consolidated) asphaltic concrete mix wearing course as          M2            1                        Rate Only
       described, spread, leveled and rolled to falls and cambers, including
       one layer of tack coat at the rate as specified before laying.
 5     Temporary Metal Hoarding
 a     Supply and install overll height 1650mm with 0.6mm thick colourbond            M            1                        Rate Only
       metal deck cladding, complete with 50mm x 75mm RHS GI post at
       1500mm c/c, 50mm x 100mm RHS Strut and 50mm x 75mm RHS
       horizontal support including bolts and nuts, excavation, part backfill,
       concrete foundation with blinding, painting work to all exposed surface
       of mild steel section; all as per Engineer's details drawings.
 b     Supply and install overall height 1700mm with 0.36mm thick colourbond          M            1                        Rate Only
       metal deck cladding, complete with 50mm x 50mm x 1.2mm hollow
       section steel vertical post at 3000mm c/c, 25mm x 50mm x 1.2mm
       hollow section steel horizontal post (3 nos in middle) and 25mm x 25mm
       x 1.2mm hollow section steel support post including bolts and nuts,
       excavation, part backfill, concrete foundation with blinding, painting work
       to all exposed surface of mild steel section; all as per Engineer's details
       drawings.
       Temporary Entrance Gate
 6     Supply and install overall size 7000mm x 1650mm entrance gate with            Nos.          1                        Rate Only
       100mm x 100mm x 3.0mm thk RHS post, 100mm x 50mm x 2.3mm
       thick RHS structure complete with 0.6mm thick colourbond metal deck
       cladding; including bolts and nuts, excavation, part backfill, concrete
       foundation with blinding, painting work to all exposed surface of mild
       steel section; all as per Engineer's details drawngs.
       Total Carried to Summary
                                                                                               BILL NO.3 - EARTHWORKS & TEMPORARY WORKS
                                                                                                                  PHASE 5 (ALL PROVISIONAL)
Item                                    Description                                     Unit        Qty          Rate           Amount
                                                                                                                                 (RM)
       EARTHWORKS & TEMPORARY WORKS (ALL PROVISIONAL)
       SITE PREPARATION (All Provisional)
 1     Allow for taking over the site, clear site and remove of 150mm thick top         Item        1
       soil and clear the area of all rubbish, debris, grass, lalang creepers,
       undergrowth and shrubs including cutting down and destumping existing
       trees of all types and size where directed and grubbing up roots demolish
       of existing superficial obstruction etc. as per S.O.'s instruction and
       disposal to Contractor's own dump off site.
       (Approximately 7.04 acres / 28,490 m2)
       EARTHWORKS (All Provisional)
 2     Excavate through all classes of materials over site (except rock) to final       M3          3
       requisite reduced levels as shown on the drawings including compaction,
       cuting, trimming, forming banks; move suitable excavated materials to fill
       low area on site compaction and consolidated in layers as described to
       requisite final levels as shown on drawings including trimming and
       forming banks and slopes.
 3     Selected imported earth obtained by the Contractor from his own souces           M3        23,605
       in filing to make up levels for the road reserve and part of building
       platform, consolidate in layers as described to requisite final levels
       including forming platforms, banks and slopes.
 4     Remove of boulders with size exceeding 1m diameter to Contractor's               M3          1                           Rate Only
       own dump off site.
       Turfing on Sloping Surface
 5     Close turfing with axonopus grass in embankment and slopping surfaces            M2         158
       on and including of 50mm thick (consilidated) layer of selected black
       vegetable soil obtained by Contractor from his own source; spread and
       level on sloping ground, forking ground, treating with fertilizer, protection,
       watering, tending and maintaining as described.
       Testing Works:-
 6     Allow for Field Density Test (Compaction Test) as per instructed and             No.         5
       approved by Engineer.
