26           QAD Costing User Guide
In Item Overhead Cost Update, the material percentage is set to 150% and the other percentages to
zero. Use This/Lower Level Costs is set to Lower Level.
Fig. 4.4
Item Overhead Cost Update (1.4.21)
                                                                                                                                  Set to
                                                                                                                                  Lower
                                                                                                                                  Level
This calculation generates overhead costs of 4.50 (150% of 3.00) for item B, 10.50 (150% of 7.00)
for item C, and 15.00 (150% of 10.00) for item A. Items D, E, F, and G have overhead costs of
zero.
Fig. 4.5
Item Overhead Cost Calculation
                                                                                           -
                                                           A                            er
                                                                                is- ow
                                                                             Th      L
                                                        Material                    10.00
                                                        Labor
                                                        Burden
                                                        Overhead            15.00
                                                        Subcontract
                                                    -                                                                         -
                          B                      er                                                   C                     er
                                        i s- o w                                                                    i s- o w
                                      Th     L                                                                    Th     L
                    Material                3.00                                                Material                7.00
                    Labor                                                                       Labor
                    Burden                                                                      Burden
                    Overhead         4.50                                                       Overhead         10.50
                    Subcontract                                                                 Subcontract
                                 -                                     r-                                    -                                   -
        D                     er         E                         e                F                     er         G                        er
                       is- ow                              i s- o w                                is- ow                            i s- o w
                    Th     L                             Th     L                               Th     L                           Th     L
     Material      1.00              Material           2.00                  Material         3.00               Material        4.00
     Labor                           Labor                                    Labor                               Labor
     Burden                          Burden                                   Burden                              Burden
     Overhead      0.00              Overhead           0.00                  Overhead         0.00               Overhead        0.00
     Subcontract                     Subcontract                              Subcontract                         Subcontract
The second product structure cost rollup adds the calculated this-level overhead costs for items D
and E to B, then the costs of F and G to C, then the costs of B and C to A.
Note You cannot calculate this-level costs for a specific cost element based on both this-level and
lower-level cost elements in the same calculation. Calculate this-level costs first for the lowest
level, then the next highest level, and so on. Since you must do lower-level and this-level cost
updates separately, check each level before going to the next.
                                                                                                                             Questions? Visit community.qad.com
                                                                                                                                                 Product Costing Process   27
Fig. 4.6
Results of Second Product Structure Cost Rollup
                                                                                                  -
                                                                     A                         er
                                                                                       is- ow
                                                                                    Th     L
                                                                  Material                 10.00
                                                                  Labor
                                                                  Burden
                                                                  Overhead         15.00       5.00
                                                                  Subcontract
                                                          r   -                                                                          -
                           B                                                                                 C                         er
                                           is
                                                -       we                                                                     i s- o w
                                         Th          Lo                                                                      Th     L
                    Material                        3.00                                               Material                    7.00
                    Labor                                                                              Labor
                    Burden                                                                             Burden
                    Overhead            4.50 0.00                                                      Overhead             10.50 0.00
                    Subcontract                                                                        Subcontract
                                   r-                                        er
                                                                               -                                       r-                                er
                                                                                                                                                            -
       D              is   -     we         E                        i s- o w              F              is   -     we         G               i s- o w
                   Th          Lo                                  Th     L                            Th          Lo                         Th     L
    Material      1.00                  Material                  2.00               Material         3.00                   Material        4.00
    Labor                               Labor                                        Labor                                   Labor
    Burden                              Burden                                       Burden                                  Burden
    Overhead      0.00                  Overhead                  0.00               Overhead         0.00                   Overhead        0.00
    Subcontract                         Subcontract                                  Subcontract                             Subcontract
Processing Considerations
Before running the calculation, consider the following:
  • At which level will you calculate overhead? The lowest level parent item? The highest level
     parent item? The planning level? This decision varies from company to company.
     It is important not to base costs indirectly on themselves. The previous example illustrates why
     you have to be careful. Item A has a lower-level overhead of 15.00 (4.50 + 10.50). However,
     Item Overhead Cost Update also calculated this-level overhead of 15.00 (150% of 10.00, the
     this-level material cost).
     When you run the calculation for item A, you would calculate an overhead cost that is too
     high, unless you want the overhead for A to be 300% of 10.00. In a product structure with
     many levels, the inaccuracies would be even more striking. To prevent this, calculate costs
     from only one level.
  • Which overhead percentage will you use for each level?
     In the item burden and overhead cost update functions, the default percentage is 100%. When
     calculating lower-level costs, typically change this to 0%.
Moving Current Costs to the General Ledger
At least two cost sets are maintained for each item or item and site:
  • The current cost set reflects today’s cost for an item.
  • The GL cost set is used for all general ledger transactions and inventory valuation for an item.
Update the current cost set during cost rollups first, verify the changes, and then copy the updated
costs to the GL cost set.
Moving current costs can have significant effects on the general ledger. All changes to GL costs
create a GL cost adjustment, updating the value of inventory.