                                                                                        C/F
                                                                                           BILL NO.3 - EARTHWORKS & TEMPORARY WORKS
                                                                                                              PHASE 5 (ALL PROVISIONAL)
Item                                  Description                                   Unit        Qty          Rate           Amount
                                                                                                                             (RM)
       EARTHWORKS & TEMPORARY WORKS (ALL PROVISIONAL                                B/F
       (COND'T)
       Rock Excavation
 1     Excavation through rock by chemical rock breaking as described to final
       requisite reduced levels including cutting, trimming, and forming banks,
       removal of excavated material to Contractor's own dump off site
       approved by the authorities; and pay all levy and charges.
   i   Quantity ≤ 500m3                                                             M3          1                           Rate Only
  ii   500m3 < Quantity ≤ 1000m3                                                    M3          1                           Rate Only
 iii   Quantity > 1000m3                                                            M3          1                           Rate Only
 2     Excavation through rock by control blasting as described to final
       requistite reduced levels including cutting, trimming, and forming banks,
       removal of excavated material to Contractor's own dump off site
       apporved by the authorities; and pay all levy and charges.
   i   Quantity ≤ 500m3                                                             M3          1                           Rate Only
  ii   500m3 < Quantity ≤ 1000m3                                                    M3          1                           Rate Only
 iii   Quantity > 1000m3                                                            M3          1                           Rate Only
 3     Excavation through rock by mechanical drilling and hacking as described
       to final requisite reduced levels including cutting, trimming, and forming
       banks, removal of excavated material to Contractor's own dump off site
       approved by the authorities; and pay all levy and charges.
   i   Quantity ≤ 500m3                                                             M3          1                           Rate Only
  ii   500m3 < Quantity ≤ 1000m3                                                    M3          1                           Rate Only
 iii   Quantity > 1000m3                                                            M3          1                           Rate Only
                                                                                    C/F
                                                                                            BILL NO.3 - EARTHWORKS & TEMPORARY WORKS
                                                                                                               PHASE 5 (ALL PROVISIONAL)
Item                                  Description                                    Unit        Qty          Rate           Amount
                                                                                                                              (RM)
       EARTHWORKS & TEMPORARY WORKS (ALL PROVISIONAL                                 B/F
       (COND'T)
       Note :-
       The Contractor shall allow for all necessary desilting and maintenance of
       all the following temporary works during the contract period; demolished
       the works and reinstate, make good and/ or complete the site to original
       or proposed conditions upon completion of the project; removal and clear
       all debris to Contractor's own dump off site.
       Temporary Earth Drain And Check Dam
 1     Construct, complete temporary earth drains to final requisite levels
       including construction of check dams; maintain and allow for shifting
       during the Contract period; all as shown in the drawings and as directed
       by the Engineer:-
 i.    750mm wide (Approximately 201m)                                               Item        1
       Temporary Earth Bund
 2     To compact and form the Earth Bund all in accordance to Engineer's            Item        1
       drawing; maintain and allow for shifting during the Contract period, all as
       shown in the drawings and as directed by the Engineer. (Approximately
       201m)
 3     Temporary Metal Hoarding
 a     Supply and install overll height 1650mm with 0.6mm thick colourbond            M          1                           Rate Only
       metal deck cladding, complete with 50mm x 75mm RHS GI post at
       1500mm c/c, 50mm x 100mm RHS Strut and 50mm x 75mm RHS
       horizontal support including bolts and nuts, excavation, part backfill,
       concrete foundation with blinding, painting work to all exposed surface of
       mild steel section; all as per Engineer's details drawings.
 b     Supply and install overall height 1700mm with 0.36mm thick colourbond          M          1                           Rate Only
       metal deck cladding, complete with 50mm x 50mm x 1.2mm hollow
       section steel vertical post at 3000mm c/c, 25mm x 50mm x 1.2mm hollow
       section steel horizontal post (3 nos in middle) and 25mm x 25mm x
       1.2mm hollow section steel support post including bolts and nuts,
       excavation, part backfill, concrete foundation with blinding, painting work
       to all exposed surface of mild steel section; all as per Engineer's details
       drawings.
       Total Carried to Summary